|
1st November 1930, Page: 128, Column: 2 Machine MiningThe object of the paper on "Machine Mining in Faulted Ground," prepared by Alan L. Ford for the meeting of the North of England Institute of Mining and Mechanical Engineers on the 25th October, was to show that faulted ground can not only be worked by machine mining, and with the use of conveyors, but that machine-working can be so adapted as to be more suitable than older methods to overcome the difficulties caused by faults. Faults must always cause delay and introduce an added element of danger to mining operations, but by the correct application of machine mining and the use of steel supports, which enable the attainment of a real control of the roof, delay and danger can be minimised. By these methods a fault once dealt with is left behind in the goaf and gives no more trouble, and a much more efficient ventilation is maintained, as the air-current is kept sweeping both sides of the fault while it is exposed.
|
|||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||