Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

9th March 1940, Page: 276, Column: 1

Some Practical Problems In War Time

By George Mullin, M.I.M.E.

Extracts from paper submitted at the February general meeting of the North of England Institute of Mining and Mechanical Engineers.

It is essential in these difficult times that mining engineers should reason together and discuss the various problems with which they are faced. We are told by the Government that our outputs must be increased, as an ever-increasing export trade is one of the chief weapons in the economic war. It is obvious that to maintain outputs the pits must work regularly and no working days be lost that can be avoided. Unfortunately, many pits in Durham and Northumberland have been idle on occasional days due to irregular shipping.

Stocking Coal on Ground.

One way of overcoming this difficulty is by stocking coal on the ground and lifting it again when boats have to be rapidly loaded. The arrangements for putting down and lifting the coal will depend on the varying circumstances in each case, e.g., size of colliery, suitability of site, proximity to railway, etc.

The question of capital expenditure need not be a stumbling block, as it can be done with a comparatively small initial expenditure. As an example, take a colliery with an output of 1,200 tons per day. The colliery wagons are brought over existing landsale or workmen's coal hopper. The lorries run underneath the hopper, are filled, and then tipped on to the stocking ground. The lorries make their own heap until they get to the necessary height. In this way, we repeatedly put down 300 to 400 tons per day, thus saving 15 to 20 wagons per day when wagons are scarce. The coal is loaded again when the occasion demands.

Wherever possible, it is advisable to put treated coal on the ground instead of untreated coal, as it can be loaded and despatched without further expense or delay. At some collieries the coal is put on the ground straight from the tub as it comes from the pit. The disadvantage of this method is that when the coal is lifted again it has to be screened and prepared for the market at a time when screening and cleaning plants may be working at fall capacity.

If the coal is liable to spontaneous combustion and likely to be on the ground for a considerable period, it is advisable to take precautions. In these circumstances, especially if the coal is dry, temperature should be taken regularly and the height of the heap limited to ten feet.

If washed smalls are put on the ground, there is little danger of spontaneous combustion. This, of course, depends entirely on the nature and characteristics of the coal being stocked. We have had washed smalls on the ground with heaps 15 to 20 feet high for considerable periods, and had no sign of heating.

The Labour Problem.

We read and hear a lot about the number of unemployed miners. The plain truth is that large numbers of these men are, for various reasons, unemployable as coal hewers, fillers, or stonemen. At our own collieries, we have lost over 100 men since the outbreak of hostilities, and despite a really genuine effort on the part of the management we have been unable to replace the labour we have lost. The Local Exchanges were thoroughly combed out, 200 men interviewed and 10 employed. It would be interesting to hear the experiences of others on this question. It is only fair to state that more men could have been employed had houses been available. This question of supply of houses where work is available ought to be considered seriously by the Local Authorities and, failing them, by the Government.

Absenteeism is a serious problem and a difficult one to solve, but it is one which has considerable effect on the output.

Obviously there must be no relenting in our safety measures; everything humanly possible should be done to reduce the number of accidents. No war-time economy is worth the slightest consideration if it is to be gained at the expense of safety. Many shifts are lost through men suffering from colds, and the use of pithead baths has, in some cases, reduced the percentage of absenteeism. It is obvious that anything which improves the general health of the workmen will help to reduce absenteeism.

Intensive Mechanised Mining.

If outputs have to be increased then more intensive mechanised mining will have to be applied. It is many years since conveyors were first introduced. These have been considerably improved and are now generally accepted, yet after all these years we are still loading coal on to these conveyors by hand, except in isolated instances. It is a matter for regret that a suitable loading machine is not already an accepted auxiliary with coal-cutters and conveyors. The loading machine should be applicable to thin seams, without exposing too much unsupported roof. We have, it is true, such machines as the "Joy Loader," but this cannot be applied in thin seams. There is one machine already in use, but its range of application is limited — it cannot be applied to seams of two feet and under. This is a combined coal-cutter and loader. The first cost is high and its application limited.

A loading machine which appears to have possibilities consists of a short endless belt conveyor, driven by means of a suitable motor. The end entering the coal has a small drum and the driving drum is a little larger. Suitable reduction is adopted to give the desired speed of the conveyor which is only a few inches high up to the top strand of the belt which carries the coal. A suitable belt tensioning gear is fitted to the lower strand of the belt. The loader is geared to haul itself along with a capstan-like bollard for flitting purposes. It is further geared to haul itself into the broken down coal at about one yard per minute by means of a flexible steel rope on a fleeting drum. The rope for this purpose is fixed to both the entering and the driving ends of the loader, and anchored to two props placed in suitable positions but running in a snatch block at each prop, one snatch block being provided with a tensioning device for the rope. The entering end of the loader has an inclined or wedge-shaped plate for easy hauling into the edge of the end of the coal, and has revolving arms to carry the coal on to the belt.

