Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

13th December 1930, Page: 161, Column: 1

Mechanical Conveyors Underground

By H. E. Tyson, B.A., Stud.I.M.E.*

Almost the first thing to be considered when opening out a new district or seam is whether roadways can better be preserved with, or without, pillars of coal being left in for their support. Experience in the seam is the best guide, but is not always available. It seems to have been the general practice to leave pillars of coal to support roadways — (a) When the coal is thick (six feet and upwards) and little material is available for building roadside packs; (b) When the strata immediately above the seam contain no "strong" stratum (e.g., sandstone) which will settle without greatly breaking up, i.e., will bend considerably without breaking. Seams near the surface usually demand the leaving in of pillars of coal owing to the presence above only of friable weathered strata.

The leaving in of coal pillars necessitates previous winning out of a district or "panel" before conveyors can be installed to extract the bulk of the coal. In the long run it usually pays to win out a district carefully and extract the coal retreating, although it means delaying the large output with smaller costs. Nowadays, however, the tendency is to extract all the coal while advancing. The disadvantage of leaving pillars of coal comes in their eventual extraction, when, owing to crush, difficulty may be experienced and a considerable quantity of coal lost. Herein lies the advantage of the panel system of working where a minimum number of "permanent" main roads are driven, the pillars supporting the main road of the panel being extracted while another panel is being worked. The advent of arch girders and the gaining of experience in their possibilities has aided considerably in altering the older preference for "coal sides."

The advantage of the conveyor fundamentally lies in its continuity of collection of the output of a number of coal getters and delivering it along the fewest number of roads on to the main haulage. In a low seam this is a very big factor, as roadways of tub height have not to be made for each man working at the face, a considerable amount of canch work being thus saved. In addition, the use of ponies is almost entirely eliminated.

Temptations to be guarded against when installing conveyor systems are: (a) The temptation to run conveyors, more particularly mothergate or "trunk" conveyors, in low roadways. It is most essential for main conveyors to be easily accessible to mechanics for repairs and adjustment, and a ripping of the roof or floor will easily repay its cost in reducing the duration of stops and the wear of the machinery. (b) To make faces too long. If a conveyor is kept a reasonable length it will obviously be less liable to break down. Also, in work on a conveyor face careful selection of sets of men must be made, and, other things being equal, the smaller these sets are the better. Again, the work of under-cutting the coal, drawing the conveyor up to its new track, and withdrawing the goaf supports, must be well within the capacity of the men appointed to perform in their shift. It is better for these men to perform their tasks thoroughly and have time to spare, rather than that they should be rushed and leave some job only half completed. Further, if a conveyor breaks down or the supply of tubs is slack, fewer men are stopped in a short face than in a long one. Efficient supervision, involving a meticulous attention to details, is a very important factor in the successful employment of underground conveyors.

Machinery. — The best type of coal-cutter or conveyor to be used is a matter for individual preference and consideration, but one point may be made regarding the conveyor which loads into tubs. This ought, wherever possible, to be a conveyor of the shaker type because, owing to its intermittent delivery, tubs can be filled more fully and the coal can be better packed, thus reducing the spillage on the haulage road, and a tub can be changed readily while the pans are on their forward stroke and no coal be spilled in the process. When conditions demand the use of a belt conveyor as the loading conveyor, I go so far as to suggest the advisability of adding to it at the loading end two or more "shaker" pans which can be jigged by means of an eccentric coupling on to the shaft of the driving drum of the belt conveyor.

Loading Points. — If the conveyor system has been carefully laid out a large quantity of coal will be loaded into tubs at one permanent loading point. A loading point should be so constructed that the tubs have to be man-handled ns little as possible and ponies entirely eliminated. Careful grading and levelling of the tracks at the loading point is most essential.

Roof Support. — The use of steel supports on reads and faces is nowadays almost taken for granted, and much has been written and said about types and methods of use. A few points are: (a) Roadways: When the roof does not settle greatly and a flat parting is found, straight girders on stringing balks, supported by steel, cement, or "pickled" wood props, are best. Roadways through the goaf are usually best preserved by arch girders (circular, straight legged, etc., types), although if the roof has a flat parting at a strong stratum and very good packs of strong post stone are built at the roadside, straight girders will be satisfactory. (b) Face: By the use of steel props and corrugated steel straps (i.) The goaf can be drawn cleaner, enabling a clean break in the roof to ensue, thus relieving weight off the face. (ii.) Two inches more height is gained by a steel strap over a wood plank. (iii.) A steel strap will bend over the conveyor track rather than break, and coals travelling along the belt readily slide under it without drawing it out. (iv.) The expanding steel prop, which remains rigid when set but which can be easily withdrawn, although expensive in first cost, is cheaper than the fixed length pipe or H section rigid prep in the long run.

Some Systems of Working. — Reference may be made to three systems of conveyor working: (1) Suitable for a seam thick enough to enable tub roads to be driven in the coal without any ripping. (2) Suitable for a thinner seam where coal pillars are best left in, but ripping has to be done to enable tubs to travel to the face. (3) Suitable for a seam which is wholly extracted advancing.

In (1) the coal is Worked in pillars, headings being driven in the coal by the use of arc-wall coal-cutters. Tubs can be filled at the face of each heading without it being necessary to rip either the roof or the floor. The pillars are afterwards taken out by a modified longwall retreating system. Two pillars are left in on each side to support the main haulage roads and the return airways until the boundary is reached, when these are extracted by a retreating system similar to that practised when advancing, on the other pillars. The size of these support" pillars should be such that a reasonable length conveyor face can be made of them when they are to be extracted. The size of the pillars is a matter for individual judgment.

In (2), when the coal is thinner so that stonework has to be done to enable tubs to travel to the face, fewer roads must be driven and the coal which is to be extracted must be won out into large panels. Long headings must be driven during the winning out, but this is unavoidable. These should be ventilated 'by extensible canvas tubing and small exhauster fans. A smaller output is obtained during the winning, out, and the cost is greater than that in the thicker seam, also the, winning out of a panel takes a considerably longer time. In this system two pillars of coal are left on each side of the haulage road to support it and the return airway, the rest of the coal being extracted by the use of conveyors.

In (3), when roadways can be carried through the goaf, an advancing longwall system shows the quickest returns, and conveyors can be used from the commencement for winning out.


* From paper presented at November meeting of the Associates and Students meeting of the North of England Institute of Mining and Mechanical Engineers.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Tyson, H. E.      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print