|
19th August 1933, Page: 36, Column: 1 Hartley Main Collieries EquipmentIn Volume 9 of the ARMSTRONG COLLEGE MINING SOCIETY JOURNAL a fully illustrated paper is published on "The Electrification and Modernisation of Hartley Main Collieries," which was read before the Society by Messrs. J. A. Metcalf and C. A. Ritchie. The reorganisation of the eight collieries owned by Hartley Main Collieries Ltd. was commenced towards the end of 1930, and the paper covers the actual carrying into effect of the modernisation, the three collieries cited for the purpose being the Dudley, Cramlington Ann Pit, and Hartley Colliery. The notes appended are extracted from the JOURNAL. Longwall Face Equipment. — The majority of the longwall faces are arranged on the double unit principle, each face being from 80 to 100 yards in length, and the heights of the seams worked in this manner vary from 2 ft. 6 in. to 1 ft. 10 in. It is usual for each face to be served by a 40 h.p. coal-cutter undercutting to a depth of 4 ft. 6 in. A shaker conveyor is used on each face, and both of these discharge into a belt conveyor in the mothergate. The horse-powers of the conveyor motor drives are from 5 to 17. A 1 h.p. Siemens-Schuckert rotary drill is used on each double unit, the holes being placed at intervals of about 5 yards and bored 4 ft. 6 in. in depth. The number of holes actually charged, however, depends on the effectiveness of the shots, such being the rapidity and ease with which the holes are drilled that this system has proved to he the most economic. All drilling work is finished in the course of the shift. The drills are provided with Wimet-tipped bits which are specially hard. Each double unit is fed from separate supply transformers, and each machine is operated from its own gate-end box with remote control and earth continuity. All the gate-cud gear is of the air break type, the supply voltage being 440, except in the case of the drills which have incorporated in their gate-end switch-box a step down 3-phase transformer to 125 volts. These drill gate-end boxes are of the double unit type, the transformer being large enough to take two drills in case of emergencies. In seams where naked lights are permitted a lighting tapping is taken from the gate-end boxes and the mother-gate and loading points are lighted by means of electric lamps in mining type fittings. Each gate-end box is fitted with an insulator so that repairs can be carried out without shutting down the whole system. The substations are built in an old cross gate, widened to approximately 10 ft. With a partition wall built 1 yard from the pack side. This partition wall lends itself to two uses firstly, it provides a second wayout for the substation, and secondly, both incoming and outgoing cables are carried through this emergency exit to the switchgear. These substations are moved forward approximately every 300 or 400 yards, and usually consist of a mining type high tension switch protecting transformer, a 60 k.v.a. mining type transformer 2750/440 volts, a low tension switch feeding all the gate-end gear fitted with suitable overload protection and 15 per cent. earth leakage protection and indication. Both high tension and low tension switches are of the flame-proof oil immersed type, special earthing devices being supplied for both in compliance with Rule 131 (G). The transformers have 110-volt lighting tapping between one phase and the neutral point, of the secondary side, feeding through a robust mining type double pole lighting switch with fuses. By this means adequate lighting is provided in each substation. The cable from the low tension switch to within 100 yards of the first gate-end box is 3300-volt paper insulated, lead covered double wire armoured cable, and as the face is advanced extra lengths are inserted so that when the substation is advanced the high tension cable is already installed. The last length of cable up to the first gate-end box is cab-tyre-sheathed pliable armoured. All the conveyors are controlled from the loading point by their respective gate-end switches, the coal-cutter and drill panels being coupled to these by a further length of pliable armoured cable, a portion of which is wound upon a double bollard, making it possible to move up these regularly as the face advances. Arcwall Coal-Cutting. — Arcwall coal-cutters have been used both for winning out and also splitting pillars in retreating work. These machines are 35 h.p. and are remote controlled with earth continuity and air break gate-end switches similar to those of the longwall machines. Some of the machines are used for under-cutting and others over-cutting, At the Hartley Hastings pit High Main seam which averages 4 ft. 6 in. high, this type of cutter is used for winning out 22-yard pillars. In the first instance the coal is undercut to a depth of 6 ft. and immediately afterwards sheared through the centre. By this means only two slots are required, one in each of the upper corners of the seam to bring down the coal. As these pillars are won out to the boundary they are extracted by the longwall retreating method working four pillars to one face. The coal is filled directly into tubs. Heading. — Where development work is not of an intense nature small machines are used for driving headings. These are of the percussive type, driven by 8 h.p. motors. This