Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

3rd July 1936, Page: 38, Column: 1

Notes from the Coal Fields

Northumberland and Durham

[Local Correspondence.]

It is understood that the executive committee of the Durham District (Coal Mines) Scheme, 1930, are to hold an inquiry to discover who gave information to Sir Arnold Wilson, M.P. for Hitchin (Herts), regarding the central selling scheme to be introduced in Durham and which up to now has been kept a close secret. Considerable surprise was expressed in the North-East when Sir Arnold Wilson read extracts from what he declared was a copy of the selling scheme for Durham, in the House of Commons, and it is believed a Durham colliery owner, not satisfied with the scheme, gave away confidential information. A meeting of the executive board of the Durham District (Coal Mines) Scheme was held at Newcastle on Monday and it was stated afterwards no reference had been made to the leakage whereby confidential information came into the hands of Sir Arnold Wilson in the House of Commons. It was stated on Monday that the draft of Sir Arnold's scheme was an old one which had been scrapped by the board. None of the coal owners knew the details of the completed scheme and there was really no need to supply a reply to Sir Arnold Wilson.

Dorman, Long and Co., Ltd., of Middlesbrough, have just put into operation at their Cleveland steelworks the first battery of a new coke oven plant which, when the second battery is completed, will be the largest in this country and the second largest in Europe, and is of the latest design. This plant was designed and constructed by Simon-Carves, Ltd., of Cheadle Heath, Stockport. There will be two batteries each of 68 coke ovens of the underjet compound Otto twin flue regenerative type, designed for heating by coke oven or blastfurnace gas from adjacent Cleveland blast furnaces. When the second battery also comes into operation later in the year the ovens will use 20,000 tons of coal to produce 13,000 tons of coke per week. The installation includes coal crushing and blending equipment, together with complete by-products plant, also coke screening and mechanical distribution to deliver coke by conveyor direct to the bins at the blast furnaces. Provision is also made for a coke loading dock for distribution of coke by rail and for the conveyance of coke oven gas by pipe-line to the company's steelworks and mills. The new by-products plant is designed on the semi-direct system for the recovery of ammonia as sulphate, and the recovery of benzol and tar, and also includes electrostatic de-tarring equipment. When in full operation the plant. will produce approximately 200 tons of sulphate of ammonia, 800 tons of crude tar, and 70,000 gal. of crude benzol per week. Further refinements of the crude tar and benzol will he effected, along with similar products from the company's other coke ovens, at the company's large central distillation works at Port Clarence where xylol, toluol, motor benzol, pitch, carbolic naphthalene, cresylic acid, creosote, bituminous paints, disinfectants, anthracene oils, sheep dip, insecticides, etc., are produced. The concentration of coke output at this installation will effect considerable economies not only in the cost of manufacture of coke, but by the utilisation of a great volume of surplus coke oven gas in conjunction with blastfurnace gas at the steel plant and rolling mill furnaces. When the new ovens are at full output they will take the place of some of the company's older type ovens, and the Clarence battery will he closed down in due course. The coal used in these coke ovens will be drawn from the company's collieries in Co. Durham. The coal, after being discharged from the railway wagons, is conveyed mechanically to any one of 12 concrete bunkers, each holding 200 tons. From these hunkers the coals may he discharged at any desired speed for mixing purposes so that the various classes of coal may be blended in the required proportion as may he determined. The blended coal then passes through the crushers. From the crushers the coal is discharged on to a rubber belt about 4 ft. wide, and on this belt it is carried to the top of the service bunker, which is 150 ft. high. This bunker acts as a storage reservoir for the blended coal, is constructed of reinforced concrete, and will contain 4,500 tons of coal. Underneath the hunker accommodation is provided for workshops and messrooms for the workmen, together with the main electrical control gear for the whole plant. From this hunker the coal is discharged into electrically driven cars mounted on rails, and from which the coal is charged into the top of the ovens. The ovens are constructed of special bricks, and are each 42 ft. long, 14 ft. high and 18 in. wide, and contain a charge of 17 tons of coal. Upon discharge from the ovens the hot coke is carried by an electrically driven coke car to a central quenching station which is part of the service hunker structure. The coke is then discharged on to a further system of belts, is screened and finally carried by distributing belts directly to the bins at the blast furnaces. Thus there is no handling of either the coal or coke on the whole plant, save by mechanical means. The gases are led from the ovens in mains and are first cooled and then passed into vessels, where they are subjected to a high voltage electrical discharge which removes the tar. Other plant extracts the benzol and the ammonia, which latter is converted into sulphate of ammonia. After extraction of the by-products the gases are then released for use throughout the steelworks and mills for melting steel and heating furnaces and other purposes. Gas will also he conveyed to the company's works at Redcar, three miles away, where it is used for similar purposes.

The River Wear Commissioners have held their annual survey of the river. Those present included Mr. J. E. Dawson (chairman), Ald. Frank Nicholson (vice-chairman), and Sir Walter Raine and other members of the commission.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Dawson, J. E.    Chairman  
Nicholson, Frank, Ald.    Vice-Chairman  
Raine, Walter, Sir      
Wilson, Arnold, Sir    M.P.  


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print