Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

22nd September 1928, Page: 65, Column: 2

Preparing Coal For Market

In a discussion of practical operating problems of the coal mining industry in the August "Mining Congress Journal," H. D. Smith, assistant to the president of the Ashland Coal and Coke Company of Bluefield, W. Va., refers to the operation of its latest types of tipple and washery used at its mine. The purpose of installing the equipment was to better prepare different grades of coal from a sizing and cleaning standpoint. The combined sizing and cleaning plant is of steel and concrete construction and handles and cleans five sizes of coal. The coal is brought in mine cars in trips, averaging 40 cars, to the trip puller located in a steel constructed head house and shed and the cars are dumped at the rate of 350 tons per hour. The plant equipment keeps snow and ice from clogging the machinery and also protects the workmen from the elements. The coal after dumping flows into a hopper of 7 tons capacity under which a conveyor feeds the run of mine coal at the rate of 350 tons per hour into another conveyor 150 feet long which brings the coal down the hillside to a proper height for discharge to the main shaker screens. The main shaker screen is in two sections for balanced operation. The top section has two screening decks, the top section receiving 2½-inch size coal and the lower section receiving lump and egg sizes. The coal is washed in a concrete tank with circulating water. The company maintains a laboratory and makes daily tests to check the performance of the washer and the condition of the coal as shipped. "The results from the plant have been very satisfactory and have insured a product well prepared for the most exacting demands of the market," says Mr. Smith.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Smith, H. D.      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print