Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

9th April 1938, Page: 316, Column: 1

Water Troubles

At the March meeting of the Associates and Students' Section of the North of England Institute of Mining and Mechanical Engineers Mr. W. S. Hutton, Assoc.I.M.E., read a paper on "Water Troubles," in which he said he had no doubt that all mining men at some time or other had been troubled and had anxious moments with water underground. He expressed the view that, as the years go by, the necessity to take precautions against waterlogged areas will increase, as the scattered, partially worked, portions of various seams become necessary to prolong the lives of the pits. Those blank sections (abounding in all colliery plans), which have been left for no apparent reason, those beautifully shaped pillars which have not been "brought back," these are the mining man's lot in the future. It will be his problem to tackle them, and Mr. Hutton thinks be can safely say that fifty per cent. of these plague spots on the colliery plans will give "water trouble" ; however, there is one consolation. If the interruption in the normal development took place within the last forty or fifty years, then anxiety might be reasonably halved, inasmuch as the old goaf line or position of the unbroken pillars will be fairly accurately laid down on the plans. Knowing where the trouble lies is half the battle.

Mr. Hutton then proceeded to present the story of an attempt on one of these "plague spots." The symptoms mentioned, he said, were all there; a fairly extensive white portion of plan, embroidered with intricate scallops of unworked pillars. The approximate date of abandonment was 1815. The "white portion" was roughly 500 yards diameter. The "embroidery" extended half-way around to a depth of ten 20-yard square pillars. The nearest approach lay within 400 yards of the coal-drawing shaft and within 100 yards of an existing rolleyway (engine plane). The seam was 11 feet thick. The temptation was great, and they were led into it and the evil was delivered unto them there was an added inducement also. The old plan stated that operations in this particular area had been stopped because of the excessive inclination of the seam. They had worked the seam immediately underneath this area and invariably adopted self-acting inclines, the gradient being approximately 9 inches to the yard. They pictured the difficulties the old miners must have had working to the dip with such an inclination. They were inclined to think that the excessive gradient had been the sole reason for ceasing work in this area. They drove two drifts from the lower seam to the upper (the area to be worked). The vertical distance intervening was 42 feet and the strata penetrated was mostly massive sandstone. The fore drift was driven 1 in 6 and the back drift 1 in 3.

The method of work was bord and pillar, the seam being cut in the middle with a percussive-heading-machine. This method proved very successful. The cost to the shaft was one which every colliery manager strives for and seldom attains.

The west side places began to "bleed," and Mr. Hutton explained that as they reached tire boring line they were stopped. Then it was decided to advance the back-winning to the boring line and commence boring. The aim was to tap the old workings at practically the highest point possible, in order to maintain a better control over any water, which they now fully expected to get when we holed. The boring was done by means of "Burnside" boring gear adapted for use with compressed air. The work of boring and advancing of the heading proceeded into the fourth week, by which time the back-winning had advanced 32 yards into the barrier. Then there were further water troubles, and the idea of piping the water to the shaft standage was abandoned. The shaft pumps would only deal with 600 gallons per minute and there were 300 gallons per minute coming to the shaft from other parts of the pit. It was decided to seal up each drift with a brick dam, the fore drift to be sealed first. Mr. Hutton gave details of the building of the dams, each dam having a total of 15 feet depth from convex facing to outer facing. Both dams were duly completed.

Small feeders of water were forcing their way through fissures in the roof and sides adjoining both dams. These were ultimately stopped by drilling a series of holes in the sides and top over the of the dams, into which cement was injected by means of a cement gun. The mixture used for grouting was 50 per cent. cement and 50 per cent. sand. The maximum amount of water in the feeder amounted to 600 gallons per minute.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Hutton, W. S.      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print