machine, similar to all other coal-cutters, is remote controlled incorporating the usual earth continuity. The headings are usually undercut to a depth of 6 ft. and 12 ft. in width. At present experimental work is being carried out with reciprocating saws driven by 2½ h.p. totally enclosed motors for sawing up broken timber to suitable lengths for use in the mine, thus obviating transport, of broken timber to the surface to be cut and sent down again for re-use. Pump ing. — Originally there were eight main pumping plants of various sizes and types in use underground. During the last two years three new pumping units have been put into commission. These have all been of the centrifugal type, and the one at Seaton Delaval C.D. pit will be described. This pump has seven stages, each with a separate section, running at 1140 r.p.m. on a 40-cycle supply. When the periodicity of supply is changed to 50 cycles the pump will run at 1450 r.p.m. and three of the stages will be dismantled, leaving four in commission. The bed plate is constructed in such a manner that this operation will take a minimum of time, the holes for the holding down bolts and dowel pins having been drilled at the works whilst on the test bed. During the erection at the manufacturers these pumps were tested at the 50-cycle speed, i.e., with four stages, and re-tested at the 40-cycle speed, i.e., with seven stages, so that no further alterations were necessary to put them into commission at the present time. Samples of the water to be pumped were taken and analysed before the materials used in the construction of the internal parts were manufactured. The pump is fitted with a Michell thrust, the other parts being similar to the ordinary section type centrifugal pump. It is driven by a 310 h.p. 3-phase, 2750-volt slip-ring induction motor of the inter-frequency type. No changes will be necessary on this motor when the change-over takes place. The pump and motor are mounted on a common bed and coupled together with a pin type flexible coupling. The motor is provided with short-circuiting and brush lifting gear interlocked with the liquid starter and stator switch so that it is impossible to switch in the stator with the rotor short-circuited. The stator switch consists of a mining type pillar having three over-loads, clock-work rotating air vane, slip clutch time limit devices, and no-volt no-close device and ammeter. Twenty-four auxiliary pumps have been installed, the horse-powers varying from 5 to 20, both single and multistage. These are of the customary type, excepting the pumps in use for draining working places or other situations where it is inconvenient to form a sufficiently large standage. The pumps for this purpose are of the "snorer" type, being from 5 to 10 h.p., and require no special attention excepting the routine oiling and greasing. This type of pump runs continuously whether pumping or "snoring" without causing any damage to internal parts, as always happens with the standard centrifugal pump. It really consists of two pumps, the ordinary centrifugal pump and mounted externally on the pump spindle an air extractor pump with radial impeller vanes. This extractor impeller runs in a separate casing, set eccentrically. The casing contains a certain amount of water, and when the extractor wheel rotates, the water is made to revolve in a continuous circle round the inside of the casing, causing a vacuum, the wheel dipping into the water at one point only. Two ports are fitted so that as air is drawn in at the suction port it is trapped by the extractor vanes and ejected to atmosphere through an exit port. The connection between the main suction branch and the inlet port of the air pump is controlled by a ball float valve. This valve remains open when air is passing, but closes automatically when the suction chamber of the main pump is full of water. The first of these pumps to be manufactured was bought by this Company, and two were installed, both of which were found satisfactory. Since then some sixteen such pumps have been installed. Where inbye de-watering work has been met with and multi-stage pumps have been required with no pump man in constant attendance, the delivery pipe has been fitted with a non-return valve of the ordinary flap type. The hinge-pin of the valve has been brought through suitable bushings to the outside of the valve casting, to which has been attached a limit switch connected in the no-volt circuit of the starter. By this means, if the suction strainer has been uncovered, or the pump has lost its water in any other manner whilst the attendant has not been present, the pump automatically closes down. This non-return valve is fitted with a by-pass valve to utilise the head of water standing against the pump for priming purposes. Shaft Cables. — All power shaft cables which have been put into commission are 3300-volt high tension 3-core cables for use on an earthing system. The conductors are shaped and paper insulated, being sheathed overall with lead. These cables are supported in the shaft by oak cleats bolted to the buttons, all the ironwork appertaining to the fixing being heavily galvanised. The various shaft cables were lowered into the shaft by means of hand winches or power driven winches, the cable being lashed at very short distances by spun yarn lashings to the winch rope so