Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

2nd November 1940, Page: 132, Column: 1

Ventilation Surveys

By L. R. Boyfield.

Extracts from paper on "Practical Notes on a Ventilation Survey" read at the October meeting of the Midland Counties Institution of Engineers.

At the colliery in which this ventilation survey was made a steam-driven fan, situated at the top of the upcast shaft, circulated 185,000 cubic feet of air per minute, with an underground water-gauge of 6 inches. It was decided in view of future developments that a complete and accurate pressure survey should be made of the airways. This survey, when completed, would give the individual pressure losses along airways due to air-crossings, junctions, bends, and sudden changes in the cross-sectional area ; also the pressure losses due to any particular type and area of support. With the data thus made available, the existing airways, where necessary, could be reconditioned in order to enable them to pass the estimated maximum quantity of air required for the life of the district which they serve, without absorbing too large a ventilating pressure, and thus increasing the water-gauge for the mine. This latter effect would result in too high a figure for the power cost for ventilation.

After consideration of the most suitable means of making the survey to give the information, required, the method of measuring the pressure losses by means of a manometer and pressure pipes was adopted.

Apparatus Employed.

The apparatus consisted of (a) An inclined manometer, to measure the pressure-difference in inches of water and graduated to read from 0 to 0.33 inch in intervals of 0.001 inch ; (b) Two pitot tubes, for measuring the static and total pressures ; (c) Flexible hose pressure piping, 240 yards, ¼-inch diameter — one length of 120 yards and two of 60 yards ; (d) Two rubber tubing connections, from the manometer to the pressure pipes, and two rubber tubing connections from the pitot tubes to the pressure-pipes ; (e) A windmill anemometer, for measuring the velocity of the air at the pitot tubes ; (f) A hygrometer, for measuring the wet and dry-bulb temperature of the air.

The manometer consisted of an aluminium reservoir containing paraffin of specific gravity 0.806, communicating with a curved celluloid gauge-tube. The graduations on the manometer were not evenly spaced but approached nearer to one another towards the downstream end. This was due to the gradient of the gauge-tube, which was not constant. Water was not used in the manometer owing to its being insufficiently fluid and its tendency to stick to the glass, thus giving an irregular meniscus. The manometer was designed to fit on to a theodolite tripod, which made for ready and accurate levelling. The levelling base was of the four-screw type with a Hoffman ball-and-socket joint for quick levelling. To prepare the instrument for use it was set up on the tripod, accurately levelled by the aid of the two bubble levels, the oil cap removed and paraffin poured into it by the aid of a funnel. The displacer-screw for the adjustment of zero position was placed in the halfway position, and the paraffin poured in until the reading was zero.

The pitot tubes were of the standard type with concentric static and total pressure tubes. The centre tube indicated total pressure ; the small holes drilled through the outer tube cause the annulus round the centre tube to be at static pressure. Nipples at the end of the stem enabled the two pressures to be led away by means of rubber connections to the manometer. In the survey the static-pressure tube was connected to the manometer only by means of the pressure-pipes. When the pitot tubes are in use, the head must point directly upstream, and be inclined at the same gradient as the airway. If this precaution is taken corrections are obviated, and the static pressure in the airways is measured direct. To maintain the pitot tubes as the same gradient as the roadway, the cupholders were taken off the heads of two raining dial tripods and discs substituted, and the pitot tubes were fitted through these discs and rested on the heads of the dial legs. The discs held the pitot tubes in position, themselves being secured by three screws on each of the dial heads.

Method of Carrying Out Survey.

As the pressure survey was to cover the ventilating circuit for the mine, it was necessary to divide the survey into a series of small surveys, each following a separate ventilation circuit.

The first survey was commenced from the upcast shaft along the return airway to the coal face, along the face, into the intake airway and back to the downcast shaft. At the junctions where the return airways from other districts joined the return airway which was being surveyed, station marks were left. These station marks were noted as the future starting-points for the surveys of those districts.

