|
5th April 1930, Page: 304, Column: 2 Standardisation Of Electrical FrequencyTaking for his subject "Preparations for the Standardisation of Electrical Frequency at the Collieries of Northumberland and Durham, Mr. George Raw (branch president) addressed the members of the North of England branch of the National Association of Colliery Managers on the 22nd of March. He said that seventy-five per cent. of the electric current now generated in Great Britain was of 50-cycles frequency. The remaining 25 per cent. included that generated in the North of England, which was of 40-cycle frequency, To convert that 25 per cent. to the same frequency as the rest would entail a cost estimated at £8,250,000. The industries, and especially the collieries on the North-East, were being asked to undertake an extremely difficult engineering project. Given the necessary resources, it could be done efficiently and unostentatiously, as British engineers usually did things, but no useful purpose was served by minimising the nature of the task. The Central Electricity Board had no powers to pay compensation for any loss of output incurred if the work of the collieries was interrupted in carrying out the project. The Board had only powers to pay for the total engineering cost of changing the necessary plant. It was up to the colliery managers to address themselves to the task of carrying it through without loss of production. It was impossible to do it at any large colliery at week-ends or holiday periods; therefore it would have to be done in stages over as many such periods as possible. Collieries which generated a proportion of their own supply, Mr. Raw added, would have to have their generators rebuilt or replaced. New sets would, in most cases, be necessary. In the case of underground pumping plants, new pump houses as well as new pumping plants might be necessary to avoid the risk of flooding the mines when the change was taking place. The change, however, was not without its advantages. It would give the colliery staffs opportunities for modernising some of their obsolete plant.
|
|||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||