Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

27th August 1927, Page: 33, Column: 1

Air Lift Pumping

E. J. Gealy describes (Coal Age) unusual methods employed to reopen the Neilson mine of the Shamokin Coal Co., in the city of Shamokin, Pa. For many years the property has been idle and the water had risen in the shaft to within about 30 feet of the ground level. The officials of the company decided that the best way to start unwatering the mine was by means of an air lift pumping system. On November 9th, 1924, one air lift was started. It consisted of a 190 ft. column line of 10 in. wrought iron pipe supported in the old mine shaft. This length of pipe was considered sufficiently long to obtain satisfactory submergence, although the shaft was 1,200 ft. deep and the vertical depth of the water was greater than this because of the basins in the steeply pitching beds. In December another similar air lift was installed in the shaft and the two lifts were kept in operation as much of the time as possible. The air lifts were stopped only when it became necessary to add extra lengths of pipes to maintain sufficient submergence to obtain satisfactory results. In the air compressor house two large compressors driven by 2,300 volt synchronous motors supplied the air. Suitable control valves were placed in the air lines so that the quantity of air could be regulated or stopped whenever it was necessary.

Several novel features were incorporated in the design and operation of the lifts by B. C. Osier, superintendent of the mine. The foot piece was constructed out of a straight 5 ft. section of 10 in. pipe drilled full of ¼ in. holes except near each end. Around the perforated part of the pipe a short section of 12 in. pipe was welded in such a manner as to form a jacket or chamber. At diametrically opposite points in this outer pipe connections were made to the air line. An additional part of the foot piece was a 3 in. bronze nozzle also connected to the 1 in. air line. Thus the construction of the foot piece was such that a large volume of air broken up into many fine streams had easy access into the eduction pipe.

The air lift discharge lines were made of three different size pipes. When the air lifts were stopped from pumping directly to the outside surface they consisted of a lower section of 10 in. pipe 200 ft. long to which was attached another 200 ft. section of 11 in. pipe and at the top was still another section of 12 in. pipe about 240 ft. long. To accomplish adjustments to depth all extra sections of pipe were added to the top and the whole eduction pipe was suspended on 7/8 in. steel hoisting cables. For support at the top of the shaft, two rope clamps 10 in. long were attached to each rope and the weight of the pipes was supported on a yoke or cross member which in turn rested on heavy beams. Each rope extended over the head frame on to a reel from which it was unrolled as required.

During the period between November 9th, 1924, and February 10th, 1925, one or the other or both of the air lifts were in almost continuous operation. On February 10th, when the lifts were stopped from pumping to the outside surface, the eduction pipes were 640 ft. long and the water had been lowered about 475 ft. This indicates that the water level dropped at the rate of about 4½ ft. every 24 hours. It has also been estimated that during part of the time 5,000 gallons per minute was pumped and a total of about 335,000,000 gallons was raised to the surface. Best results were obtained when the submergence was about 200 ft. and the lift about 100 ft. Averaged over the whole range of operation, the cost of raising the water was slightly over 6.5 c. per 1,000 gallons.

Since February 19th two 1,000 gallons per minute pumps have been set up in the No. 12 level and the air lift discharges to these units which in turn relay the water to the surface. In time, two more centrifugal pumps will be installed and the water relayed to them by the air lift. In this manner it is intended to carry the unwatering plan until the air lift system will be impracticable for further use here.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Gealy, E. J.      
Osier, B. C.      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print