26th December 1931, Page: 183, Column: 1 Stowage Of The GoafBy Professor Granville Poole and J. T. Whetton.* In most continental countries colliery proprietors are compelled to stow the waste solidly in order to reduce surface subsidence as much as possible. In some countries, America for instance, where the resources are so great that the national loss of coal is not considered to be of such great importance as in this country, subsidence is reduced to some extent in certain mines by leaving large pillars of coal. Packing on the continent is done either by hand, hydraulically, mechanically or pneumatically. In recent years much work has been done to develop methods of stowing, and in this respect mechanical and pneumatic methods, especially the latter, seem to have made the greatest progress. Hydraulic stowage, against which there are various drawbacks, has in many instances been replaced by pneumatic methods with very satisfactory results. In this country the usual method of packing is by band with surplus dirt from canches, etc., and in general, the goaf is only partially stowed, that is to say, the work is confined to gate packs, middle packs and disused roadways. There are cases, however, where solid packing is very desirable, and other cases where, if solid packing were carried out, it might be possible to work coal which otherwise must remain unworked. In a paper read before the members of the Armstrong College Mining Society, and reproduced in Vol. 1 of the JOURNAL of the Society, Major H. M. Hudspeth gave the following figures for subsidence at a number of continental collieries, where the hydraulic method of stowage was in use. No. 1. — Subsidence with hand stowage, 50 per cent.; subsidence with hydraulic stowage, 25 per cent. No. 2. — Where a thickness of 2½ m. of coal was extracted, hand stowage would compress to 1.40 m. = 44 per cent. subsidence; hydraulic stowage would compress to 1.70 m. = 32 per cent. subsidence. The hydraulic stowage here was badly done. No. 3. — In the Liege district hydraulic stowage, as compared with hand stowage, reduces subsidence from 50 to 20 per cent.. No. 4. — Subsidence with hand stowage, 50 per cent., with hydraulic stowage 20, 15 or as low as 10 per cent. No. 5. — When stowing with sand, 5 per cent. subsidence. No. 6. — A seam 9 feet 10 inches to 11 feet 5¾ inches thick was extracted at a depth of 131 to 218 yards. The maximum surface subsidence measured was 10 per cent. — minimum 8 per cent. No. 7. — The minimum average in Upper Silesia is 8 to 10 per cent. No. 8. — At a pit in Upper Silesia 24 feet 7 inches. to 26 feet 3 inches of coal was extracted, and the measured surface settlement was 8 to 12 inches, or approximately 4 per cent. [The authors have, visited this mine and have seen coal about 30 feet thick taken out under a town without apparent damage.] No. 9. — Coal was worked out in four seams — total thickness 55 feet 9 inches. The measured surface subsidence was 8 feet 6 inches = 15½ per cent. No. 10. — The surface subsidence was 7½ per cent. of the seam thickness. No. 11. — The surface subsidence was reduced by hydraulic stowage, compared With stowage by hand, from 40 or 50 per cent. to 15 or 20 per cent. Minimum subsidences are obtained with sand filling, and may be as low as 5 per cent. The following comparative figures were given to us in respect of subsidence of the surface when using different methods of packing at a colliery in Germany: (1) Hand stowage with material from 0 to 12 inches, subsidence is 40 to 50 per cent. (2) Mechanical stowage with material from 0 to 3 inches, subsidence is 15 to 25 per cent. (3) Pneumatic stowage at a pressure of 3 to 6 lb. per square inch, subsidence is 25 per cent. (4) Pneumatic stowage at a pressure of 15 to 22.5 lb. per square inch, subsidence is 15 per cent. Although conveyers were introduced primarily for facilitating transport of coal along the face and in gate roads their use has now been extended in many mines to the conveying of debris, the latter being discharged or projected into the goaf by various means. Amongst the mechanical methods the following may be mentioned: (a) Throwing or slinging machines utilising centrifugal force. (b) "Shovelling" machines which are intermittent in action in a manner imitating ordinary shovelling. (c) Rotary blade machines. (d) Conveyors. (e) Scrapers. Demag of Duisburg has applied the scraper loader to gob stowage work. The plant offers important advantages as it is able to pack debris of a much larger size. This firm installed their first scraper loader gob stowage plant at the Minister Achenbach