27th August 1927, Page: 37, Column: 1 Examination QuestionsExamination for Surveyors' Certificates*1. Make a diagrammatic drawing showing the azimuth circle of the trough compass of a theodolite, and of the circle from which the vernier readings are taken, in relation to each other. Show three ten-degree divisions on each side of the zero point in each case, and figure them. Explain shortly the relation of the graduation of the two circles. (12) 2. You are directed to prepare a plan on a large scale of the site of an accident caused by a fall near the face of a road in a longwall working. Write out imaginary field notes for such a plan to show your method of booking, and the points you would note in such a case. Make a plan according to your notes on a scale of 1/120. (8) 3. Draw a section on the line AB on the accompanying plan No. 1, taken from a geological survey map. The distance between seam No. 1 and No. 2 is twelve fathoms, and the same between No. 1 and No. 3. Assume a uniform thickness of 20 ft. of alluvial cover over the rock head. The section is to be as complete as the information shown on the plan allows. Plot to double the scale of the plan. (12) 4. A main haulage road running N25°E is to he turned, on a curve of 150 feet radius to a bearing due East. State clearly how you would lay off and continue the curve and the directions you would give the workmen. (8) 5. You are directed to measure the area of the enclosure on plan No. 2 without going inside the enclosure. Transfer the plan to your answer book and mark thereon the measurements you would take as you would enter them in your field note book. Calculate the area directly from these notes. (8) 6. The co-ordinates of two points A and B in links are respectively N1 165, W74 ; and N712, E115. The level of A is 510.5 and of B 362.3. A short theodolite traverse is made from B of which the azimuth bearings, and distances in links, are as follows :—
Calculate the level of C, the quadrant bearing of CA, and the inclined length of a drift from A to C. measuring from floor to floor. What checks would you make in such a case underground, and in the office ? Assume the graduation to be clockwise. (12) 7. The azimuth of a heading in a coal seam is 110° 30' and its inclination 5°15'. If the azimuth of the strike line is 40°35'. calculate the rate of full dip, and the quadrant bearing of full dip. Explain the graduation of the instrument relatively to your answer. (8) 8. In making a "fast needle" traverse with an ordinary miner's dial, what line is in a constant direction, if the azimuth circle moves with the sights; and what line occupies a similar position in the case of an instrument in which the vernier moves with sights? What is the relation between the graduation of the instrument and of the protractor used in plotting in the two cases respectively ? (5) 9. If you require to fill in the details between two points fixed by an underground theodolite traverse with a loose needle dial over rails, how would you eliminate the effect of the attraction by the rails? Illustrate your answer by giving imaginary readings at six stations and work out the correct bearing of each line. (8) 10. Calculate the excavation in cubic yards for a pond the bottom area of which is 75 feet by 60 feet, and the angle of the slopes one vertical to two horizontal. The original surface is level. The depth of the pond is 10½ feet. Calculation by methods that give approximate results will not be accepted. (12) 11. You have to prepare a plan to show the workings of a colliery established on a leasehold of 2,000 acres. The greatest width required is five feet six inches. State shortly (a) the kind of paper you would select and your reasons for your choice; (b) how you would have the plan mounted; (c) the arrangements you would make for the storage of plans and paper; (d) how you would lay down your surveys; and (e) the provision you would make for checking shrinkage. (8) 12. The following notes were taken at the beginning of a survey by tacheometer. The level of station I is 875.6 and the azimuth of the line I., II is 265°41'. Take station I as the point of origin and calculate the co-ordinates and level of station IV. The multiplying factor of the tacheometer is 100 and the additive constant 1.3 feet.
(12) * Questions set at Examinations in May, 1927. The figures in brackets against each question indicate the maximum number of marks obtainable. The plans and sketches have not been reproduced. Price of official copy of questions obtainable through H.M. Stationery Office, 1s 9d. net. [For 1st Class questions see p. 26, No, 2, Vol. 38.]
|
|||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||