Similarly, station marks were left on the intake side at the points where splitting of the air-current occurred. The surveys for such districts were closed on these points, unless the airways were being reconditioned, whereby the resistance of the airway would be altered. In such cases the airway would be re-surveyed, and the different pressure loss determined.

The pressure loss along an airway was obtained by measuring the pressure loss between two points along which the cross-sectional area and support were uniform. Where the type of support altered the pressure loss along the airway for the different type of support was measured. If the change of support was accompanied by a sudden difference in cross-sectional area, the pressure loss due to this change in area was measured separately. These pressure losses were similarly measured at junctions, air-crossings, and bends in the airway. These losses were tabulated in detail and their sum was the total pressure loss for the ventilating circuit under survey.

Precautions Taken.

It is essential that each reading should be made as accurately as possible, as the total W.G. for the ventilating circuit is obtained by adding together the individual pressure losses.

At the time the pressure readings were taken, no person was allowed to stand in the air-current in the airway within 10 yards of the pitot tubes. This was necessary because of the possible effect on the air-velocity, particularly if the area was small. In such case the increased velocity measured would give rise to an appreciable inaccuracy in the pressure-difference.

For the same reason the manometer was not set up at the station point along with the pitot tube.

When recording the static pressure loss due to bends, junctions, or sudden changes in cross-sectional area, the position of the station was such as to allow the large variations in air-velocity and the eddy currents which occur at such points, to approach normal for the airway.

When the pressure-pipe was used for the first reading on any survey, time was allowed for the air in the pressure-pipe and in the manometer to approach the temperature of the airway.

In the case of the mine under consideration, the average underground water-gauge during the period when the pressure survey was made was 6 inches. The total water-gauge obtained on two of the ventilating circuits surveyed was 5.954 and 6.071 inches. Considering the fact that the survey was conducted whilst the pit was working normally, and that each circuit averaged two weeks to complete, the total W.G. obtained by the pressure survey proved that the method adopted was practical and accurate.

Information Derived.

Pressure-distance graphs clearly indicate the points along the airways causing too high a pressure loss. Taking into consideration the estimated maximum quantity of air that the airway will be required to pass, the cross-sectional area and type of support best suited for these conditions can be decided.

To improve the ventilation of a district, it is not a matter of guesswork as to what the area of the roadway should be or what repairs should be carried out. All the facts about the air flowing in that airway should be known, so that the effect of reconditioning the airway by enlarging it or by reducing the angle of the bonds, may be accurately foretold.

Whilst repair work was being carried out on a main intake airway 1,200 yards long and passing 55,000 cubic feet of air per minute, the resistance of the ripping lip was found to be equivalent to 140 feet of the reconditioned airway — the roadway was now being supported by 12-foot splay rings, bricked between rings, while the supports being extracted were 10-foot girders on 7-foot legs.

The effect of this reconditioning, when completed, was to reduce the pressure-drop along the roadway by 0.5 inch W.G. with the same quantity of air passing.

The information obtained by the pressure survey will indicate to the management the points which, if attended to, would quickly repay the cost in improved ventilation. If such surveys were made yearly or half-yearly a complete picture of the mine-ventilation circuits would be always available.

Advantages of Manometer and Pressure-pipe Survey. — The method of survey is a simple one and may be carried out by the ordinary surveying staff. Provided care is taken when setting up the instruments, accurate and precise results can be obtained.

The results obtained give the direct loss of pressure along each length of airway, and no correction for level need be made.

As the manometer reads to 0.001 inch o£ water, the pressure loss along a very short length of airway can be accurately measured.

The resistance of various types of supports for standard lengths, e.g., 1,000 feet, and constant cross-section, can be obtained and this information used when deciding upon the cross-section and type of support required to pass a given quantity of air when reconditioning an airway.

The resistance of air-crossings, junctions, bends, and any contracted point can be measured separately, and the effect of improvement to the airway estimated with a high degree of accuracy.

The improvement due to the reconditioning of an airway may be easily measured.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Boyfield, L. R.      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print