|
12th May 1934, Page: 341, Column: 1 Unusual Boring ProblemsFrom paper read, 21st April, before the North of England Institute of Mining and Mechanical Engineers. In the south-eastern area of the Durham Coalfield the working of the upper seams has always been attended with serious risk, by reason of the close proximity of the overlying magnesian limestone and yellow sands. Along the Northumberland coast, where the seams are not at such a depth as in Durham, a minimum thickness of cover between the seam and the sea-bed is fixed before total extraction is allowed. In the south-east Durham area the question of cover becomes much more complicated by reason of the large depth of heavily-watered magnesian limestone extending some hundreds of feet below sea-level. It has been suggested, and fully supported by evidence, that the sea-bed in this area should be taken as being at the base of the magnesian limestone, or, as it is more commonly termed, the sand feeder. Acting on this principle, the upper seam in this area was laid out on the bord-and-pillar system with pillars 44 yds. square. When a point was reached where it was known (by means of a bore from the surface) that the thickness of the intervening strata was apparently between 200 and 150 feet, the question arose of reducing the size of pillars for the purpose of increasing the amount of coal got, as the pillars were not to be extracted unless some satisfactory method of complete stowing was adopted. Various methods of stowing were investigated, such as band, scraper, and pneumatic, but as none of these could reduce subsidence below 15 or 20 per cent. it was not considered advisable to attempt complete extraction. After considerable negotiations, the following permission was given: "To reduce the size of the pillars down to 33 yards square subject to the pillars being formed in a regular manner, and to no workings being carried nearer than 100 feet vertically to the overlying magnesian sand." This condition necessitated proving the thickness of cover at various intervals and in several districts, and the object of this paper is to describe the method adopted of boring the holes and of ultimately sealing off the heavy feeders tapped. The first two boles were bored by the colliery staff, using a Burnside boring tube and an ordinary cutting chisel. The first of these holes was bored 130 feet by hand methods, and, having served its purpose, was stopped and plugged off with wooden plugs and clay. The second hole tapped the sand feeder at 111 feet, at a pressure of 350lb. per square inch, and was coupled up to the delivery range of a nearby pump and allowed to run off for a period. When boring this hole, a small fissure containing a little water was passed through 16 feet above the seam, and it was afterwards found that this parting extended over a wide area of coal-pillars. In 1931 it became necessary to bore additional holes in several districts where it was expected the workings were approaching the defined limit. On that occasion it was decided to bore by the diamond-drill method with a view to obtaining a core of the strata, which might decide when the sand was being approached, without actually tapping the feeders. The cores obtained, however, did not assist in this way, as the feeder was tapped on each occasion practically without warning. Six holes were bored, and each was commenced with a finished diameter of 4 inches, and reduced in successive stages to a final diameter of 2 inches. The total length of each hole varied between 124 and 212 feet, and on each occasion a pressure varying from 310 to 360 lb. per square inch was registered. It is interesting to note that although such a large pressure was indicated, the quantity of water released was remarkably small, suggesting that the overlying strata and sand-bed were fairly compact, and that the water cavities were comparatively small. This, of course, was indicated on the pressure-gauge in most instances, as it generally took 3 or 4 minutes before full pressure was reached. After boring the first hole the contractors attempted to plug it off with a combination of wooden wedges — in one or two instances iron wedges were used in conjunction with the wooden wedges. Alter ten days' work in fixing 58 feet of wedging into the hole, a pressure of 345 lb. per square inch was still registered on the pressure-gauge. A Burnside plug, 3 inches diameter, was inserted at a distance of 67 feet into the hole. On the following day the distance from the plug to the bottom of the hole was entirely plugged with cement and clay, made into cartridges as follows :— A 12-inch brown paper sheath was formed by folding the paper round a prepared piece of wood of the necessary diameter. This was filled with cement, and then 2 or 3 inches of clay was placed on the bottom, and the whole pushed up against the plug by screwing a fiat piece of iron on to the end of the boring rods. The clay was lightly tamped, and held the cement cartridge in position until the next one in turn was rammed up. When the hole was entirely closed by this method, a brass blank flange was screwed on to the bottom of the brass tube which had been fixed and cemented into the bottom of the hole. As previously mentioned, the first plug was placed at a distance of 67 feet into the hole and was 3 3/16 inches diameter. In the second hole a 2 7/16-inch plug was fixed at 70 feet. In the third hole a 2 5/16-inch plug was fixed at 112 feet. In the fourth hole a 2 5/16-inch plug was fixed at 95 feet. In the fifth hole, which was bored 212 feet, two plugs were fixed — one 1 7/8-inch diameter, at 108 feet, and the other, 2 5/16-inch diameter, at 76 feet. In the sixth hole a 1 7/8-inch plug was fixed at 104 feet, from the mouth of the hole. In all cases the plug was fixed against a shoulder in the hole, where a reduction in size had taken place. This work being through, and after sealing off, the places were left untouched and frequently inspected. No leakage of any kind has ever been seen, and the various cavities made to house the boring tackle are now being closely stowed up to prevent any possible collapse of the strata to the adjacent boreholes. The plug used was slightly modified to enable the rods to be easily withdrawn. The original plug had a screwed end which fitted the boring rods. After fixing the first plug, difficulty was experienced in unscrewing the rods immediately beneath the plug, and a length of rod was left in the hole. A box-key arrangement was then adopted, and no further trouble was encountered.
|
|||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||