At the present time longwall cutting machines are capable of
cutting at speeds up to 42" per minute and, with an undercut of
5" holed to a depth of 4' 6", approximately 540 lb. of kirvings are
produced per minute. Gummings are scattered far and wide,
hut the majority are entrained in the chain as it passes round
the driving sprocket, and they are carried back and deposited
in the cut. To prevent this, at least two men are necessary
behind the cutter, one man keeping the sprocket clean and setting
sprags, while the other sets roof supports and cleans out the
gummings from the cut — both these operations being very
strenuous. Most convergence at the face occurs as, or just after,
the cutter passes, so that working behind the cutter in front of
newly cut coal is dangerous, especially when visibility is poor
and respiration is more difficult due to air-borne dust. All these
factors are not in keeping with the high cutting speeds and
general efficiencies of modern coal-cutting machines, and to
remedy this extensive experiments have been made in order to
provide some automatic cut cleaning device.
Types of Gummer.
Most of the gumming gearheads which have been produced
due to these experiments are capable of being fitted to the standard
motor and feed sections of the various types of cutting machines,
and in general they fall into two classes (i) The spiral type such
as the M. and C. spiral gummer, and (ii) The paddle type, of which
the Austin Hoy gum loader is a good example.
The M. and C. spiral gummer consists of a neat and robust
spiral conveyor which is hinged so that the kirvings brought out
by the cutting side of the chain are conveniently deflected into
the spiral by means of a deflection plate. The gummer is operated
by gearing from the large wheel in the gearhead, a small pinion
wheel engaging with this bevel wheel and through bevel gearing
operating either of two dog clutches, this being the whole of the
permanent attachment to the cutter. The particular dog clutch
engaged depends on the direction of cutting. The actual gummer
is very quickly fitted to this permanent attachment, according
to the makers a time of two minutes being sufficient. By
tightening a single capstan headed nut a spring loaded dog clutch
on the gummer engages with the driving dog clutch already
mentioned and the spiral is operated through a chain of four
gear wheels. The cylinder, within which the spiral rotates, has
two large diametrically opposite apertures, one of which is blanked
off by a cover plate, the other being the hole through which the
deflection plate guides the gummings into the spiral. These are
reversed when the direction of cutting is reversed. When jibbing
in or flitting the gummer can be lifted up, but when cutting this
hinge movement is restrained by an adjustable tie bolt. The
complete gummer increases the overall length of the cutter by
about 12 inches, but with a 15" machine there is no increase in
overall height or width. The kirvings can either be discharged
to the side or to the rear of the cutter, and generally speaking
with very close timbering or when cutting in dirt it is advisable
to use end discharge, but the conveyor practice must also be
considered and side discharge gummers are applicable where the
face is cut before the conveyor is moved up.
The Austin Hoy gum loading gearhead is the first to combine
gum removal and conveying. There is a centrifugal disc gum-collector
which is a circular plate of high carbon steel, keyed to
the main shaft and revolving in a groove in the bottom plate at
the same speed and direction as the sprocket. Actually only
about 10 to 15 per cent. of the kirvings are not chain swept, about
80 to 90 per cent. of the kirvings being entrained in the chain
and swept out of the cut, where they are picked up on the disc
and immediately formed into a gum rim due to the centrifugal
action of the revolving plate. Since the goaf side of the disc is
completely covered in by a circular baffle-plate the kirvings are
carried round until picked up by the rubber-topped deflector or
plough, and forced into the radial vanes of the rotary shovel.
The elevator is driven through an overload slipping clutch
of from 2 to 4 H.P. by a train of epicyclic gearing from the main
shaft at a speed of thirty-six revolutions per minute and a
secondary drive of light bevel-gearing operates the detachable
and extensible conveyor.
As the kirvings are deflected from the gum-collector they are
picked up by the vanes of the rotary shovel where they are
elevated, and at the top, since the rotary shovel is inclined forward,
the kirvings drop vertically under gravity on to two apron-plates
which guide them to the belt conveyor.
The conveyor drive is through light bevel-gearing, but the final
transmission is through a dog clutch on a swivel joint, thus
enabling the conveyor to be swung from a position at right angles
to the machine to a position in line with it. The conveyor can
be made extensible, and it can he raised or lowered while delivering,
so that no difficulty is experienced in discharging dirt into the goaf
or coal kirvings on to the face conveyor or behind the machine.
The belt is 8 inches wide and the length is chosen to suit the
timbering system, the conveyor practice, and the nature of the
gummings. Longer conveyors feed better into the goaf or on
to the belt, but shorter conveyors are handier for swinging round
props. The inclination of the conveyor is maintained by an
iron chain fastened to the cutter by means of a soft iron hook,
which straightens out in the event of a fall on the cutter, or when
the timbering is too tight for the conveyor to swing round.
