Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

10th April 1937, Page: 314, Column: 1

Perminal Treatment Of Haulage Road

At the March meeting of the Manchester Geological and Mining Society, Mr. Herbert Price, B.Sc., submitted a "Report on Treatment of a Section of Main Haulage Road and Intake with Perminal 'W' and Calcium Chloride." The following notes are culled from the paper :—

The section treated is the main haulage road to the pit. Commencing at the end of the pit level, 60 yards distant from the downcast shaft, the treatment was applied over a length of 350 yards. The main haulage road is also the main intake airway, the quantity of air passing being 102,500 cubic feet per minute, at an average velocity of 930 feet per minute.

The roadway is approximately 730 yards deep from the surface, it not being of an even gradient. The nature of the strata is good, but the warrant has a tendency to creep, in one portion of its length evidence of a 2 feet rise of the floor in the roadway being apparent. This creep is not of recent date, but experience has shown that if the surface of the floor is broken a gradual creep again occurs. The roadway is of an average width of 14 feet by 10 feet in height, the greater part of its length being supported by arch girders.

The screens are near to the downcast shaft, and when the wind is serving in a certain direction the quantity of coal dust carried down the shaft is considerable. The coal dust coupled with that consequent to the shunting and decking operations at the pit bottom gives rise to conditions necessitating stringent precautionary measures, and limestone dust is applied liberally. The road is kept well stone-dusted, and as can be expected a very large proportion of the dust comes to rest on the floor.

Prior to the treatment the floor was very dusty, and the high velocity of the ventilating air created an unpleasant dust cloud, particularly during the working shift, or when men were travelling at the change of shifts.

The roadway is illuminated by electricity, bulkhead fittings being spaced at 15-yard intervals. The air-borne dust settled on the projections of the prismatic glasses, reducing much of the light, which state of affairs was persistent despite frequent cleaning.

The humidity of the air in the section has a bearing on the quantity of calcium chloride which should be applied to each 100 square feet of area, subsequent to the treatment with Perminal "W," the higher the percentage humidity the less calcium chloride being required.

Having discussed the arrangements made for the treatment Mr. Price presented the following general observations :—

1. Perminal is a wetting agent which, by overcoming the water repellent property, is absorbed by substances normally difficult to wet, coal dust being in this category.

2. For substances easily wetted, such as limestone dust, Perminal is not essential.

3. Under certain circumstances on haulage roads, coal dust may be the greater in bulk, but usually inert dust is preponderant.

4. Of precautionary measures against two risks, explosion, or dusty atmosphere, the greater risk must receive first consideration, and the adequate dilution of coal dust by efficient stone-dusting must be maintained.

5. The chemical treatment of roadways is ostensibly to allay dust, and to give conditions preventive of loose dust remaining in a free state.

6. The ultimate combination of the free dust into the floor of the roadway does not dispose of the primary need of stone-dusting.

7. The large quantity of dust left untreated on the sides of the roadway has remained in a free and loose state, not being affected by the chemical treatment of the centre portion of the road.

8. On adequately stone-dusted roads, the following can be stated: (a) Isolated sections treated with water only, satisfactory but only of limited permanence. Does not have any effect on dust deposited subsequent to initial setting. (b) Perminal and calcium chloride — satisfactory. Of more prolonged permanence, and does not take up a proportion of the subsequently deposited dust. (c) Calcium chloride only — satisfactory, and apparently equal to the Perminal and calcium chloride treatment.

9. The use of too much water on haulage roads is not desirable owing to the inconvenience caused, which, in some instances, may introduce danger to the haulage hands, unaccustomed as they are to the altered set of conditions.

10. It is not considered necessary that the road need be made sloppy to get intimate mixture of either the Perminal "W" or calcium chloride, but that water should be looked upon as a carrier, only sufficient being used to damp the dust, and carry the required chemical into it.

11. The improved condition of the sections treated, when compared with untreated roadways, is sufficient proof that the treatment is worth while, providing of course that the permanency is commensurate with the cost.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Price, Herbert      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print