|
27th March 1937, Page: 289, Column: 1 Notes On Managers' ExaminationsReport of Central ExaminersThe Central Examiners have issued their report on the examinations for certificates of competency as managers and under-managers of mines held in November, 1936. Their comments on the work of candidates are given below with the text of the questions, the comments for ease of reference being reproduced in italics. The official Question Papers, containing the plans and diagrams, are obtainable (2s. net) through H.M. Stationery Office. Winning and Working (1st Class). (1) Describe fully what circumstances would influence you in adopting the pillar-and-stall method of working in preference to longwall. Sketch a pillar-and-stall layout of a district to produce 300 tons in a shift, the seam being level and 5 feet thick, and at a depth of 500 yards. (50) The reasons given for adopting the pillar-and-stall method of working under conditions selected by the candidates were very good. This part of the answer was more explicit than the sketches, which on the whole were crude. This points to the fact that details in connection with this method are not well understood, and were not explained. (2) Explain in detail the procedure you would follow when changing a heavy winding rope in a shaft 800 yards deep. How often would you re-cap the rope, what length of rope would you cut off each time, and by what means would you cut it? (40) The majority of the candidates did not take into account the second rope. The method of changing was, however, well understood. (3) Place the following formations in their correct relative geological positions, commencing with the newer ones and proceeding to the older: Lower Limestone shale, Coal measures, Old red sandstone, Millstone grit, Magnesian limestone, New red sandstone, Upper limestone shale. (40) This question was fairly well answered. (4) It has been decided to enlarge a downcast shaft from 12 ft. diameter to 20 ft. diameter. The shaft is 450 yards deep and is fitted with rope guides. Explain in detail bow you would carry out this alteration without interfering with the main coal-winding shift, there being nothing extraordinary in the strata. (40) This question was not satisfactorily answered. Although the majority of the candidates would fix a cylinder inside the small diameter shaft for protection purposes, the details in regard to the work as it was progressing were not clearly stated. (5) In a safety-lamp pit, discuss the merits of the following method of bringing down the coal after under-cutting with a longwall machine: (a) Permitted unsheathed explosives; (b) Permitted sheathed explosives; (c) Cardox or Hydrox; (d) pneumatic picks. (40) This question was well answered. The use of sheathed explosives in preference to unsheathed was especially favoured. Pneumatic picks were also popular from a safety point of view. All methods to be described and their merits were understood. (6) Describe with the aid of sketches, all the safety arrangements you would adopt in a haulage system, including engine, engine-house, and an incline 500 yards long and dipping 1 in 3½, equipped with direct rope haulage and hauling from one intermediate level in addition to the bottom. (40) The sketches of the arrangements were satisfactory, and most. of the candidates covered the whole of the desirable arrangements. (7) It is being suggested that simultaneous shot-firing should be reintroduced for ripping shots and coal shots. Discuss fully the advantages and disadvantages of this method of shot-firing. (40) The advantages and disadvantages of simultaneous shot-firing were well discussed by a fairly large proportion of the candidates. Explosions, Etc. (1st Class). (1) An investigation is to be made in a mine after an explosion to ascertain the point of origin and the cause of the explosion. To what points would you direct your attention in collecting the necessary information, and what indications would there be in a roadway which had been traversed by flame? (30) The answers were not altogether satisfactory. Some candidates dealt with the exploration and rescue work immediately after an explosion, which was not intended. Candidates might with advantage read and study more of the published records. (2) Sketch and describe the construction of a room suitable for rescue workers who may engage in rescue work, or rescue training and practice at a mine, and for housing such apparatus and equipment as is required to be kept at the mine. (25) Some candidates gave a sketch and description of a Central Rescue Station which was not asked for. The answer required was a sketch and description of the room which must be provided at mines to comply with Part IV. of the General Regulations (Rescue) of 8th July, 1935. Some of the dimensions of the rooms given were inadequate, such as 10 ft. x 9 ft. and 10 feet square. (3) It is proposed to use concrete instead of brickwork in the construction of an underground dam to withstand a water pressure of 300 lb. per square inch. Illustrate and describe how such a dam should be constructed. The illustrations are to consist of a plan and a longitudinal section with appropriate dimensions marked thereon. (25) Some candidates gave a description but omitted illustrations which are specially asked for. Others omitted the dimensions many designs were bad, too weak for the pressure. The cementation of the structure and surrounding strata were generally referred to, but none of the candidates referred to the importance of securing the roadway in the front of dam permanently, which is a matter of great importance. A few candidates showed a large manhole through the dam, which is not necessary. A mistake previously commented upon was again noted, that is where the ground is got out for a wedge-shaped dam — the small end of the cone was erroneously shown towards the water or pressure side. (4) You are sent to make an inspection of, and report on, a colliery with regard to coal dust