Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

14th July 1928, Page: 408, Column: 2

Monocable Aerial Ropeways

By E. C. Bowley.

[At the April meeting of the South African Institution of Engineers Mr. E. C. Bowley presented what was described as a somewhat novel paper on Monocable Aerial Ropeways, in which he described the installation on the property of the Lydenburg Platinum Areas at Maandagshoek. Below we reproduce from the Institution Journal some general remarks on this system of ropeway.]

Aerial ropeways are becoming more recognised as a profitable means of transportation, and their adoption has permitted the working of many mining and other propositions that would probably otherwise have remained undeveloped and unproductive. This is due to the economic and convenient application of this system of transport to mountainous country. Aerial ropeways may be mainly divided into two classes, viz. : (1) The bi-cable or two rope system. (2) The monocable or running endless rope system. The bi-cable system, although having a continuously moving rope for hauling the loads, is also provided with a separate rope for acting as a track or rail on which the loads travel.

The origin of the monocable ropeway is by no means new, being invented by C. Hodgson about the year 1868. Unlike the usual bi-cable and telpher ropeways, this system is characterised by having only one rope, which serves both to support and transmit the load. It can be applied with advantage where the material to be transported does not exceed 100 tons per hour, provided that the tonnage can be conveniently sub-divided into individual loads of not more than 30 cwts. This is due to the double duty the rope has to perform. It is inadvisable to have the gradient of the rope exceeding twenty degrees. This does not infer that this system is not applicable to hilly country. The profile of the cableway is never parallel to the contour of the ground, so that, provided the configuration of the country suits the arrangements of the spans between supports, the monocable can be adapted to very rugged and hilly districts. In cases of long ropeways, these can be built up of units, having a length of from four to ten miles maximum, so that a ropeway having a length of, say, twenty-four miles might possibly be built in three sections. The loads would pass through from one section to the other on shunt rails at the stations, which are built at the junctions of the sections.

The advantages of ropeways can be summarised briefly as follows : (1) The ropeway can be taken in a straight line from point to point and need not be diverted on account of any irregularities of the ground. (2) Embankments, cuttings, bridges and tunnels are unnecessary, and the installation may be speedily placed in operation when required. (3) The cost of a ropeway, over rough country, is much less than any other means of transport. (4) The unit, when in operation, does not require skilled labour. (5) The upkeep and maintenance charges are exceptionally low.

The monocable system of transport consists of an endless wire rope supported upon a series of pulleys mounted on suitable structures, such as towers or standards, located from three hundred feet to five hundred feet apart, according to the contour of the ground. The rope passes at one end around a drum or surge wheel, power being transmitted to this wheel through a series of gears, as practised in mechanical haulages. The tension wheel is usually at the other end, and is mounted on a travelling frame, which, in turn, is attached to a balance weight. The loads are carried in side-tipping buckets, suspended from the rope by means of a carrier, the design of which enables the bucket in transit to clear the supporting wheels. At each terminal a frame supporting a shunt rail is placed, which receives and supports the carrier of the bucket when disengaged from the rope.

The greatest possible care should be exercised in placing the profile of the hypothetical line of the cableway relative to the contour of the ground. A sudden rise in the fine of cableway is apt to cause trouble. The varying tension and deflection of the rope in operating the unit is considerable, and when there are no loads in the immediate vicinity preceding a sudden rise little deflection of the rope is caused, so much so that it may lift and rise above the supporting pulleys at this point, thus causing disengagement of the carriers of the oncoming buckets. The conditions of an installation vary so considerably that this problem would have to be left to the designer of a specific layout. The correct spacing and placing of supports or towers will generally assist in overcoming this difficulty. An unavoidable drop in the line will subject the affected supporting pulleys to additional stress. The wheels in this case should be compounded. Moreover, in determining the positions of the towers, endeavour must be made to take full advantage of their height by having a maximum clearance between the bucket and surface of the ground with a minimum tension on the rope. No definite ruling can be given as to the spacing of the towers; as previously mentioned, this varies with the configuration of the ground and the size of the unit installed. Accuracy in surveying and plotting the positions of supports cannot be too strongly emphasised. The direction of the cableway must be perfectly straight.

Similar to the usual procedure in preparing foundations, provision should be made for final alignment and grouting of the supports. For this reason the legs of the supports should have a means of travel of at least six inches when in foundation sockets.

When designing a tower it is advisable to spread the legs at the base, so that when a bucket is passing over the tower the total weight comes within and is distributed over the four legs. This gives a better distribution of the load over the foundations concerned. Where there is a scarcity of water and transportation is difficult, this is a factor of importance, as foundations can be reduced to a minimum with a broad base tower. The component parts of the tower are usually transported to and assembled at their respective positions. For convenience, the legs, stiffeners and cross-arm are usually bolted together. The bolt-holes of the cross-arm should be slotted so as to assist in the final alignment of supporting pulleys.

The mountings of the pulleys or sheaves are allowed to pivot on the cross-arm pin. By this means the pulleys are in balance ; the advantage of this is that it causes a compensating effect at the apex of support, and thus reduces the bending stresses on the rope. Moreover, the elevation of the pulleys varies with the position of the load as it passes by the tower, thus preventing disturbance of the saddle grips on the rope and at the same time increasing the clearance for the carrier in passing through the sheave. By this compensating arrangement, the pressure is evenly distributed over the bearings of the sheaves, shocks are diminished and the life of the wearing parts is increased.