as to obviate any undue weight upon the cable. Ten shaft cables have been installed. Surface and Underground High Tension Cables. — These are of similar construction to the shaft cables, excepting that the impregnating oil is not specially drained from the cables, this being unessential as they are suspended in horizontal positions. There is one special feature not usually incorporated in the ordinary standard cable, and on several long feeders experimental work has been carried out by inserting four insulated conductors in the outer layer of armouring, to facilitate the testing of the earthing system. This is really the outcome of a lecture by H.M. Chief Electrical Inspector of Mines at the North of England Branch of the Association of Mining Electrical Engineers, in the course of which he mentioned that to facilitate the conductivity testing of cable armouring a pair of light insulated lines run alongside the cable would be of great assistance, and by using a suitable ammeter and volt meter the resistance of the cable armouring could be measured without interrupting the electrical supply to any machines working. Each of these testing conductors is built up of six strands of steel wire and one of copper, and insulated with varnished cambric. It is only really essential to have two such conductors, but it was thought advisable to incorporate four in case one was damaged which would mean the testing system being made inoperative. Low Tension Cables. — The majority of the low tension cables installed underground for use as arcwall coal-cutter feeders, and also on the surface where any vibration is experienced, such as on screening plants, are insulated with the well-known Henley "Herculene" insulation. They are 3-core cables both insulated and sheathed with "Herculene," armoured with a double layer of steel wire with serving between the layers of armour, and armour overall. This is found to be more suitable for such duties in comparison with lead covered paper insulated cables which are not capable of standing a great deal of undue mechanical handling. The lighting cables are of similar construction, except two cores are used and in some cases a single layer of wire armouring. Flexible Wire Armoured Cables. — This type of cable (used in connection with the coupling up of the gate-end boxes to the main supply system on the double unit faces) is also utilised between the gate-end switches and the face conveyors. In the former case 3-core cables are used, and in the latter 5-core. The tinned copper wires of the conductors are specially stranded to give maximum flexibility. Trailing Cables. — Two standard types of trailing cables are used in connection with portable machines such as coal-cutters. The first has 5 cores, each 0.0225 sq. in. cross-section, these being three working cores, one pilot core and one earth core. The second type is a 6-core cable with 4 cores, 0.0225 sq. in., and two pilot cores 0.007 sq. in. placed 180° apart on the pitch circle to give a mechanical balance. These two cores are connected in parallel. Drill Cables. — At the commencement of drilling operations an enormous amount of trouble was experienced in developing a suitable flexible cable for this type of work. However, by practical experience gained with the failure of several types which were tried, a suitable cable was evolved which has given every satisfaction. The cores of this cable ace of a composite nature, consisting of tinned copper wires and special alloy wires of high breaking strain, each core being 0.007 sq. in. cross-section. Each strand of the conductor consists of nine wires, seven being of copper and two at. 180° apart on the pitch circle of special alloy. These wires are twisted with a very short lay, the strands themselves also being given a short lay to form the conductor. The conductors are insulated in a similar manner to the flexible cables, and pliable armoured cables, except that they are standard 600 megohm grade, as the working pressure is only 125 volts. The cores are again sheathed with a thin coating of cab tyre rubber. The five cores are again sheathed with a rubber centre on the same pitch circle with a suitable lay, and sheathed overall with a cab tyre rubber to a thickness of approximately 0.12 in. It will be noted from the cross-section of the cable that special permission is required from the Mines Department to use this type of cable. All pliable armoured and flexible cables are tested regularly both for insulation and conductivity, the results of the tests being logged each week for reference. All cable repairs are carried out in one central shop, which has been specially converted for this purpose. It is steam heated throughout, thus making it possible to gradually dry out any cables which have suffered damage due to the ingress of moisture. Before repairs are carried out on these cables they are tested through a high tension spark gap testing apparatus. All vulcanising repairs are done in a patent electric vulcaniser of the bath type containing special vulcanising compound. The baths used are of extra large size, and it is possible to vulcanise six repairs in each bath. All cables bear tallies of identification so that the life of any cable can be traced from the day on which it was put into commission.
|
|||||||||||||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||