|
18th December 1936, Page: 1150, Column: 1 Coal Mines In South-West DurhamA Negative ReportAmongst the projects suggested in connection with the reclamation of the Special Areas was the drainage of derelict collieries in South-West Durham. In order to ascertain the facts, the South-West Durham Reconstruction and Development Board instructed Mr. ARTHUR M. HEDLEY, M.I.M.E., to undertake a mineral survey, and his report has now been published. Although Mr. Hedley conclusions are mainly negative and therefore disappointing since they indicate no prospect of reducing the number of unemployed persons in the district, his summary of the position, very comprehensive notwithstanding the difficulties of obtaining accurate information possesses no small interest to the geologist and student of social affairs. It is accompanied by lists of collieries, royalties, and pumping stations, and by a series of maps and plans. It is not known when coal was first worked in this area, but mining operations have been carried on in the Bishop Auckland neighbourhood for 230 years. The coal seams in the western part of the district are near the surface and have largely been worked by means of adits or shallow shafts, and water from the western pits flows naturally to the east creating a danger to the deeper pits. This has been accentuated by the closing down in recent years of important western pits for various reasons. The presence of large faults and dykes, interrupting the continuity of the seams, interferes with the normal flow of water and contributes to the need for the large number of pumping stations (some 20 of which are in operation). Owing to the situation of these main pumping stations, Mr. Hedley concludes that the idea of establishing one central pumping station for the district is quite impracticable; the work involved in driving roadways (many under flooded areas) to conduct the water from the various accumulations to one point, would occupy years, and the expenditure entailed would be prohibitive. Complete information is not available as to the coal resources, but it is estimated that about 350 million tons are still available to be worked, exclusive of flooded coal in abandoned colliery tracts- about 13 million tons. This, divided by the present annual output of six million tons, indicates that the district's resources may be exhausted within the next 30 or 60 years. Although production has not fallen off considerably in the last 10 years, employment has diminished, 19,666 persons being employed in 1934, but the individual production has increased substantially. The chief factors have been the closing of exhausted and uneconomic pits, developments in the eastern part of the district on modern lines, the progressive introduction of machine-mining, reconditioning following the war, and increased effort by the individual workers. Of the upper seams, the High Main, Upper Three Quarter and Maudlin are approaching exhaustion; coal in the Five Quarter, Main Coal, Beaumont, Low Three Quarter and Brockwell may provide 20 or 30 per cent. of the total output; and the remainder should be forthcoming from the Low Main, Hutton, Harvey and Busty seams. The nature of every seam varies considerably throughout the district, but it is probable that the supplies of coking coal constitute at any rate three-quarters of the total quantity of coal considered to be remaining unworked. At the present time the main pumping stations deal with quantities of water equivalent to a constant feeder of more than 17,000 gal. per min. against an average head of 614 ft. This is equal to nearly 40 million tons of coal per year, and it is mentioned that one firm alone pumps 11 tons of water for each ton of coal raised, The estimated total cost was £70,145 in 1935, representing 1.85d, per 1,000 gal, pumped or 3.06d. per ton of saleable coal. Mr. Hedley devotes considerable attention to the pumping problem and outlines a central scheme the practicability of which, however, he dismisses. Other solutions are examined, including a revision of existing pumping conditions in order to reduce expenditure, control the flow of water eastwards, and supervise future mining operations tending to endanger the safety of working pits. The investigator also deals, in succession, with the prospects of land reclamation, the prevention of inflow from surface streams, the utilisation of pit water for domestic purposes, and the utilisation of spoil heaps, as matters which might be considered by the Commissioner for the Special Areas, but, on the whole, he holds out very little hope of providing additional employment in the area through the measures examined in the survey.
|
|||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||