|
29th January 1938, Page: 232, Column: 2 Airtight StoppingsReferring to the wide use of sand in the Doncaster coalfield in connection with work dealing with spontaneous heating, in a paper on "A Simple Method of Making Stoppings and Roadways more Airtight," before the Midland Institute of Mining Engineers, Professor F. Stuart Atkinson, M.Eng., said it was an essential part of most stoppings, being often used as a blanket to damp off incipient heatings or actual fires. Sand, however, has disadvantages when used underground on gob-fire work. It is not impervious to the passage of air or of water. Moist sand often cracks when drying and air passes along the cracks. Sand is a poor conductor of heat and therefore prevents the ready dissipation of heat, and dissipation of heat is one of the reasons why fires do not break out in most seams of coal. Sand also occupies less space on drying, and on this account walls of sand are usually not built more than about 9 inches thick. All stoppings erected against fire should be suitably reinforced, sufficiently strong, and should be as airtight as possible. Showing a stopping during erection Professor Atkinson remarked that the top of each length of stopping is completed with sand so that the whole periphery of the roadway is lined with sand. It is also freely used inside the stopping itself to allow the material, usually small stone, to bed itself in easily. At intervals, vertical walls of sand, called "sand dams," are built across the stoppings to increase airtightness, care being taken to join up the sand dam to the other barriers of sand without any intervening pieces of stone. Near the sand dams the sides and roof of the roadway are very carefully dressed to remove all loose material, and the roadway is trenched across to a hard floor. To increase the airtightness of a stopping the Professor explained that it has been found an advantage to place in one or more of the sand dams vertical sheets of steel, as large as may be practicable, slightly overlapping each other and sufficient to fill, as far as possible, the whole section of the roadway. Where the steel sheeting is in the last sand dam of a stopping, it is usual to leave the top of the dam accessible and visible, so that any shrinkage of sand can be dealt with by adding more sand and re-ramming. It is not with the intention of strengthening the stopping that the steel sheets are incorporated — this is done previously by adequate rail or girder reinforcement — but only to make the stopping more airtight. Actually, the sheets do add somewhat to the strength, which is an advantage. Eventually, the stopping would be completed by building a brick or concrete wall at the end out-bye from the heating.
|
|||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||