Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

9th November 1935, Page: 137, Column: 1

Apparent Case For Steam Pumping

By Geoffrey W. Bell, B.Sc., Stud.I.M.E.

Summary of paper read on 26th October before the Associates and Students' Section of the North of England Institute of Mining and Mechanical Engineers. Schedules showing items were exhibited with the paper as given.

The subject of this contribution is the consideration of an actual problem encountered at a colliery, but it is necessary to state that the case depended upon certain conditions remaining constant, such as the water feeder and the low grade fuel supply which was otherwise valueless. As subsequent events proved the conditions did vary substantially, and a survey under otber conditions would probably lead to a vastly different conclusion. The fact to be faced was an increase in the water feeder, in the near future, of 2,000 gallons per minute against a total head of 360 feet. Electrically driven centrifugal pumps had been installed several years previously and were capable of dealing with the feeders of that period. It was therefore necessary either to install additional pumps or to replace the existing ones with larger capacity units.

As the water standage was limited pumping operations would be continuous when the additional feeder was encountered. Since electrical energy was purchased from the Supply Company, and steam was generated at the colliery for all surface plant, the installation of a steam turbine driven centrifugal pump seemed worthy of consideration. Alternatively an electrically driven pump could be installed.

In the case of an electric unit capital expenditure was necessary on pump, motors, switchgear and cable. The cost of the pump may be neglected as it is common to both units. Efficiencies of 80 and 90 per cent. should be obtained for the pump and motor respectively and, taking the cost of energy at one-half-penny per unit, the annual charge will be £4,126. An itemised annual account shows the total annual cost of the unit as being £4,682 10s.

A scheme for the installation of a steam turbine driven pump would entail a greater capital expenditure as additions and alterations would be necessary to the existing steam plant. The boiler plant consisted of six Lancashire boilers hand-fired with low grade fuel having a calorific value of 9,790 B.Th.U. per lb. and an ash content of 26.8 per cent. The feed water was preheated to a certain extent by exhaust steam from No. 1 winder. The steam requirements of the various plants under normal conditions when the boiler plant was working to full capacity were :—

A test was run on one boiler to ascertain the thermal efficiency of the boiler plant and it was found to be 44.1 per cent. It was considered that the efficiency could be raised to at least 65 per cent, by the use of a Galloway supermiser.

The steam requirements of a turbine suitable for the pumping unit were then considered. As the boiler plant was only capable of a maximum steam pressure of 80 lb. per square inch the first set of conditions applied, i.e., at 70 lb. per square inch the turbine required 171 lb. dry saturated steam per B.H.P. hour and be capable of developing up to 287 B.H.P. The water from the pump would be delivered through the condenser in order to obtain the necessary vacuum of 28 inches.

In order to obtain the necessary supply of steam it was proposed to fit a Galloway supermiser to the six Lancashire boilers and a super-heater of suitable size to counteract the losses of the steam range, regrind No. 1 winder cylinders and fit new pistons to improve the steam consumption, replace the screen endless hauler and two steam engines with electric motors. There would also be a considerable saving by dispensing with a long steam range from the boilers to the screens. It was estimated that normally about 9,800 lb. of steam per hour would be available from which the turbine could be supplied.

The capital expenditure necessary to carry out the scheme was estimated at £7,215.

The fuel, consisting of coal-cutter kirvings and coarse coal, was valued at 4s. per ton and the annual charge for fuel was calculated to be £858. The total annual cost of pumping by steam power was estimated to be £3,410 19s. showing a saving in favour of the steam plant of £1,271 11s. per annum, or 27 per cent.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Bell, Geoffrey W.      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print