|
16th December 1939, Page: 178, Column: 1 Falls In Broken WorkingsReferences to work by the North of England Committee are given in the 17th annual report of the Safety in Mines Research Board (H.M. Stationery Office, 2s. net). The following notes by Messrs. A. Walker and W. C. Wilkinson relate to the causes of falls in bord and pillar broken workings :— (a) The effects of workings in adjacent seams. — Observations have been made in a 7-foot seam at a depth of 490 feet of the effects of former workings in a 3-foot seam 150 feet below. Bords and walls in the upper seam are being driven towards an area where pillars have been left in the lower seam. In the upper workings an arc-wall coal-cutter is in use, and it is therefore not possible to form an accurate estimate of differences in the working of the coal as the area overlying the pillars in the lower seam is approached, but in this region the coal is more difficult to work. When the whole workings reach the area overlying the pillars, extraction by broken lifts is commenced. The output of the hand hewers is, at first, about two tons per shift and increases to about seven tons per shift when above the lower seam goaf at about 100 yards from the old goaf line. (b) The effect of increasing the width of broken workings. — A consideration of the behaviour of strata in whole workings has indicated that a "pressure arch" is developed above each narrow working and that any increase in width of the working, resulting from the drivage of loose-end lifts, must increase the dimensions of this "pressure arch" and the magnitude of the abutment pressures. It has not been possible to study this development in broken workings, but comparable conditions were obtained in a 31-foot seam at a depth of 500 feet, where longwall faces were driven from the boundary of an area of whole workings. The roof was of shale and above the whole workings it contained no cleavage planes. In the longwall gateway there was no visible cleavage in the roof until the face had advanced about 50 yards from the edge of the pillars. At this distance cleavage planes were developed at intervals of about 2 inches. At about 95 yards from the edge of the pillars induced cleavage was fully developed, the cleavage planes being from to ¼ inch apart. These observations indicate that the abutment pressure ahead of the face increases with the width of the working. An auto-recorder set near the face in a recess in the gateway pack showed that roof and floor convergence occurred at a gradually reducing rate until the face had advanced a further 97 yards, thereafter the rate increased while the face was driven another 6 yards. The rate of convergence was very low with further face advance and was practically zero when the face had advanced 160 yards. These observations suggest that in this instance there is an abutment pressure at about 95 yards behind the face. The roof conditions in the roads showed marked deterioration at about this distance. (c) Effects due to pre-formed breakers. — A common feature in broken workings where the roofs consist of shale is the existence of roof fractures above the coal near the sides of bords and walls. These fractures, known as "holing breakers," have the appearance of small faults in the roof and frequently extend through the seam and into the floor. They are parallel with the sides of the pillars and are exposed by the first "lift" which is driven. Observations have shown that similar "breakers" continue to be formed above the pillars as each lift is driven and result in each lift being driven under a roof which is already fractured. Extensive observations have been made of the nature of these breakers, relative to the prevailing natural and working conditions. Alterations of the methods of support in the lifts have been carried out in an attempt to prevent the formation of these breakers. Longwall workings. — While making the observations described in (b) above, advantage was taken of an opportunity to experiment with double packs at the sides of the Main Gate. The seam was 3½ feet thick at a depth of 500 feet and the immediate roof consisted of shale about 12 feet thick. Soft wood chocks, 3 feet square, filled with shale were set in a continuous row at each side of the gate; beyond these was a gap 5 yards wide and then a well-built pack 5 yards in width. The floor, consisting of clay band 3 feet thick and bottom coal 2½ feet thick, was taken up in the gate and the clay band was thrown up against the chock, no attempt being made to build it into a pack; this filled about half of the space between the chocks and packs on both sides of the gate. The gate was 9 feet wide and the roof was supported by 12-foot H-section girders 5 inches by 4 inches set upon the chocks at intervals or about 2½ feet apart. Previous to this experiment stone packs 5 yards in width were built close to the chocks. The roof girders were bent badly and height reduction was as much as 4 feet; the floor lifted extensively, and inward movement of the sides reduced the width of the gate to 5 feet. A length of 250 yards of the gate has been supported by the experimental chocks and packs. Conditions have been greatly improved; there is now some 20 inches of height reduction with practically no bending of the girders, no lifting of the floor, and no width reduction. In several places, however, side stone to a thickness of 12 to 18 inches fell into the gate and undermined the chocks so that end props have had to be set under the girders. This spalling of the sides may be due to the comparatively narrow chock at the gate side, and in future experiments packs of rather greater width will be used in place of the checks.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||