13th December 1930, Page: 161, Column: 1
Mechanical Conveyors Underground
By H. E. Tyson, B.A., Stud.I.M.E.*
Almost the first thing to be considered when opening out a new
district or seam is whether roadways can better be preserved with,
or without, pillars of coal being left in for their support. Experience
in the seam is the best guide, but is not always available.
It seems to have been the general practice to leave pillars of coal
to support roadways — (a) When the coal is thick (six feet and
upwards) and little material is available for building roadside
packs; (b) When the strata immediately above the seam contain
no "strong" stratum (e.g., sandstone) which will settle without
greatly breaking up, i.e., will bend considerably without breaking.
Seams near the surface usually demand the leaving in of pillars
of coal owing to the presence above only of friable weathered strata.
The leaving in of coal pillars necessitates previous winning out
of a district or "panel" before conveyors can be installed to
extract the bulk of the coal. In the long run it usually pays to
win out a district carefully and extract the coal retreating, although
it means delaying the large output with smaller costs. Nowadays,
however, the tendency is to extract all the coal while advancing.
The disadvantage of leaving pillars of coal comes in their eventual
extraction, when, owing to crush, difficulty may be experienced
and a considerable quantity of coal lost. Herein lies the advantage
of the panel system of working where a minimum number of
"permanent" main roads are driven, the pillars supporting the
main road of the panel being extracted while another panel is
being worked. The advent of arch girders and the gaining of
experience in their possibilities has aided considerably in altering
the older preference for "coal sides."
The advantage of the conveyor fundamentally lies in its continuity
of collection of the output of a number of coal getters and
delivering it along the fewest number of roads on to the main
haulage. In a low seam this is a very big factor, as roadways of
tub height have not to be made for each man working at the face,
a considerable amount of canch work being thus saved. In addition,
the use of ponies is almost entirely eliminated.
Temptations to be guarded against when installing conveyor
systems are: (a) The temptation to run conveyors, more particularly
mothergate or "trunk" conveyors, in low roadways.
It is most essential for main conveyors to be easily accessible to
mechanics for repairs and adjustment, and a ripping of the roof or
floor will easily repay its cost in reducing the duration of stops and
the wear of the machinery. (b) To make faces too long. If a
conveyor is kept a reasonable length it will obviously be less liable
to break down. Also, in work on a conveyor face careful selection
of sets of men must be made, and, other things being equal, the
smaller these sets are the better. Again, the work of under-cutting
the coal, drawing the conveyor up to its new track, and withdrawing
the goaf supports, must be well within the capacity of the men
appointed to perform in their shift. It is better for these men to
perform their tasks thoroughly and have time to spare, rather
than that they should be rushed and leave some job only half
completed. Further, if a conveyor breaks down or the supply
of tubs is slack, fewer men are stopped in a short face than in a
long one. Efficient supervision, involving a meticulous attention
to details, is a very important factor in the successful employment
of underground conveyors.
Machinery. — The best type of coal-cutter or conveyor to be used
is a matter for individual preference and consideration, but one
point may be made regarding the conveyor which loads into tubs.
This ought, wherever possible, to be a conveyor of the shaker type
because, owing to its intermittent delivery, tubs can be filled more
fully and the coal can be better packed, thus reducing the spillage
on the haulage road, and a tub can be changed readily while the
pans are on their forward stroke and no coal be spilled in the process.
When conditions demand the use of a belt conveyor as the
loading conveyor, I go so far as to suggest the advisability of
adding to it at the loading end two or more "shaker" pans which
can be jigged by means of an eccentric coupling on to the shaft
of the driving drum of the belt conveyor.
Loading Points. — If the conveyor system has been carefully
laid out a large quantity of coal will be loaded into tubs at one permanent
loading point. A loading point should be so constructed
that the tubs have to be man-handled ns little as possible and ponies
entirely eliminated. Careful grading and levelling of the tracks
at the loading point is most essential.
Roof Support. — The use of steel supports on reads and faces is
nowadays almost taken for granted, and much has been
written and said about types and methods of use. A few points
are: (a) Roadways: When the roof does not settle greatly and
a flat parting is found, straight girders on stringing balks, supported
by steel, cement, or "pickled" wood props, are best. Roadways
through the goaf are usually best preserved by arch girders
(circular, straight legged, etc., types), although if the roof has a
flat parting at a strong stratum and very good packs of strong
post stone are built at the roadside, straight girders will be satisfactory.
(b) Face: By the use of steel props and corrugated steel
straps (i.) The goaf can be drawn cleaner, enabling a clean break
in the roof to ensue, thus relieving weight off the face. (ii.) Two
inches more height is gained by a steel strap over a wood plank.
(iii.) A steel strap will bend over the conveyor track rather than
break, and coals travelling along the belt readily slide under it
without drawing it out. (iv.) The expanding steel prop, which
remains rigid when set but which can be easily withdrawn, although
expensive in first cost, is cheaper than the fixed length pipe or
H section rigid prep in the long run.
Some Systems of Working. — Reference may be made to three
systems of conveyor working: (1) Suitable for a seam thick
enough to enable tub roads to be driven in the coal without any
ripping. (2) Suitable for a thinner seam where coal pillars are
best left in, but ripping has to be done to enable tubs to travel
to the face. (3) Suitable for a seam which is wholly extracted
advancing.
In (1) the coal is Worked in pillars, headings being driven in
the coal by the use of arc-wall coal-cutters. Tubs can be filled
at the face of each heading without it being necessary to rip either
the roof or the floor. The pillars are afterwards taken out by a
modified longwall retreating system. Two pillars are left in on
each side to support the main haulage roads and the return airways
until the boundary is reached, when these are extracted by a
retreating system similar to that practised when advancing, on the
other pillars. The size of these support" pillars should be such
that a reasonable length conveyor face can be made of them when
they are to be extracted. The size of the pillars is a matter
for individual judgment.
In (2), when the coal is thinner so that stonework has to be done
to enable tubs to travel to the face, fewer roads must be driven
and the coal which is to be extracted must be won out into large
panels. Long headings must be driven during the winning out,
but this is unavoidable. These should be ventilated 'by extensible
canvas tubing and small exhauster fans. A smaller output is
obtained during the winning, out, and the cost is greater than that
in the thicker seam, also the, winning out of a panel takes a considerably
longer time. In this system two pillars of coal are left
on each side of the haulage road to support it and the return airway,
the rest of the coal being extracted by the use of conveyors.
In (3), when roadways can be carried through the goaf, an
advancing longwall system shows the quickest returns, and conveyors
can be used from the commencement for winning out.
* From paper presented at November meeting of the Associates and
Students meeting of the North of England Institute of Mining and
Mechanical Engineers.
 |
 |
|