Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

14th January 1939, Page: 218, Column: 1

Choice Of Underground Machinery. — IV.

By John J. Pringle, M.I.M.E.

From paper before the annual general meeting of the Associates and Students' Section of the North of England Institute of Mining and Mechanical Engineers.

Coal-cutting.

Coal-cutters require either electricity or compressed air as a motive power. From an efficiency point of view air is inferior to electricity. There are three types of machines (a) Disc, (b) Bar, (c) Chain. Disc machines reached their maximum number in 1913, but since, bar and chain machines have come more into use.

Bar and chain machines can work at various angles of cut, and for face work are more compact and lighter than disc machines. They are designed for high speed cutting. Arcwall machines are heavier owing to their being used for deeper cutting and being on a semi-permanent track.

The limited dimensions of coal-cutters demand a design of motor of a special class as no ordinary motor could undertake so severe a duty.

The mechanical gears are generally of first grade steel, all machine cot of ample strength to withstand the loads and all encased in oil. No others should be chosen.

The layout and protective gear is much a matter of initial cost. Thousands of tons of coal have been won by machines installed by the cheaper layouts that come within H.O. regulations, although several fatal accidents have occurred by their use ; it can be said that these were probably in greater number due to abuse of the gear than to its defects. The doubling of fuses, using defective trailing cables and plugs in order to speed up output instead of sending them out for repairs, are factors that have been responsible for many accidents.

For good service it is advisable to standardise with B.S.S. plugs throughout with good cab-tyre cable restricted in length to 100 yards face. In selecting a machine choose one with the lowest guaranteed maintenance and running cost, of equal output and suitable for the seam. See that the chosen protective gear is ample to comply with regulations, that it is foolproof, and that it has good maintenance by skilled labour. If you can afford the more desirable expensive gears your choice will be narrowed, but be certain that an undue price is not asked for it by introducing unnecessary gadgets that may become a nuisance.

Avoid choosing cheap cables without guarantees of copper and insulation sections and quality; be sure the conductivity is ample for the work and for any future extensions. Do not choose the more expensive gears until you have thoroughly examined the medium-priced ones, and do not assume that the best machine and gear is always made by the larger manufacturers, although you must be sure of efficient service after plant is set to work.

In choosing compressed air machines it is better to have them reciprocating if economy in air is desired, as expansion can be made use of. The turbine machine will probably be lighter and smaller. For these types practically no protective gear is necessary, it only being required to see that water drainage is employed.

Conveyors.

Jigger, band, and scraper face conveyers along with mothergate band and gate-end loaders have come into use. The conditions of the seam will generally determine the type to choose. Jigger conveyers may be selected for seams in which the gradient is helpful to their use ; scraper conveyors for seams that are undulating, and band conveyors for moderately undulating and level seams are the usual practice. Skip conveyors are also used, being suitable for any contour of seam and cheaply moved forward.

In choosing band conveyers it is better to have all the driving unit enclosed, and to make sure that the tension arrangement is satisfactory as well as suitable protection for the under belt. Rollers with their bearings should be adequately protected, and preferably with self-oiling bearings and of suitable size and design.

Then special consideration must be given to the rubber belts which are usually the most expensive repair in this class of machine. These should have the correct amount of flexibility to enable them -to wrap round the end pulleys and be of sufficient width to carry the required amount of material. In addition the weight of material on the belt and the pull exerted at the driving pulley to drive the conveyor should be considered, and the belt should be of sufficient strength to withstand these loads.

Rubber and canvas belts are made up of a number of piles of cotton duct cemented together by an elastic rubber compound. The strength is confined to the cotton duct, and this should be of the most economical combination of weight and strength possible.

Canvas belts are used for conveyers and elevators, and these have heavier duct than rubber and canvas belts, being more closely woven, usually being 32 ozs. per square yard as against 28 ozs. for 36" x 42" for rubber belt. These belts are quite unsuitable for wet conditions or where great heat is prevalent, and are made on the warp and filler principle.

Carrying Capacity. — When the quantity to be conveyed is small and the pieces large, the maximum size of the latter determines the width of belt and the speed should be no faster than that which is necessary to carry the desired load comfortably. When the quantity is great and the pieces small the capacity determines the width of belt. A conveyor running at a slow speed may be loaded more deeply than one at high speed, and when a narrow belt is run much above the advisable speed the load thins out and the capacity does not increase with the speed.

No definite capacity can be fixed for belts, and each case should be considered on its merits having regard to the class and nature of the material handled, speed of belt and feeding and discharge devices.

In operating belt conveyers in series, especially if any of the sections are elevating, there should be a gradual stepping up of the speed (unless made wide) from the initial receiving conveyor to the ultimate distributing conveyor. This will prevent breakage and a general rule is an increase of 15 feet per minute over the preceding one with a maximum speed within table limits of 150 to 250 feet per minute for coal.

Frequent starting and stopping is destructive of the belt, and with a series of conveyers interlocking of the starter gear with push-button control is used.

The horse-power to drive the belt conveyors, ns compared with the other forms of conveyers, is considerably less, due to the separation of the material from the moving parts, thereby reducing friction losses to a minimum. In checking out the horse-power of a selected unit it is advisable to take the average results from three or four formulae.

So far as gears are concerned it is better to have good machine-cut gears of ample proportion, all enclosed, and the position of the drive should be at the head end.

There are several methods of tension devices employed, first the automatic gravity type and (2) the weighted take up, and (3) the screw take up; all are suitable so long as they produce in the belts the effective tension calculated. Where (3) is used 1 per cent. of the total length of the belt should be allowed to take up travel, but for long conveyors this is limited to 4' 6".

There is much to be said for the design of discharge shoots, but these generally should be so curved as to prevent breakage of mineral and prevent damage to the belt.

For cleaning the belt, brushes rotating in the opposite direction to the belt are best, and the speed of these should be sufficient to throw out the fine material from the bristles. Their usual diameter is about 8 inches.

Conclusion.

It is quite common to be accused of paying too much attention to detail, but you may add that the whole is sure to suffer if detail is at fault. Every trained engineer knows too well that attention to detail is the only means of securing satisfactory final results, and the most prosperous undertakings are generally controlled by masters of this elusive factor. We can never face frankly, fully and realistically the problems obtaining unless we see them in their true perspective, and unless we understand them in relation to the past which produced them, and to the future which will be conditioned by them. In the choice of underground machinery past experience plays a large part along with present conditions, and it is in this spirit that the attempt has been made to set down a few observations in the practical selection of mining plant, knowing full well that more observations are sure to present themselves to those called upon to deal with this interesting and important subject. It can only be hoped that the hints set down may be of some use to those bewildered by the large amount of material from which they may have to make suitable choice.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Pringle, John J.      



Related Articles

Pub.
Date
Article (Newspaper)
03 Dec 1938  Choice Of Underground Machinery — I (The Science and Art of Mining)
17 Dec 1938  Choice Of Underground Machinery — II (The Science and Art of Mining)
31 Dec 1938  Choice Of Underground Machinery — III (The Science and Art of Mining)
14 Jan 1939  Choice Of Underground Machinery. — IV. (The Science and Art of Mining)

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print