The machine has an overall length of 12' 4", and, while jibbing
in and cutting out, the elevator must be removed, giving a length
of 10' 4". The unit can be assembled in about fifteen minutes
in moderately good conditions and the elevator can be removed
in less than five minutes. The gum loading gearhand is designed
to handle up to 6 cwt. of coal or 12 cwt. of dirt gummings per
minute on a 2 H.P. drive, and under normal conditions can
remove up to 907 per cent. of the gummings.
Efficiency Factors.
In general the efficiency of a gummer depends on several
important points, of which perhaps the following are the most
important. The cutting speed must first be taken into consideration,
and in this respect better tests have been recorded
where the machine was cutting at speeds of 28 to 84 inches per
minute. When cutting at speeds of 36 inches per minute or
more the general impression is that the gummer is doing too much
and the efficiency of the machine drops accordingly. Sharp picks
will also entrain more gummings than blunt picks, and therefore
the efficiency of a gummer falls as the machine proceeds. It has
also been found that the influence of gradient and cleat on the
performance of a gummer is considerable. It is obvious that in
working to the rise the gummings will tend to flow out, but to the
dip the gummings will tend to be consolidated at the back of the
cut. In the latter case false breaks may become induced in the
coal, with the result that "breaker" coal becomes common
and this is detrimental to the efficient use of gummers. The
position of the holing is also important when considering the
efficiency of a gummer.
In overcutting or when holing more than 8" to 12" from the
floor of the seam, depending on the thickness of kerf, no gummer
is necessary since the chain cleans the cut effectively. When
cutting in the seam below this limit, or when undercutting in
the floor of the seam, gummers are again advantageous but their
efficiency will be impaired when dirt gummings are being handled.
It is a recognised fact that stone gummings do not flow so well
as coal, and there is a greater tendency to choke the gummer.
Advantages — Including Safety.
Both types of gummers have many advantages, and perhaps
the most important is the question of safety. In general it is
much easier to set sprags and rigid supports at the face immediately
the coal is cut, thus subsidence is minimised, roof control is better,
and there is less likelihood of falls of roof at the face. The
advantages of a clean face to the coal filler are also obvious. A
gumming gearhead is also a perfect pick guard and the cutting
chain is almost totally enclosed, so there is little danger of failing
on to the revolving picks. Admittedly pick changing is a slightly
longer operation, but the total enclosure of the chain does not
add to the frequency of the chain sticking since a momentary
reversal releases any obstruction in the holing. Respiration is
also much easier and visibility much better when gumming, due
to the quantity of dust in the atmosphere being less, and the dust
which is formed mainly breathes from the mouth of the cut,
The results of a kirvings test showed that without a
gummer 59.0 per cent. of the kirvings were +1/8 inch and 2.5 per
cent, were -200 B.S.S., while with the Austin Roy gummer
80.9 per cent. were + inch and 0.8 per cent. were -200 B.S.S.
Therefore, in general, with the pick sequence and cutting speed
unaltered, the use of a gummer will increase the size of the
kirvings, and the percentage of -200 B.S.S. kirvings which is
responsible for the air borne dust is considerably decreased.
Without a gummer it is impossible to prevent gummings being
carried back into the holing, and the resultant churning and
grinding puts considerably more wear and tear on the machine
than is necessary. Gummers immediately remedy this, with a
saving in power and longer life of cutting picks and machines.
The makers are able to mention cases where a 30 per cent. saving
in power has been effected, and personally I am able to quote
tests giving a 30 per cent. saving in picks.
Test Results.
Mechanical gumming prevents the gummings being packed at
the hack of the holing so that the effects of shot-firing are more
widespread, there is less shattering of the coal around the shot-hole,
and the coal splits more readily along its jointings to give
larger coals. In a test lasting 15 weeks the cost of explosives
per ton was reduced from 1.01d. per ton without mechanical
gumming to 0.96d. per ton with mechanical gumming, and the
output was increased from 9.35 to 11.75 tons per manshift. When
the gummings are tightly packed at the back of the holing the
coal is much more difficult to work, false roof breaks are formed,
and there is a greater danger due to falls of coal and roof at the
face; these are eliminated by using an efficient gummer.
Run-of-mine tests have shown that mechanical gumming
increases the size of the coals produced, and the average + 4"
over a test of seven weeks with hand gumming was 29.5 per cent.,
which increased to 37.9 per cent. on the introduction of mechanical
gumming. The percentage of top stone and band, however,
decreased from 2.9 to 1.9 per cent. over the same period, and
this supports the statement with respect to mechanical gumming
giving better roof support and fewer falls.
In thin seams mechanical gumming can be applied very
successfully, and in addition there will be a decrease in labour
costs due to the removal of at least one man per cutter, and in
wet conditions gummers have been tried and have given excellent
results.
Finally, although it does not affect the north-east so much as
other parts, there is the important question of the emission of
gas from the undercut. By using mechanical gummers a holing
of less width can be made and less gas will be given off from the
coal, but against this there is the fact that the smaller holing may
allow of less ventilation entering the undercut to dilute the gas
which is formed. Personally I am of the opinion that a smaller
holing kept clear of kirvings at the mouth by means of mechanical
gumming will admit more air to the undercut than a larger holing