Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

10th April 1937, Page: 313, Column: 1

Reorganisation Of Chamber Colliery

In the paper on "The Reorganisation of Chamber Colliery" that he read before the Lancashire branch of the National Association of Colliery Managers, Mr. Eric Potts said the Chamber Colliery Co. was formed in 1877 by members of the well-known Oldham family of Lees, whose forbears had in the family name mined coal in the Oldham district continuously for over 200 years previously.

The operations of the Chamber Colliery Co. are now concentrated in that part of the field remote from the outcrops, where the average depth is about 900 yards. The number of years during which coal has been mined in the district is evident in the copy of an indenture made between Messrs. John and James Lees, of Oldham, and James Watt and Mathias Boulton, of Staffordshire, to construct and erect a pumping engine at one of their pits in Oldham in the year 1799. It is interesting to note that the depth of the shaft was 130 yards and the price of the pumping engine £820. The shaft, which we are told was near Oldham, is believed to have been in the Werneth district. There is also kept in the colliery office in a good state of preservation a diary of the daily movements of the mine manager from 1708 to 1711.

The Chamber Colliery Co. at present owns three separate and independent pits, namely, the Oak pit, situated at Hollinwood, within the borough of Oldham, Woodpark pit, sunk on the main Oldham to Ashton road, in the village of Bardsley, and Ashton Moss pit, Audenshaw, five miles from Manchester.

The power plant existing in September, 1935, was out of date, and the mechanical condition of the various engines, except the winder, was such that replacement was extremely urgent.

It is part of the scheme of reorganisation, so far as underground developments are concerned, to inter-connect all three pits in the Roger mine in order to improve and facilitate the ventilation. This will also serve to concentrate the production.

It is intended to take current underground right into the coal face when the main roadways are repaired and in a suitable condition to accommodate the high tension cable. With the 0.06 square inch cable now installed it is expected that adequate provision has been made for future electrical underground extensions. At present the electrical power does not go beyond the pit bottom where it terminates in two haulage motors, one 160 h.p. motor driving the Roger main haulage and one 35 h.p. motor driving the Old mine haulage.

It was decided in November, 1935, to abandon the generation of electricity at the Oak and Woodpark pits and to buy current from the Oldham and Ashton Corporations. Arrangements were quickly completed and on the 1st February, 1936, an order was placed for all the electrical plant required to change over from D.C. to A.C.

Mr. Potts described the work of reorganisation which was accomplished in a little over twelve months. Nothing elaborate or revolutionary was contemplated and such plant as has been put down is the simplest and most suitable for its particular purpose. The reorganisation concerns power supply and the preparation of coal only, and in effect three months after completion the following comparative figures have been obtained:

The surface cost has been reduced by 6d. per ton; the power cost reduced by 8d. per ton, and colliery consumption of coal decreased from 17 per cent. to 3 per cent. The selling price of the fuel has been considerably increased on account of the recovery of all coal, through the crusher and washer, which previously went to the firehole. The oil consumption has been reduced by 600 gallons per month at the two pits. As the figures given are in period of winter trade conditions and an output of 3,500 tons per week, the relative advantage will be increased in short time working on a low output.

Concentration and systematic mechanisation of underground workings is contemplated at present, and this will also receive due consideration of the limiting features imposed by working seams 6 feet thick at 1 in 2 inclination at 900 yards depth.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Boulton, Mathias      
Lees, James    Mine Owner  
Lees, John    Mine Owner  
Potts, Eric    Colliery Manager  
Watt, James      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print