Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

8th April 1939, Page: 310, Column: 2

Fife Company's New Colliery

Before the Scottish branch of the Institute of Petroleum Dr. William Reid, B.Sc., gave a lecture on the new Comrie Colliery of the Fife Coal Company near Dollar. The estimated reserves of the coalfield, said Mr. Reid, justified the sinking of two large shafts. Every effort had been made to develop a new technique in mining engineering. It was decided to raise coal to the surface by means of skips or boxes containing 10½ tons each instead of the usual cage system. This system, said Mr. Reid, was new to this country and had many advantages. The quantity of air ultimately necessary was found to be 260,000 cubic feet per minute or nearly 600 tons per hour at a water-gauge of 4½ inches. The fan is a forcing one of the latest propeller type.

The large coal-handling plant is designed for 250 tons per hour of coal over 6-inch cube, and the washer, of the Baum type with a closed circuit, is capable of washing over 400 tons per hour of less than 6-inch cube size. A hi-cable aerial ropeway takes the debris from the preparation plant to waste ground some 1,000 yards distant. The sidings attached to the colliery will hold 8,000 tons of clean coal — that is two days' output.

Underground the pit bottom and main haulage levels are to be equipped for large mine cars holding 3½ tons each with Diesel locomotive haulage, and these will have intake air straight from the shaft. The coal will be conveyed from the face to main loading stations by belt conveyors, and thence by mine cars over an automatic weighing machine to a tippler in the pit bottom, where it will be delivered into the skip by means of a chute.

The winder will raise it to the surface, and it will flow on to the preparation plant conveyors, thence via the picking tables or the washer to the wagon, ready for disposal.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Reid, William, Dr.      Whos Who Page



Links to Collieries/Mines mentioned in this article

 

Comrie Colliery  Comrie Colliery


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print