Colliery in February, 1928. The principle is similar to that for the conveying of coal along a longwall face. There is a small main-and-tail hauler, and the velocity is up to 6 feet per second on full load, and 9 feet per second when returning the empty scraper. The diameter of the main rope is 1 inch, and the tail rope 0.75 inch. The scraper has a capacity of 0.8 cubic yard. An elevating tippler discharges the debris into a short feeding chute which deposits the material at the "charging point" of the scraper. The latter is automatically charged and returned along the floor to the gobbing position, where it ascends the natural slope formed in the process of packing. The front end of the scraper acts as a ram, and thus tends to force the material, already in position, more tightly into the goaf. On withdrawing the scraper its contents are discharged automatically. Five men are required for working the plant, one man at the engine, two men at the elevator and two men at the stowage position. 357 cubic yards of debris has been stowed in one shift. The method is said to be 38 per cent. cheaper than hand stowage. This method of stowage has certain disadvantages, such as incomplete filling between adjacent stowage lifts, and there is a cavity of varying depth between the top of the stowage and the roof through which the main rope passes from the scraper to the drum of the engine. When the scraper is rammed into the goaf large sparks may be generated, and there is also constant sparking and heating at the top of the stowage due to friction of the rope on the debris. The authors are doubtful as to the safety of such a plant, and the formation of hot sparks near the roof where gas is most likely to exist is certainly a source of danger. In Germany the material used for stowage of the goaf by pneumatic methods varies. The ripping dirt from the levels is used for hand packing on either side of the level. This forms a barrier for the first application of the air-blown debris, which consists either of washery waste, wetted pit dirt, gravel, sand and clay, and is usually taken into the mine in tubs. The method of stowing is either parallel or at right angles to the face, mostly the former on large scale work, but the latter has attained some measure of success in local application. At Auguste Victoria Colliery, Huls, near Essen, the dirt from the washery plant is taken down the mine for pneumatic stowage purposes, but damp pit debris is also used. Emscher-Lippe Colliery, Datteln, Essen. — There is at this colliery a small skip winding plant at the staple pit and automatic stowage of the goaf. It is doubtful whether a skip winding plant would be used in this country for a similar scheme; perhaps a drift from one level to the other would prove more economical eventually. The skip winding engine has two cylinders and is driven by compressed air with 30 per cent. expansion. The cylinders are 14 inches in diameter by 16 inches stroke. Pneumatic Stowage at Monopol, Grimberg, Germany. — This plant is manufactured by Miag and has proved satisfactory for stowing the goaf with washery debris or damp pit dirt. A 200 h.p. electrically driven compressor supplies 4,800 cubic feet of air per minute at a pressure of 0.1 to 0.6 atmosphere. The compressed-air pipes are made of steel 13 inches diameter and 1/8-inch thick. These are connected to a mixing or feeding apparatus, which consists of a hopper with a turntable below. Washery debris which has passed through a 3½-inch screen is tipped into the hopper and passes on to a turn-table, whence it is scraped off into a smaller hopper and fed into a horizontal wooden cylinder. Within the latter is a rotating disc with six arms which regulates the feed of debris into the stowage pipe below. The 6 h.p. compressed-air engine drives the scraper and disc, and the speed at which these are driven controls the supply of stowage material to the pipes. Cast-iron stowage pipes 10 inches diameter and 1/5-inch thick are used on the levels or gates, and sheet-iron pipes 1/12-inch thick and 3 yards long are used on the face. The latter pipes are worn out in from 6 to 8 weeks. The management of the colliery state that the cost of pneumatic as compared with hand stowage is 9½d. as against 2s. 2½d. per cubic yard. The reduction in cost by the pneumatic method is said to be 1s. 1d. per ton of coal. This also proves the advantage of small scale plant. * Excerpts from paper prepared for the meeting on 12th December of the North of England Institute of Mining and Mechanical Engineers.
|
|||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||