The coal is taken off the belt by means of a scraping plate which delivers it on to a vibrating chute. The chute delivers the coal on to the face conveyor alongside the face. The props supporting the roof are not interfered with, as the scraper and chute are both slideable to such an extent that with the travel of the loader it is more than the pitch of the spaced props. The chute is designed to fold up or retract, so that it can be pushed past each prop as required. The vibrating chute is worked by means of an eccentric shaft and slides along it, and is further supported on a suitable frame. This chute can deliver to different heights of face conveyers as desired. The loader delivers to either a right or a left hand conveyor. It can be made, if desired, to work from either end of the face, but this means having two vibrating chutes and haulages, one set of each being out of gear. The scraper would also require to be changed. The working model is made single-acting and is suitable for working only from one end. This type would have to be flitted each day to the correct end. An advantage in using this loader is that it does away with peak loads on the face and gate conveyors, as the feed remains constant.

I have seen a working model of this loader and, with one or two modifications, it appears to be a practical proposition for seams down to two feet in thickness.

Substitutes for Timber.

We have heard a great deal recently of the scarcity of timber and substitutes for same. The best substitutes are steel props, as they can be universally applied and, with a proper system of withdrawing and checking, need not be more expensive than timber, except in very thin seams. Either girder or tubular sections are suitable. The tubular has the advantage of being lighter and snore easily withdrawn ; the girder section is, however, more easily repaired.

Concrete props are being used at present, but I cannot think of any place where steel props could not be used with much more efficiency, if steel is available. In very thin seams the cost of recovery of steel props makes the cost of steel supports compare unfavourably with ordinary timber props.

Larger quantities of home grown timber will now have to be used much of it may be unsuitable for props, but can be used as hard wood chocks. In bord and pillar working we may have to use chocks in place of props. This may be a decided advantage both as regards safety and economy, provided an efficient system of withdrawal and checking is organised and maintained. Chock wood can also be used for props in thin seams, and provided care is taken in their recovery they can be used over and over again. Having a bigger bearing surface, they are not readily broken.

Common bricks can be used for props in thin seams, two bricks laid side by side making 9 inches square, 14 bricks are required to make 21-inch prop, and 16 bricks for one 2 feet long. Thin wooden wedges are used to tighten up the pillar. If suitable stones are available, small stone butts could be built instead of brick butts. These would be much cheaper.

It is now common practice for men to be employed solely on recovery of timber and materials. The timber from thicker seams, even when broken, is being cut and used in thinner seams. This is good practice and should be part of our usual routine even in times of peace.

All scrap steel should be used at collieries wherever possible. Old arch girders can be cut up and used as steel props. Old flat bottomed rails can be cut up and used as substitutes for sleepers in main wagon ways. Recently, in one of our new drifts, old rails were used as sleepers and the track concreted, making a first class job. Grooves were cut in the old rails to suit the gauge of the wagon way, the rails placed in the grooves, keyed up with wedges and then the whole concreted in.

Tub Lubrication.

There are many directions in which small economies can be effected in all business concerns. No details should be too small for attention.

An example whereby tub lubrication was made much more efficient at considerably less cost was the installation of tub oilers in place of the old greasers. The principle of the oiler is to enable the oil to flow direct from the container to the tub axles. The container is placed on a slightly higher level than the rails, causing the oil to flow by gravity through a pipe to the oiler. The action of the oiler is as follows: Depression of the oiling bars closes the valve leading to the container, and opens the valve to which is attached the pipe leading to the atmosphere and in which the oil has siphoned to the same height as that in the container. This causes the oil to flow from that pipe on to the oiling bars. When the weight on the oiling bars is removed, the valve connected to the oiling bars is closed and the valve to the container is opened, thus the oil returns to the same level in the pipe as in the container. This obviates waste of oil should tubs be left standing on the oiler. The advantages experienced since oilers were introduced are as follows :—

(1) Cost of tub lubrication reduced by 40 per cent.

(2) A reduction in the units of electricity consumed on main and auxiliary haulages.

(3) Tubs easier to handle because of better lubrication.

(4) No mess as is usual round ordinary greasers.

(5) No danger of oil being mixed with water, there being no oil wells or grease boxes below rail level.

Maintenance costs are small the parts which require renewing are the springs, which cost very little.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Mullin, George      Whos Who Page


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print