Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

26th November 1937, Page: 1023, Column: 2

Notes from the Coalfields

Scotland

[Local Correspondence.]

Thirty men are being employed at a new surface mine which has been opened by the Fife Coal Co., Ltd., on the south side, of Benarty, Kelty, and close to the side of the old Benarty Colliery, which was one of the earliest pits operated in the Kelty coal field. The seam of coal in the new mine is 8 ft. thick and is expected to provide work for a considerable number of years.

The change-over from the old to the new screening plant and pithead at the Fife Coal Co.'s No. 7 Colliery was accomplished last week-end. The work commenced on the afternoon of Friday last week and was accomplished by 11 a.m. on Sunday. The new plant has been built by Dickson and Mann, Ltd., Bathgate, and incorporates several new ideas. It is a totally enclosed building of steel with brick infilling, and reinforced concrete floors. In the tumbler house, where the coal is tipped on to the picking tables, special care has been taken to prevent coal breakage. There are three main picking tables, with two auxiliaries for cleaning cobbles size. Space has been provided for mess-room for the pithead staff. The plant will handle the extra output to be brought from the Kirkford area in the immediate future. The change-over was successfully made under the supervision of Mr. John Miller, manager, and Mr. David P. Campbell, chief engineer. Within two weeks the old structure, the last to be modernised by the Fife Coal Co., will have completely disappeared.

Following an interview which Mr. Arthur Woodburn, president of the National Council of Labour Colleges, and Mr. J. P. M. Millar, the general secretary, had with the executive of the West Lothian Mineworkers' Union, the union has decided to have an N.C.L.C. educational scheme. The scheme will entitle any member of the union to attend free the classes and non-residential day and week-end schools arranged by the National Council of Labour Colleges, and to have free postal courses on some 17 subjects ranging from chairmanship to economics. In view of the fact that the miners work on shifts, the postal courses are expected to be of particular advantage. The Mid and East Lothian Miners' Union has had an educational scheme with the N.C.L.C since the latter's formation. Recently the Fife Miners' Union adopted a similar scheme. Negotiations are in progress with the Lanarkshire Mineworkers' Union.

The first meeting of the Fife Mining Students' Association for the new session, was held in the Fife Mining School, on Wednesday evening, November 10. The paper by Mr. J. Calder, on "Colliery Power Generation," was a repetition of that given before East Scotland Association at Edinburgh, as already reported in Colliery Guardian. The meeting was well attended, and the paper evoked considerable interest. In the ensuing discussion, Mr. Calder answered many questions, and the meeting was closed on the call of the chairman by a hearty vote of thanks.

At a meeting of the East of Scotland Mining Students' Association held in Heriot-Watt College, Edinburgh last Saturday, a paper entitled "The Driving of Dooks under Wastes containing Water," was read by Mr. George C. Hutchison, Lochgelly. After outlining the existing circumstances the lecturer proceeded to describe in detail the operation of driving the dooks, the difficulties encountered, and the safety precautions taken. There were three developing dooks driven to the full dip at an inclination of 1 in 3 and had reached a distance of 250 fm. before trouble was experienced. The diamond drill was used to bore the holes through the intervening strata at an inclination of 1 in 4 in advance of the dooks. To cope with the extra water and prevent flooding larger pumps had to be installed and the sorely pressed pumps already at work had to be kept going. Some ingenious arrangements were devised to assist the latter during the transitory period. The working of a coal cutter and conveyor on the dook face was described as a no mean achievement.

A general meeting of the West of Scotland Mining Students' Association will be held in the Royal Technical College. Glasgow, on Friday, December 3, 1937, at 7 p.m., when Mr. R. Crawford, H.M. electrical inspector of mines will read a paper entitled "The Importance of Earthing."

In spite of a letter from the Mines Department pointing out that the question of burning bings is outside their province. Lanark County Council is to endeavour to obtain support of other local authorities for joint approach to the Mines Department on the question of dealing with pit debris.

