Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

2nd January 1937, Page: 202, Column: 1

Machine Mining In Northumberland And Durham

By A. C. Moonie

Extracts from paper presented at meeting on 12th December of the North of England institute of Mining and Mechanical Engineers. To illustrate the range of machine mining in the two counties details were submitted of seven examples in the Low Main, Five Quarter, Busty, Maudlin, Harvey and Beaumont Seams.

Machine mining in Northumberland and Durham has made tremendous strides in the past ten years, and the application of coal-cutters and conveyors in suitable conditions coupled with the use of steel supports' and better knowledge of roof control, have made possible results which were only dreamed of ten years ago. The amount of coal cut has been almost trebled in that period, and is now almost 24½ million tons, or 52½ per cent. of the total output. The amount of coal conveyed has also been enormously increased in that period, and is now over 11½ million tons, or 25.3 per cent. of the total output. Coal-cutters have increased in number from 632 to 1,414, and conveyers from 136 to 913. During the past ten years the mining industry has passed through a period of strain, worry, and continual anxiety, and while the struggle is by no means over, there is evidence in the swelling volume of world trade which gives hope that the worst is passed.

Coal-cutters.

To keep pace with better organisation and methods of working at the coal-face there was a need for improved coal-face machinery, and this has not been lacking. Praiseworthy attempts have been made to solve the problem of combined cutting and loading. In one case the arrangement is an adaptation of the ordinary long wall machine with a loader attached. In another case the machine is fitted with three jibs ; one jib under-cutting, another over-cutting, and the third jib slicing the whole seam off at the back of the cut. In the first case the coal is cut going one way and loaded by the conveyor coming the other way. In the second case the cutting and loading are done in one operation. They have met with moderate success, but difficulties have been encountered with roof control and the preparation of the coal for convenient handling.

The application of coal-cutters has not undergone any radical change. The average depth of cut on longwall faces has increased slightly, and is generally 4½-5 ft. There are odd cases of faces cut up to 6 ft., and at least one case where the cut is 8 ft. deep on a longwall face working in conjunction with conveyers. The average yardage cut per machine has increased, and it is not uncommon for machines to cut faces 160-200 yards long every day. The ordinary undercutting of seams is well understood, but it is becoming increasingly necessary to work seams with dirt-bands intersecting the coal, or seams with ramble between the seam and the roof. To get the largest percentage of clean coal it is a problem sometimes whether to cut in the band or immediately below or above it. Where the hand is friable it is generally best to cut it out and goaf the cuttings before filling commences. Where the band is hard and strong it is sometimes better to cut immediately above or below the coal. In the former case, the top coal would be cleaned off, the band next, and the bottom coal last. In the latter case, the process would be reversed. In some instances it is best to cut out a ramble on top of the coal so that the clearing away of. the dirt will be a separate operation from the coal filling. Overcutting longwall machines have been successfully applied cutting up to a height of 7 ft. from the floor.

The bord-and-pillar method of working with arcwallers or universal heading-machines is used to a greater extent in Northumberland and Durham than elsewhere, due largely to the amount of coal under property. The cutting of bord-and-pillar places with arcwallers was first attempted in this district about 15 years ago, and since then arcwallers have fulfilled a very useful function in the more efficient production of output from bord-and-pillar workings. Universal heading-machines which are arcwallers designed to give a vertical shear in addition to a horizontal cut, fill a small but useful place in machine mining. There are about 250 arcwallers and universal heading-machines in use in Northumberland and Durham.

Conveyors.

During the period under review much progress has been made in the design of belt-conveyers. This has been mainly in the direction of protection of the bottom belt, making provision to avoid spillage, and in the construction of the framework to facilitate dismantling and rebuilding each shift. In one type of conveyor the orthodox practice has been reversed, and the coal is conveyed on the bottom belt while the return belt is carried near the roof. In some cases the dimensions of the driving gear have been greatly reduced by incorporating the motor inside the width of the gear. head, thereby reducing congestion at the loading point. A good deal of attention has been given also to belt wrap and the arrangement of drums so as to reduce belt tension as much as possible.

With the improvement in design and the increased durability and strength of belting some remarkable results have been achieved with mothergate conveyers. Outputs of 300, 400, and 500 tons per shift from double-unit faces being handled at one loading station are not uncommon in Northumberland and Durham, and there is at least one case where 730 tons are loaded every day in two shifts from one trunk-belt conveyor. There is one ease of a trunk-belt conveyor working up to 1,250 yards long with one driving head, but it was found that 800 yards was the limit in order to ensure a reasonable life from the belting. In some cases where the crush on roadways is excessive it is found that 300-400 yards is the most suitable distance, and the lay-out is arranged in panels to suit this distance.

Shaker conveyers have done yeoman service for many years, but latterly they have been largely superseded by belts, especially in the North of England where the seams are undulating. Where the seams have a definite gradient there is still a large amount of work done with shaker-conveyers on the rise side of double units and also with conveyers in tandem and the mothergate at the bottom end of the face instead of in the middle. Where the gradient is small and regular they are sometimes used on both sides of a double-unit face laid out on the strike of the seam and delivering into a gate-end loader or mothergate belt-conveyor.

