Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

4th May 1929, Page: 324, Column: 2

Endless Rope Haulage

By J. D. Stewart.

From paper read at the annual meeting of the Mining Society of Nova Scotia. The Author is Assistant Chief Engineer of the Dominion Coal Company Ltd.

We have read how a hundred years or more ago, in some parts of Scotland, coal was transported along the mine roadways and up the shaft in corves or baskets carried on the back of the miner or on that of his wife. And again, in mines where the seam was thin, this basket or box was drawn along the pavement by a rope passing between the knees and looped about the neck of the miner, who crawled along a none too smooth roadway on his hands and knees in the dark, dragging his couple of bushels of coal behind him. Underground hauling methods have gradually improved until to-day, instead of hauling a cwt. of coal at a snail-like pace, we have the electric locomotive hauling two hundred tons at twenty or more miles per hour along well illuminated passages and on heavily ballasted and smooth roadways, or the low speed endless-haulage system, with which this paper is concerned, reaching out for three miles or more and hauling 300 tons per hour with a rope strain of 70,0001b. or so.

Low Speed Haulage.

The low speed endless-rope system of haulage — that is, the system using a rope speed of 2½ miles per hour or so — is favoured on account of its comparative low cost of installation, the ease with which it may be extended, and because of the fact that the mine-cars are delivered singly and at regular intervals, thus necessitating but short landings and bankheads. Also, due to its low speed, the same careful track laying as is necessary with the higher speed haulages is not essential, though much to be desired. And again, in case of derailment of cars, the resulting damage is not so serious as that due to the derailment of cars running at high speed.

To offset these advantages, however, the cost of maintenance of ropes and pulleys, and the power and the labour cost at the landings, will be considerably higher than that for the trip or the locomotive haulage systems. There is also the necessity for maintaining a double track for the entire hauling distance. The greatest disadvantage, however, is that as the mine workings are extended the number of mine cars required by this system becomes excessive and the large number of cars on the rope greatly increases the rope strain and the power requirements. As a general rule, to handle a given output with the same capacity mine car, the mine equipped with the endless-rope haulage system will require 20 per cent. more cars than the mine with the trip haulage system. On a long haulage, even where the gradient is but moderate, the weight of the rope forms a considerable proportion of the load, reaching probably as high as 20 per cent. of the weight of the coal in transit, while the power required to overcome the rope friction will exceed that required to overcome the frictional resistance of the net coal load.

There is probably no limit within reason to the distance coal may be hauled by the endless-rope system, providing that the output required is small, the gradient favourable, and the pit tubs light. Under these conditions the system may be indefinitely extended and may be so developed to operate on curves, on undulating roadways, and with branch lines for subsidiary haulage on the mine levels. But where these conditions are reversed, the system, to operate successfully, must consist of but a single line without branches and the roadway must be straight and without sudden variations in the gradient.

Ideal conditions are seldom met with in the mine. Money expended in obtaining well and evenly graded haulage-ways, in the elimination of curves, and in preparing properly graded landings, will quickly be returned in the shape of decreased power requirements, in freedom from breakdowns, and in the decreased wear and tear on the equipment. The importance of properly designed roadways cannot be too strongly stressed, and, as the hauling distance increases, the greater becomes the necessity of obtaining and maintaining good roadways. As on the surface, the mine roadways are the arteries through which flows the commerce of the mine, and it is essential to the prosperity of the mine that the flow of underground commerce be maintained with rapidity, regularity, and economy.

The distance coal may be drawn with the endless-rope system depends upon the gradient of the haulage-way, and, conversely, if the same rope strain is to be kept, the gradient on which the system can be operated depends upon the length of the hauling distance. When the load on the rope through either of these factors — distance or grade — or a combination of the two, produces a rope strain which necessitates a rope of such size and weight as to form an abnormal proportion of the load and to produce excessive friction in itself at the pulleys and hauling wheel, and in the haulage machine itself, it becomes more economical to install a second or a relay unit than to continue the use of the single system, since the extra cost of power absorbed in hauling the excessive rope weight, in the higher cost of maintaining the haulage gear and the more frequent rope renewals, will more than offset the cost of operating a second hauling unit.

Large Capacity Mine Cars.

During the last few years the tendency has been towards the use of larger and still larger capacity mine-cars. This is made possible by the wider use of mechanical haulage and the adoption of the roller or the ball-bearing car wheel. The benefit of the ball bearing wheels is felt more at the landings and in the rooms, where the cars have often to be moved by hand. On the main haulage-way, however, especially if the gradient is heavy, the benefit of the ball-bearing wheel is not so apparent and the saving in power due to their use is but small. The great advantage of the roller or ball-bearing wheel over the plain bearing is in the saving of labour and oil in their lubrication. With the plain bearing lubricated With oil, there is an enormous waste of oil, which constantly drips off and tends to make the roadway dirty and at the same time increase the fire hazard by depositing this highly inflammable material on the road.

The weight of the tub is an important factor in determining the gradient on which the endless-rope system may be successfully operated, especially when the weight of the loaded tub is in the vicinity of, say, 6,000 pounds or more, and where the haulage-way is double tracked and with landings on either side of the roadway on which the tubs have to be man-handled. Where such conditions as the above obtain, and if the gradient is more than 10 per cent., it would be advisable to install the trip-haulage system in preference to the endless-rope system.

