2nd November 1929, Page: 117, Column: 1 Machine MiningBy Alan L. Ford, Stud.I.M.E.* As the thicker and more profitable coal seams in Durham and Northumberland are fast becoming exhausted, the attention of mining engineers is more and more being focussed upon machine mining as the only economic means of working the thinner seams which remain. Longwall conveyor faces having only two gateways offer a solution of the problem of working the thin seams without the enormous expenditure entailed by caunches or rippings in bord-and-pillar, or longwall gateway workings. The idea, however, that the working of longwall conveyors is almost impossible, or at any rate impracticable, in badly faulted areas, seems to be generally held. The writer feels sure from the experience gained in a faulted area that machine working by longwall conveyor faces has been more successful than any other method could have been for the following reasons :— (1) Owing to the varying gradients hand putting would have been out of the question, and pony putting would have been very costly. The cost of stone drifting through the faults would have been very high on account of the large number of places to be put through the faults. Using longwall conveyors the minimum number of places have been drifted through the faults, and all haulage is by short sets (6 tubs) electrically driven. (2) In a seam from which gas is given off trouble might be expected in ventilating either stepped longwall faces, or bords and walls, but it is comparatively easy to ventilate longwall conveyor faces, while the small number of gate-roads, coupled with the fact that wood separation doors are used in all cases, reduces the amount of air leakage to a minimum. (3) Rapid advance gives a newly exposed roof for each day's work, and the coal is filled away cleaner than in hand working. (4) A greater amount of coal is won from a given area than by any other method as the following figures relating to one particular conveyor prove: Area of coal worked by conveyor, 27,200 square yards; average height of coal, 2 feet 6 inches; theoretical yield for this area, 21,344 tons; coal actually won, 20,605 tons; coal lost, 739 tons. On this face there was a fault dipping East on the face (which was working to the South) with a throw of from six inches to eighteen inches, during the whole time the conveyor worked, and to this fault all the loss (which is remarkably small) may be traced. The seam with which the paper deals is the Brockwell Seam, varying in thickness from 2 feet 4 inches to 3 feet. The roof of the seam is formed by the underclay of a small seam which is one of three small seams varying from 2 inches to 10 inches in thickness, none of them being of a constant thickness over any great distance, and these three seams, or bands of coal, together with their underlying fireclays, form the immediate roof to a thickness of from four to five feet. Above this is about nine feet of blue shale, surmounted with a 20 feet bed of post. The floor is a medium fireclay. The depth of the seam is about 500 feet, and the average gradient is about 2½ inches per yard dipping from West to East, but the gradient is subject to wide variations, the seam in some places rising to the East, and in one case dipping to the East at an angle of 45 degrees. Faces are worked due South in direction "on end" to the cleat of the coal, and are of a standard length of 100 yards, the maingate being at the East end of the face. Shaker conveyors are in use, working in single units, delivering to the dip, and are worked in series of three faces on each main haulage road driven East or West, each face having a lag of 50 yards, at least, behind the previous advancing face, and each series of three faces having a separate stream of ventilation. The distance of 50 yards between the advance of the faces is not due to the time taken to win out each successive face, but is due to the fact that it has been discovered that at each 50 yards of advance the main-break of the roof strata takes place with great regularity, and can be observed by taking note of the bending of the girders set in the gateways. The direction in which the faces have been driven has been varied in order that either the main- or tail-gates might follow the line of the larger faults where these faults run anything like North and South, and the length of the faces has often been reduced when the coal between two faults was less than 100 yards in length. The faces are supported by composite props — weldless steel tubes 3 inches outside diameter by ¼ inch thick and tightly filled by an ordinary Norway pit prop cut to an octagonal shape and pressed into the tube — carrying corrugated steel straps 5 feet in length, 5 inches wide, and 3/8 inch thick. The main-gates are supported by steel arch girders 5" x 3" section, 10 feet wide by 8 feet high, and the tail-gates by steel arch girders 6 feet wide by 6 feet high and of the same section as the above. In both cases the girders are set upon the floor without any wood sole pieces, and are carried right up to the advancing face. Struts are not placed between the flanges of the girders as it has been found, under the conditions which prevail, that better results are obtained by taking the caunches narrow and cutting back the girders into the side stone. Under a roof such as this seam has, the question of roof control is of paramount importance, and it may be mentioned that at an adjoining colliery working the same seam by stepped longwall gateways, it was found that whenever two gateways were driven up into line with each other there was a collapse of the roof. In the case under consideration the roof is maintained unbroken over a face of 100 yards in length, by means of the steel supports set upon the face so as to support the break produced by the coal-cutting machine and induce a break on the goaf edge between successive main-breaks, thus forming a step-break on the goaf edge. There are several advantages gained by using this stepped break :— (1) The goaf edge falls very lightly and there is very little displacement of the goaf edge supports, (2) The coal-cutting machine passes along the face without the removal of any of the supports, which means less danger, as there is often danger in re-setting props while the machine is working, and also means a great saving of time. (3) Straps taking the main weight in the centre, bend down in the centre and do not have the effect of making the props fly out, as is often the case when the straps are set right up to the coal, i.e., with their ends on the breaks. (4) Props erected by the fillers are not removed until finally withdrawn after the conveyor has been removed from under them. * From paper on "Machine Mining in Faulted Ground," arranged to to be read at the general meeting on the 19th October of the Associates and Students' Section of the North of England Institute of Mining and Mechanical Engineers.
|
|||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||