There have been no outstanding changes in the design of shaker-conveyers, but there have been changes in detail in the method of fastening the lengths of troughing together and in the support of the troughing. Ball frames, roller paths, and small wheels are in use for supporting the troughing.

The Blackett scraper-chain conveyor, which was the first conveyor used underground in this country, is still used to a certain extent and has given good service in the past. It has certain advantages over other types of conveyers in wet conditions.

The scraper-conveyor of the box type has been much in evidence in recent years, and has given some excellent service in thin seams. It is limited in capacity and is used mostly in seams under 2 ft. in thickness. It has advantages from the point of view of easy filling and ease in moving over.

Organisation of Conveyors.

The successful operation of machine mining required the most carefully thought-out organisation with skilled and constant supervision. The best results are obtained where there is an official in charge whose whole time is occupied in looking after a district of a limited size, such as a double-unit face.

The operations of cutting, shot-firing, filling, ripping, packing, timbering, and moving forward conveyers, are performed in a sequence of co-ordinated operations, the whole cycle being completed in 24 hours, and a constant output being obtained from a definite length of face. It is essential that the coal filling should be done in one shift to allow time to complete the other Operations necessary in the 24-hour cycle. The greatest danger is in attempting to fill a greater output than the system can handle comfortably in a shift. To allow for stoppages of various kinds it is wise to arrange an output that can be filled in less than the full time available at the face.

Where large outputs are being handled, continuity of operation is of the utmost importance, as the loss of one day's output is a serious matter, and the greatest care must be exercised to ensure that there are no serious stoppages. With the excellent face machinery of various types now available, mechanical breakdowns can be reduced to a minimum by systematic supervision. In normal conditions, adequate and rigidly systematic roof control will prevent falls of roof on the face. In the majority of cases, faces are carried forward for long periods without a hitch except where faults appear, and these cannot be foreseen. Much experience and skill in dealing with faults on conveyor faces have been acquired in recent years, and where these do not exceed the thickness of the seam they seldom cause any interruption or difficulty beyond the grading for the machinery, and the extra care of the roof required in the vicinity. Larger faults are a serious matter as they cause either sudden or gradual diminution of output from the face, and may necessitate the transference of the plant to another face as quickly as possible in order to restore output.

Roof Control.

The successful working of conveyor faces is impossible without an efficient system of roof control. So far, no accurate system of rules has been defined to say what system of roof control will give the best results in any particular set of conditions. This is largely a matter of experiment and observation, and would seem to indicate that in most seams any one of several arrangements would be equally successful. The most commonly used arrangements of roof control are: (1) Wood or steel props and straps; (2) Wood or steel supports with chocks; (3) Wood or steel supports with packs; (4) Wood or steel supports with chocks and packs.

In the case of wood props and straps these are generally used where the cutting is done in the floor or in a band in the seam, and where cuttings have to be cast back into the goaf. The efficient recovery of steel props and straps in such instances is extremely difficult and costly, and puts the use of them out of the question. If there is a soft floor in addition, their use is rendered impossible owing to the fact that they are sunk in the floor as well as half buried in the cuttings.

In the case of steel props and straps without the assistance of chocks or packs, successful results are obtained where the roof and floor are hard, and the roof breaks off behind the steel supports with every cut and where the weight is not excessive. The back line of props is generally strengthened with extra props and lids between the straps to stiffen the breaking-off line. This arrangement of roof control is often used where the roof is composed of bands of soft sandstone, which breaks off readily.

Chocks are often necessary, in addition to steel or wood props and straps, in order to strengthen support where the roof is heavy and of a bending nature and breaks only occasionally or after every two or three cuts. Chock-releasing devices have done much in recent years to facilitate the withdrawal of chocks, both from the point of view of safety and cost.

The use of packs is a necessary and widely used factor in roof control in conjunction with the use of steel or wooden supports, and they have in many cases improved the roof conditions after their introduction. The use of goaf packs is more general in seams from 2½ ft. upwards. The experience with packs would seem to indicate that while the timber provides a support for the roof immediately above the coal, the packs provide a support or cushion for the upper roof. To build packs it is necessary to use broken roof fallen in the goaf, and for this reason the packs must be near enough together to give the support necessary and still far enough apart to enable the roof to break down between the packs. The distance between the packs is a matter of experiment and is easily arrived at. In odd cases it may be necessary to fire shots in the roof between the packs to get the roof to commence breaking.

In the hardest and strongest of post roofs it may be necessary, in order to provide packs and achieve control, to carry dummy roads in the goaf. These are kept open only from the face end, and a top canch is drilled and fired every cut and the stone packed in the sides as in an ordinary gate-road. Only the loose stone is taken down from the sides for safety and no attempt is made to square back the sides. This may seem expensive, but there is no alternative in seams working longwall, as to leave such a roof without packs means that it will break only once a week or once a fortnight, and then it will break over the coal with serious results. A roof of this kind is usually a splendid roof in bord-and-pillar working, but it often means the loss of much coal in pillars when it takes a break.

The foregoing notes on roof control are by no means arbitrary, and there are many who will not agree with some of the conclusions stated, but they may be taken as nearly correct as it is possible to be, in general, dealing with a subject in which there are never two sets of conditions exactly alike.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Moonie, A. C.      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print