conditions, and to propose remedies. Coal-cutters and conveyors are extensively used. Describe generally the programme of your investigations, and the nature of your proposals. (25) Generally the answers were satisfactory, except that a few candidates after dealing with the means of reducing the amount of coal dust made in the ordinary working of the mine, neglected to say anything about the periodical removal of the coal dust and the application of stone dust. Some suggested watering the roadways, not appreciating the drawbacks to watering as a remedy in many cases, e.g., roads heavily timbered or supported in weak strata which are normally dry. (5) A seam of coal 9 feet thick and liable to spontaneous combustion, is being worked on the longwall system. The bottom 6 feet is worked, but the top 3 feet is only taken down in the rippings and recovered as far as possible from the wastes. There is 6 feet of black shale above the top coal. The return end of the face is advancing along the side of a barrier between two collieries. There has been trouble from heating at this end of the face. What precautions should be taken to prevent this trouble? Illustrate your answer with a suitable sketch. (25) A minority of the candidates attempted to answer this question. There were some good answers indicating the importance of removing all coal and carbonaceous matter from the return end of the face, putting in sold packing against the barrier and keeping the return airway of ample dimensions, but the importance of diverting the return from the barrier side from time to time was often overlooked. (6) A shaft, 18 feet diameter, is being sunk through strata inclined at 300, and at a depth of 200 yards is approaching an old goaf believed to be water-logged. What dangers would you apprehend, and what precautions would you take to carry the sinking safely through the old goaf? (25) The answers indicated that the dangers, both of weakened strata overlying the old goaf and of an inrush of water therefrom, were well understood. The suggested precautions were good and practical, but where sketches were given they were generally crude. Machinery (1st Class). (1) A vertical spindle centrifugal-suspended sinking pump has an electric motor of 150 b.h.p. at 2,000 volts 3-phase and is intended for a final depth of 750 feet. Describe the type of electric cable that you would use to convey power to the pump from the surface. Give the size or area of the conductors and describe the arrangements that you would make for handling the cable when shifting the pump and for securing the cable when the pump is working. (28) A good number of candidates would choose paper-insulated lead-sheathed cable for a suspended shaft sinking pump, which is not a suitable type. Many candidates arrived at the correct current, but few exhibited any close knowledge of the copper conductor area to adopt. Some candidates would secure the cable to fixed shaft buntons — not a practicable arrangement. (2) In what kind of electric power and in what kinds of plant does "power factor" play a part? What causes a low power factor? How may the power factor of an electrical system be improved? (28) Often well answered, but some candidates have not a good grasp of the subject. (3) Enumerate the materials that are used as insulators in electrical machines and in cables and transmission lines with a short statement of the particular purpose of each material. (28) This is a question on which all candidates did write something. A mistake sometimes made was to give lead as an insulator — this arises from its close association with paper in insulation work. (4) A centrifugal, or turbine, pump has a duty of 750 gallons per minute to a head from all causes equivalent to 500 feet of water. It is placed near the sump. State the maximum suction head that you would allow for, also the diameter of suction and delivery pipes that you would use. Also describe the joint that you would adopt for the delivery pipes and give a list of the valves in the pipe ranges external to the pump. (28) Most candidates correctly gave a maximum figure for the suction head of a centrifugal pump lower than would be given for a rain pump. The size of suction and delivery pipes was generally correctly calculated. Descriptions of the type of joint for the rising main pipes were often weak. Some candidates did not know the valves usually associated with a centrifugal pump. (5) What are the data and particulars that should be supplied to a maker to enable him to quote for a steam-driven winding engine? (28) This question was attempted by nearly all candidates. Generally the answers laid more stress on externals than on important details of the engine. (6) How would you arrange the gears of an endless rope haulage the electric motor of which develops 100 h.p. at 960 r.p.m. whilst the fleeting wheel turns at 12 r.p.m. ? State the types of gearing that you would use. (28) The mistake made most often was to reduce the speed from 960 to 12 r.p.m. in two reductions, involving high gearing ratios and consequently large diameter wheels. A majority of the answers gave a belt as the drive from the motor. Generally answers were satisfactory. (7) Write a short account of steel-wire winding ropes dealing with their construction for various duties, their handling and care in service and the troubles to which they are liable. (28) This question was a favourite. A common mistake was to confuse the Lang's and ordinary lays. Knowledge of wire ropes is well diffused up to a point. (8) Show by side and end elevations a set of keps and kep operating gear for a cage (say, for example, 3 feet 6 inches wide by 6 feet long), the gross weight being 4 tons. Give the leading dimensions. (38) This question was shunned by many candidates and the answers received were not satisfactory. Often the arrangement of levers for working the keps to and fro was impossible. [To be continued.]
|
|||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||