Dominion Coal Company's System.

A notable example of the low-speed endless-rope haulage system, and one which has now reached the economical distance from which coal may be hauled by a single system, is now in use in the No. 4 mine of the Dominion Coal Company. The original haulage installation was put in operation in this mine in the year 1897, when the greatest hauling distance was about 3,000 feet. At that time there were three separate endless-rope haulage systems in use serving the East and West deeps and the West level.

These machines were installed on the surface near the shaft, with the ropes leading through vertical bore-holes, 175 feet deep, to the mine. The three machines were set up side by side and were driven by a 22in. by 42in. non-condensing, slide valve, steam engine, running at 60 r.p.m. through friction clutches and single reduction spur gearing giving a speed reduction ratio of 5.5 to 1. The rope wheels were 6ft. 10in. diameter, and the rope speed 235 feet per minute. The steam engine was built in 1872. This engine is still in use and giving excellent service, notwithstanding that it has been well over half a century in constant use, the only major repairs that have been made during this time being the replacement of the piston rod. The steam cylinder has been once re-bored.

To-day the East deep only is producing coal in No. 4 mine — the sections tributary to the West deep and to the West level having been worked out some 12 years ago. The East deep was gradually extended until in 1922 the hauling distance was 12,200 feet. The grade of the haulage-way for its entire length is fairly constant at about 7.33 per cent. The large number of cars on the rope entailed by this long hauling distance overtaxed the power; of the steam engine and the strength of the haulage machine.

The question of replacing the existing haulage machine with heavier equipment to further extend the hauling distance, and the alternative suggestion to instali a second or a relay hauling unit in the lower part of the deep, was then considered. The former scheme was adopted and it was decided to replace the existing haulage gear by a stronger and heavier one, to install an auxiliary steam engine to give the additional power required, and to use, later on, a 1¼in. diameter rope in place of the 1 1/3-in. diameter rope then in use. While making these changes it was required that the operation of the colliery be not impeded. This was accomplished by making a temporary re-arrangement in the lead of the rope and by installing the new machine on the site of the disused machine extreme from the haulage engine. The auxiliary steam engine was coupled to the extended end of the existing crank or first motion shaft. The new haulage machine is of the conventional type, differing only in weight and strength from the ordinary haulage gears. The machine is driven through a friction clutch and single reduction gearing, giving a speed reduction ratio of 6 to 1.

The rope wheel is of cast-steel with chilled cast-iron lagging segments bolted to its periphery, about which the rope makes six coils on a pitch diameter of 8ft. 3in. On either side of the rope wheel is cast a brake path 7ft. 2in. diameter and 6¼in. wide. The gear wheel is of cast-steel with 96 cast teeth, 3¼in. c.p. and 15in. face. The gear and the rope wheel are keyed to a 14-in. diameter shaft which is nicked down to 10in. diameter in the bearings. The pinion is also of cast-steel with 16 fully shrouded cast teeth. The friction clutch is of the band type. The friction wheel is 5ft. 6in. diameter and is keyed to the extended hub of the pinion. The rope speed is 258 feet per minute. At the present time the distance from the pit bottom to the end of the East deep is about 17,000 feet.

A new level, the 19th, at 16,000ft., is now being driven, and from this coal is being hauled by the main haulage. Above the 19th level there are four producing levels at intervals of 1,070, 1,050, 1,000, 900 feet. Below the 13th level, 9,100 feet from the pit bottom, the mine is single sided, that is, all the mine workings are to one side, the south side, of the haulage-way. The haulage-way has double tracks of 23½in. gauge, the inner track being the full one. The average grade from the pit bottom to the 19th level is 7.33 per cent. The total vertical lift is 1,120 feet.

The cars used in this mine are of the end-dump type, are of 1.4 long tons capacity, and have a gross weight of 4,550 pounds. Hadfield's cast-steel wheels, 12in. diameter, with plain bearings are used. The total capacity of the mine cars is 780 tons, or 71 per cent. of the average output of the mine per shift.

Breaking Strain of Rope.

The haulage rope is 1¼in. diameter, best plough steel, Lang's lay, with six strands of seven wires over a hemp core. The specifications require the wires to have a minimum tensile strength of 224,000 pounds per square inch, and the rope to have an actual breaking strain of 67 tons. The wires must also stand 30 complete torsions in 100 diameters. The weight of the rope is 2.45lb. per foot. The total length of the rope in use is 33,000 feet, and it weighs over 40 tons. Three 1¼in. ropes have been worn out since this size rope was first used in 1924. A 1¼in. rope is capable of hauling about 400,000 tons and lasts about 12 months.

When the haulage system is running up to capacity — about 175 cars per hour — and with rope fully loaded to the 17th level, the number of cars on the rope is 156. The tension an the rope due to this load and to the weight of the rope is 74,400 pounds. The weight of the rope and its friction is responsible for nearly 20 per cent. of the total rope tension.

In this short paper the writer has not attempted to offer anything new, but to describe in a very general way one of the large installations of the endless-rope system, and to draw attention to the factors which tend to limit the application of this type of haulage, in hope that a full discussion of this important branch of the industry may be provoked.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Stewart, J. D.    Assistant Chief Engineer  


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print