Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

10th September 1938, Page: 73, Column: 2

Australia's Mechanised Colliery

System of Loading

The first Australian coal mine to be completely mechanised was the Wallarah Colliery, situated at Catherine Hill Bay, New South Wales, under the management of Mr. William Hudson. The change-over took place in June last year, and all coal is now undercut by machines — arcwall and shortwall respectively. After being shot down the coal is handled by Mayor and Coulson underground Joy loaders, which are of the crawler type.

The coal seam is 6 feet 6 inches thick, worked in 10-yard bords specially to allow two sets of lines with ample room in the centre of the roads for convenient travelling in and out of the coal-cutters and Joy loaders. In practice, the cutting machines undercut the coal on the bottom for a depth of 6 feet to 7 feet. This operation is followed by drilling the shot-holes with electric drilling machines; the holes are then loaded with the required amount of explosive and fired by the shot-firer.

The system of loading has been planned, as pointed out in the CHEMICAL ENGINEERING AND MINING REVIEW, so as to need little modification for production up to 1,300 tons of coal per day. The loader enters the bord along the centre of the road and operates at the centre of the coal face. A good supply of empty skips is drawn along and stationed on one side of the road, the loader meanwhile filling skips on the opposite side. As each skip is filed it is immediately replaced by an empty skip run from the opposite side of the road on rails by the aid of steel turntables. When the loader is operating, the two gathering-arms, working alternately, sweep the coal on to a conveyor which carries and delivers it into a skip. Each gathering-arm is driven by independent gears on either side of the foot sprocket of the conveyor chain, strain being prevented by the slipping clutch of the conveyor, which has a universally jointed centre-drive chain running over both front and rear, thus allowing slewing of the rear conveyor as required to suit the position of the skip. The chain is driven through a multiple disc clutch which protects the mechanism from severe overload. The rear conveyor can be swung through 45 degrees relative to the centre line of the conveyor head and ramp, and can be raised or lowered to suit different heights. The operation of the loader is simplified by the convenient grouping of all levers at one point.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Hudson, William    Colliery Manager  


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print