|
21st July 1934, Page: 1, Column: 1 Props — Lids — BarsResearch Committee's PamphletWorking in collaboration with the Safety in Mines Research Board, Pamphlet No. 1 on Safety in Longwall Working has been issued by the Safety in Mines Research Committee of the North Staffordshire Institute of Mining Engineers. The chairman of the Committee is Mr. A. Marshall and the investigator is Mr. E. H. Vallis. The pamphlet, with six illustrations accompanying the text, has been prepared for colliery officials and workmen, the information being recommended as conducive to safety and economy. It deals with the use of props, lids and bars (straps) for roof support at longwall faces. Excerpts are appended. The roof under which any work of getting coal or filling tubs is carried on must be systematically and adequately supported, and props must be set at such regular intervals, or less, and in such manner as shall be specified by the manager in a notice posted at the mine. Where the setting of supports is delayed, much time is spent by the workmen under roof inadequately supported, and many accidents can be attributed to this cause. Especially where the roof appears to be strong, workmen are tempted to delay the setting of supports, and delay in this direction largely accounts for the number of serious accidents which occur under such roofs. Temporary props must be used until the regular supports can be set; and it is important that these should be set as securely as the regular supports and at the earliest possible moment. On no account should the use of temporary props be made the excuse for delay in setting the regular supports. The best method of stripping or working off machine-cut coal will depend on circumstances, but the method adopted should be such as will allow of the early setting of temporary props. These temporary props should be replaced by the regular supports as soon as possible. The Object of Props, Lids and Bars. The purpose of these supports is not only to prevent pieces of roof from falling, but also to assist in the control of roof movements and to ensure a minimum of damage to the roof in the area where persons have to work or pass. To attain this end all props must be set firmly, correctly and as soon as possible. They will, when properly set, help to prevent the lower roof beds sagging away from stronger upper beds. The sagging of one bed from another is a source of danger because the local pressure on the lower beds or the sudden falling of the upper beds at any time may cause falls at the face. Lids, besides adding to the stability of props, afford support over a large area of roof. They are crushed as the load comes on and so servo to prevent the props penetrating the roof or floor. Props are more easily withdrawn from under lids than when set directly to the roof. Bars still further increase the area of roof supported and prevent pieces of roof falling from between props. They also reduce the movements of props to a minimum. Props. — As the roof and floor approach each other the props tend to penetrate the roof and floor unless prevented by lids or bars. Penetration of the roof is particularly harmful because the prop, instead of supporting the roof, breaks it up and makes it weaker. Penetration of the floor is not desirable, but it is better that the props should enter the floor than that they should be broken or penetrate the roof. The area of a prop foot should, as far as possible, suit the nature of the floor. Where the floor is soft a prop with a large foot area should be used so that it will not sink into the floor too readily and so provide insufficient support to the roof. Sometimes it is necessary to use foot lids or floor bars. Where the floor is hard it may be advisable to use a prop with a pointed foot so as to prevent breaking or buckling. Lids. — Suitable wood lids, with flat surfaces, should always be used between a prop and the roof and between a prop and a steel bar. When set directly to the roof the lid should be at least as wide as the prop head and its length not more than three times its width; and it should be set so as to cross the roof breaks. When set between a prop and a bar it should be as wide as the prop head and preferably a little longer. Bars. — The more extensive use of suitable bars at working faces is advocated because of the increased safety which they provide. They should always be used where the roof is weak and friable. Bars should not overhang the props more than an inch or so at the waste side, because the roof breaking down in the waste may bend or break the overhanging part and tend to displace the props. On machine-cut faces where the bars are let into the face it is essential that the face end of each bar should be supported by a prop immediately the machine has passed, as the movements of the strata are most rapid during the cutting period. Where a bar does not fit closely to the roof it is very important that gaps should be packed tightly with wood wedges, especially above the props. Movements of Props. — It is often observed that props swing a little when taking weight, and they sometimes become displaced if not correctly set. Sometimes the props are set with heads inclined towards the face because the roof appears to move towards the waste. The direction in which the props will swing can be determined by means of a plumb line from time to time, and by setting the props with due regard to it they can be made more effective and less liable to be damaged or dislodged. In inclined seams the props are frequently underset, but tests have shown that the movements of the roof and floor often tend to dislodge an underset prop, and it is suggested that as a general rule the props should be set normal, i.e., square with the roof and floor. In highly inclined seams it is generally necessary to fit the foot of the prop into a stamp-hole in the floor. Points to Remember. The Pamphlet concludes by emphasising the following points to remember when setting face supports :— Support the roof; delay is dangerous. Set temporary props as soon as possible. Set the regular supports as soon as space permits. Set all supports, both temporary and regular, firmly and well. Set the waste side prop under the end of the bar. Fill up gaps between a bar and the roof with wood wedges. Use good lids between props and the roof and between props and steel bars. Set the props square with the roof and floor.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||