|
14th July 1928, Page: 407, Column: 1 Steel Arches On RoadwaysContributing to the discussion of Mr. D. C. Gemmell's paper on "Supporting Underground Roadways with Steel Arches" before the Mining Institute of Scotland, Mr. J. B. Drinnan, of the Wigan Coal and Iron Company, wrote that he was greatly interested in the Paper, which described a method that appeared to offer great possibilities. At Clock Face they had been using steel arches extensively for some time, principally in tunnels and associated with concrete for structures of a permanent nature, i.e., pit bottoms, air-crossings, and motor houses. Recently, however, they had applied the use of steel-work to the securing of main roads at the working face. Instead of using the full arch with its legs resting on the pavement, half arches were used with the ends notched into the sides of the roadway, about 3 feet above the packs. These arches were set 3 feet apart, well wedged up and covered over with timber. After subsidence had taken place, during which the arch subsided regularly, they got a roadway 8-foot high in the crown of the arch. This method had replaced the common one in Lancashire of double cockering. In this case first cost actually favoured steel-work, for whereas cockering cost 17s. 6d. per yard for timber, the cost of a half-arch with covering timber was only 15s. 6d. The arches used were bent to a 7-foot radius, with a span of 11 feet 6 inches, and had a section approximately 4-inch X 2-inch, weighing 34 lb. per yard.
|
|||||||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||