Operations were commenced on Monday by William Dixon, Ltd.. on a new mine which, situated in the only part of the Carfin coal field above water, will work the Ell coal seam. None of the collieries or mines in the Carfin district is working at present, and all had to close down through the same fault — the inflow of water due to the closing down of the pits in the surrounding districts. Coal had been worked previously in some parts of the new mine, but the work had been carried out from Carfin Colliery. This work had been stopped, however, owing to the inflow of water two years past in July. Since that time Carfin Colliery has been closed.

The Lord Provost of Glasgow, Sir John Stewart, made reference to the increased price of coal when he spoke on Monday night at the annual dinner in Glasgow of the Scottish centre of the Institution of Electrical Engineers. Sir John said the increasing price of coal was a most disturbing factor in the production of electricity. In 1931 the corporation could buy coal at 10s. 3d. per ton, whereas in 1937 they were paying 17s. 6d. per ton. There was something radically wrong there. Why the price should have risen so much in such a short time was difficult to analyse. He reminded them, as members of an electrical engineers' institution, that unless they got comparatively cheap coal the price of electricity must be increased. It would be a matter for discussion in their institution as to whether they could exercise some control over the rapacity of the people who at the present time owned the coal supplies.

In a judgment issued at Hamilton, on Tuesday, Sheriff Brown has allowed a proof in the action at the instance of the Executive Board of the Scottish District (Coal Mines) Scheme. 1930, against Walter Spiers, coal master, Johnston Hall, Edinburgh-road, Motherwell. Pursuers sued for the sum of £1, alleging that the defender had exceeded the coal output allocated to him by the board by eight tons, and was therefore liable for a penalty of 2s. 6d. per ton on the excess.

An interesting lecture was given by Mr. Slee at the meeting of the West of Scotland branch of the Association of Mining Electrical Engineers, held in the Technical College, Glasgow, on November 14. Mr. Slee dealt with lubricants used in the engineering industry, and he gave some very instructive hints as regards practical tests on oils for different engineering purposes. There was a very good attendance and a lengthy discussion followed.

A survey of housing needs in Wemyss coal field towns reveals an acute shortage. At Buckhaven and Methil applicants awaiting houses number 1,349, over 400 of whom, with their families, live in sub-let rooms, disused shops, and caravans. There are 200 houses being built at Buckhaven and 80 at Wemyss. Large-scale mining developments in the Wemyss coal field have attracted large numbers to the district with no adequate housing provision to meet the needs. It is stated that the famine in houses arises chiefly from delays by the Fife County Council, accentuated by the fact that Fife coal concerns have ceased to build houses for workers as formerly.

A point has arisen in connection with the approval by the Miners' Welfare Fund Central Council of the proposal to erect pithead baths at Gateside Colliery, Cambuslang. About 30 women are employed at the colliery and at the adjoining brickworks, which also belongs to the colliery company. These women took part in the ballot which decided to proceed with the baths scheme. The constitution, under which the national fund is controlled, makes no allowance for the erection of baths for women workers, and the scheme which has now been approved is for men workers only. Mr. John Paterson, president of the Gateside branch of the Lanarkshire Mineworkers' Union, stated in an interview that the girls who work on the pitbank and in the brickworks will not benefit by the Gateside scheme, although they have agreed, by ballot, to assist in the maintenance of the baths. "I am hopeful, however," declared Mr. Paterson, "that something will be done for them. I have put forward their case, and the central council has agreed to give it special consideration." The baths at Gateside, which are estimated to cost £8,000. are expected to be in use by 1939. A baths scheme has also been approved at Blantyreferme Colliery, Newton, at an estimated cost of nearly £11,000.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Brown, —    Sheriff  
Calder, J.      
Campbell, David P.    Chief Engineer  
Crawford, R.    H.M. Electrical Inspector of Mines  
Hutchison, George C.      
Millar, J. P. M.    General Secretary  
Miller, John    Colliery Manager  
Paterson, John    President  
Slee, —    Electrical Engineer  
Spiers, Walter    Coal Master  
Stewart, John, Sir    Lord Provost  
Woodburn, Arthur    President  


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print