Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

10th August 1940, Page: 37, Column: 1

Steam Boiler Troubles

South African Investigations

In subsequent discussion of the paper read before the South African Institution of Engineers by Messrs. F. J. Redman and H. A. J. McDonic on "Some Problems in the Operation and Maintenance of Steam Boiler Plant,"* Mr. W. O. Andrews made some remarks on the external corrosion of air-heaters and economisers. Extracts from his contribution are appended.

By W. O. Andrews.

Investigations have recently been made into the cause and possible remedies of the external corrosion of air-heaters and economisers with special reference to the plant installed at the Klip and Vereeniging Power Stations. Special attention has been paid to the dew point of the gases.

From theoretical considerations and from examinations of deposits found in the corroded areas it is highly probable that the trouble is initiated by dew deposited from the flue gases on the relatively cool metal surfaces. By contact with the sulphurous constituents of the gases the film of moisture is converted into sulphuric acid, which is the actual corrosive agent. As the products of corrosion are hygroscopic they remain moist even at temperatures appreciably above the original dew point. Under these conditions more sulphurous constituents are absorbed and more acid formed, and so the action continues.

Accepting this theory as correct, it is obviously important to avoid the initial deposition of moisture. The problem resolved itself into one of maintaining the inlet air or inlet water at a temperature above the dew point at all times.

Tests have been carried out in order to determine the temperature at which dew separates out from the flue gases. From samples of chimney gases abstracted from the boilers at Klip and Vereeniging under normal operating conditions of full load, it has been established that the dew point is about 40°C. Further tests have shown that during periods of steam soot-blowing the dew point is appreciably raised and may reach about 50°C. The dew point is also affected by the percentage of excess air used for combustion and increases with the CO2 content. The exact relation between these two variables has not yet been determined, but in the meantime it may be assumed to be a straight line law.

From these tests it was concluded that the temperature of the inlet air to the air-heaters under full load conditions should be maintained at about 50°C. in order to ensure that no moisture is deposited. Owing to localised increase in dew point caused by the use of steam soot-blowers, the blowers in the air-heaters should not be used. There is less objection to the use of blowers in the economisers.

A further investigation has been carried out to determine whether dew might be deposited during the special conditions obtaining when the boiler is started up. For this purpose a test was carried out at Vereeniging Power Station on a boiler, the air-heater of which had been partially renewed owing to corrosion.

The air-heaters of this boiler are fitted with air by-passes, the dampers of which were recently modified to make them more effective. No provision is made for recirculating the air, which is drawn from a warm position in the boiler house. The temperature averages about 40°C, but varies between 30 and 60°C. depending largely on atmospheric conditions. The economiser is not fitted with a gas by-pass.

The method of test was to compare the dew point of the flue gases with the temperatures of the air-heater and economiser from the time of starting up until the boiler was on full load. The dew point of the flue gases was calculated from the dew points of the outer air and of the flue gases at full load. A knowledge of these figures together with the CO2 content of the gases enabled the required figure to be obtained.

Before the fires were lit the outer surfaces of the air-heater and economiser were inspected to make sure they were dry. This precaution is very necessary, especially after the surfaces have been cleaned by hosing down with water. In this connection it should be pointed out that it is unwise to hasten the drying of the economiser by filling it with hot water. If this is done there is danger that the moisture driven off from the economiser may condense on the cool surfaces of the air-heater. A better method of drying is to run the fans for a short period.

In order to prevent moisture from the flue gases depositing on the economiser during the starting up period the cold water in the tubes was displaced by hot water from the feed range until the water outlet from the economiser registered about 50 to 60°C.

At this stage the fires were lit. The air-heater was by-passed on the air side and observations were made periodically of temperature, dew point, etc., until the boiler was steaming at full load, a total period of four hours. The initial dew point of the flue gas was 13°C. and gradually increased to about 40°C., when the boiler was on full load.

Owing to the fact that the economiser was filled with hot water beforehand, the lowest temperature of the water in the tubes was well above the dew point of the gases at all times, and the margin of safety was still further increased as the boiler went on load.

With regard to the air-heater, the conditions are reversed. That is to say, that there was a satisfactory margin between the air inlet temperature and the dew point when the flres were lit, but this margin was reduced to only 10°C. when the boiler was on full load.

In the winter months the inlet air temperature, which is not under control, may be reduced by 10 to 20°C. below the figures obtaining during the present test. Under these conditions the margin of safety may disappear, especially during soot-blowing when the dew point is temporarily raised by 5 to 10°C.

From the results of these starting up tests at Vereeniging it was concluded that there is little risk of corrosion due to deposition of moisture on the metal surfaces provided the following precautions are taken :—

(1) Examine economiser and air-heater to make sure that they are dry before lighting the fires.

(2) Fill economiser with hot water.

(3) To avoid raising the dew point too rapidly, take not less than 3½ to 4 hours from time of lighting fires to full load.

It was also concluded that when the boiler was on full load the conditions were not so satisfactory, as there is danger that dew might form on the air-heaters in the winter months. The only effective remedy would be to raise the temperature of the inlet air.

* See "The Science and Art of Mining," No. 14, Vol. 50, page 212.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Andrews, W. O.      
McDonic, H. A. J.      
Redman, F. J.      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print