Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

26th January 1929, Page: 213, Column: 2

Proposed System Of Survey

In his paper on "Co-ordination of Mining Surveys with the Ordnance Survey," before the North Staffordshire Institute of Mining Engineers, Major D. A. Hutchinson says the system of survey which he would like to propose is on the following lines :—

(1) That colliery surveys should be based on a system of coordinates parallel to those of the local Ordnance Survey meridian. A local false origin would, of course, be used. The conversion of co-ordinates from the Ordnance Survey data would then be a simple matter of the addition or subtraction of a constant, the value of which would depend upon the position of the false origin.

(2) Instead of checking the collier survey by detail on traces or plans, all checks would be carried out by resection from Ordnance Survey trigonometrical marks.

Provided sufficient upstations were available, it would not be even necessary to carry out a triangulation for the colliery survey. Re-section gives extremely good answers, so that if the position of any particular point were required, it would be necessary only to send out an observer to take the requisite round of angles. Under these conditions, the expense of measuring a base and observing a chain of triangles would be done away with. It is for the chief mine surveyor to decide the most economical methods to employ. In all probability, they would be a combination of re-section and triangulation, depending, of course, upon the nature of the ground.

(3) Surface detail would no longer be used for checking. This might be added to the mining survey as required by a few measurements from fixed points and enlarging from the 1/2500 plans.

(4) Compass bearings would, of course, be referred to the grid North. A suitable method of doing this would be to compare compass bearings with the known grid bearing of two points on the colliery survey.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Hutchinson, D. A., Major      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print