Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

2nd June 1928, Page: 360, Column: 1

Coal For Power Station

In a paper by Mr. W. Grant Mackenzie on the Pretoria Power Station read before the Students' section of the South African Institution of Engineers, reference is made to the coal and ash handling, the Author remarking that from the time the coal leaves the colliery until it is reduced to ashes at the power station, there is no man-handling whatever. The coal is brought in from the main line to Roberts Heights on to the power station siding and is tipped direct into a reinforced concrete coal hopper, from which it travels on a 20in. belt conveyor at about 150 feet per minute to the boiler house. From here it is tipped into a vertical elevator capable of raising 25,000 pounds of coal per hour, and hoisted some fifty feet to an overhead flight conveyor arranged so that the coal may be dumped at various points along the whole length of the bunkers, whence the coal is fed by chutes, releasing 730 pounds of coal per pull, down to the fire grates and carried by mechanical stokers into the furnaces. From here the ashes drop into other chutes and thence into cocopans which are in waiting on ground level. These have a capacity of 15 cubic feet, are of the side-tipping type, and are designed to advance in tipping, thus throwing the contents clear of the rails. The cocopans are pushed out on a light rail, the contents being used for filling up depressions in the vicinity of the station for some time to come, but eventually will be tipped direct into the coal trucks and carried away entirely out of sight. Two capstans at the north and south ends of the siding facilitate the moving of the coal trucks when no railway engine is present. These capstans have a rope speed of 60 feet per minute and are capable of exerting a steady pull of 5,000 pounds from the bollard.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Mackenzie, W. Grant      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print