The supporting pulleys or sheaves are made of cast steel and are light and rigidly constructed. The flanges of the sheaves are slightly dished, and, in the centre, there is a groove for receiving and guiding the rope, the depth of which engages about one-third of the rope diameter. This design of sheave enables the grip and carrier to pass freely when in position on the moving rope. Should the rope become displaced, it is so guided by these flanges as to resume its correct position in the groove or tread. The sheave wheel bearing is of the usual parallel roller type, the spindle of which has a central passage, and, by means of a grease gun, the lubricant is injected. This type of bearing has proved satisfactory, insomuch that of the four hundred that have been in daily operation for the past year only ten have been replaced.

The carrier consists of a cast steel mounting, to which is attached a set of small wheels for the purpose of moving the bucket on the shunt rails at the terminals. Centrally placed in the mounting there is a triangular-shaped slot, which receives and permits the hanger-arm to pivot. This enables the bucket, in travel, to be horizontally as the carrier varies its inclination with the elevation of the rope. The stems of the saddle grips are inserted in the mounting at two points central to the hanger-arm, sufficient play being provided to enable the grip to take a true and aligned position on the rope.

Upon the success of the saddle grip depends the economic and efficient running of this unit. The grip should be simple in construction, certain in action and designed to produce as little wear as possible. Transporting loads on gradients exceeding one in four with a, saddle grip that does not require external assistance in effecting a hold on the rope is still an engineering problem.

The rope forms a very, it not the most, important part of the monocable, in view of the heavy duties it has to perform, being both the chief wearing part and the most costly to renew. The behaviour of such parts as might detrimentally affect the life of the rope should, therefore, be carefully and regularly observed. A few general observations upon the class of rope most suitable for this purpose may prove of interest. Lang's lay 6/7 flattened strand has proved most serviceable. The compound, applied to the rope during construction, is sufficient to lubricate and prevent internal corrosion of the rope for a period of at least two years. In tropical climates, where the rope is exposed to the heat of the sun, a portion of the lubricating compound leaves the heart and overcoats the surface of the rope. The lubricant in this state is a source of danger, as it may cause the slipping of the saddle grip when surmounting a gradient. When ordering a rope for a specific layout subjected to these tropical conditions, this point should be emphasised for the purpose of obtaining a compound, the constituents of which are not readily affected by the heat of the sun. As few splices as possible should be made. This is usually governed by transporting facilities available for heavy material, and the method adopted in drawing the rope over the line of cableway. Moreover, when splicing, as the tucking-in of the strands replaces the hemp core, the resilience of the surrounding strands is so affected as to cause the surface of the wires to wear sooner over the area of splice. The stretch of a new rope over a length of seven miles is considerable, as in the case of the unit in question. To avoid constantly cutting and resplicing at the early period of operations, due to the stretch in a new rope, the tension frame should have a means of travel of at least 1/200 part of the length of the cableway.

Although the minimum tension on the rope is governed by the balance weight, the tension so caused is not uniform, but changes at varying points relative to the driving unit and with the elevation of the supports. The travelling buckets themselves alter the tension on the rope, by varying the amount of sag between spans, and thus take up the minor changes in the tension due to the elongation or contraction. From these and other causes the sag in the rope may become of such magnitude as to require adjustment of the tension balance. As a useful adjunct on ropeways of two or more miles in length, a sag indicator, fastened to one or more buckets on the circuit, gives timely warning of the necessity to attend to adjustment of the rope tension. It may be thought that the balance weight would automatically adjust the differences in tension, but in practice it is found this is not so, as, owing to friction at the supports and in the system generally, the energy required to overcome this and maintain the desired tension on the rope is not sufficiently supplied by the balance weight at the terminal. Although the balance weight is insufficiently sensitive to respond to the minor changes in tension, it acts as a safeguard against undue stresses being placed on the rope.

The surge wheel for driving the unit is usually placed at the extreme end of the unloading terminal, and, by supporting the rope in suspension, the required tension is obtained, so enabling this wheel to transmit the motive power with two full turns of the rope and avoid slip. The gears for driving the surge wheel are arranged within the supporting structure, and these are, in turn, belt driven from the power unit.

An economical rope speed has proved to be 3¼ miles per hour. The carrying capacity of the line can be increased by simply placing a larger number of buckets in circuit. Increasing the speed of the rope means additional friction, the amount of which is considerably greater than that caused by installing more buckets.

There is a light steel structure at each station, on which the shunt rails are mounted. Attached to this structure is a series of pulleys for guiding the rope into position, so as to effect a transfer of the carrier to and from the shunt rail.

At the point at which the transfer of the carriers is made, i.e., from shunt rails to rope and vice versa, the gauge between rail and rope should be identical to the gauge of the small wheels and saddle grips attached to the carrier. This is important, as a difference of a quarter of an inch is likely to cause misengagements and detachments of the carrier. The shunt rail also should be adjustable at this point, as the gauge gradually changes owing to the supporting pulleys of the rope attached to the structure becoming worn. Moreover, this rail should be set at an angle slightly less than that of the rope. This permits a safe and correct transfer of the carrier from the rope to the rail, and eliminates shocks that would otherwise be caused to the carrier. In transferring the carrier from the shunt rail to the rope, a flying start is given to the load. To assist this operation, the rail at this side of the terminal should have a slight downgrade.

In long ropeways the starting torque is considerable, and provision for this should be made when deciding the class of driving unit to use. To facilitate constructional and working operations, it is advisable to have a means of communication between the stations. A telephonic installation is preferable to any system of signalling, as it is of general utility apart from that of the ropeway.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Bowley, E. C.    Mining Engineer  
Hodgson, C.      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print