Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

2nd July 1927, Page: 387, Column: 1

Automatic Control Devices

Some of the appliances in use at the Valier mine of the Valier Coal Co., located in Southern Illinois, are described in Coal Age by Mr. A. F. Brosky. One example is a power-saving arrangement Which governs the manipulation of the main hoist while the plant is being operated at 75 per cent. of its capacity. Valier is a shaft mine working the No. 6 Illinois bed. The coal is hoisted in skips, and the workings are equipped to produce 8,000 tons in eight hours. At one time this mine held the world's record for production from a single shaft.

Power is furnished to this mine on a contract, by which a primary charge is made on a 5 minutes maximum demand and a secondary charge rendered on actual consumption of energy. With the mine operating at only 75 per cent. of its capacity, a 15-minute period of grace in each hour allows an adjustment in the speed of hoisting which limits the load on the entire plant to a fixed maximum. The main hoist is controlled so as to act like a balancer or flywheel to limit the over-all load on the plant. This has been accomplished by installing on the hoist platform, a demand meter and a 5-mlnute clock, both of which are synchronised with the clock of the power company. They are placed in front of the operative, who, by watching their indications, can regulate the hoisting cycles in such a way as to attain the desired end.

The main shaft is 600 feet deep, and each skip has a capacity of 15 tons. The hoist is driven by a 1,350 h.p. direct-current motor drawing energy from a flywheel motor generator set which forms part of an Ilgner system of Ward-Leonard control. This latter machine is itself semi-automatically governed. When necessary, the hoisting load is decreased or eliminated entirely by slowing up or stopping the hoist so as to maintain the total plant load at or below the pre-determined maximum, which happens to be 2,300 k.w. The running load of the hoist is about 1,100 k.w.

In order to ensure measurements of the same time-interval on both the demand meter of the coal company and that of the public utility furnishing current, the latter was requested to replace its spring-driven clock with one that is actuated by a synchronous motor. This was done, the clock of the power company being now placed in a common circuit with the demand meter and timer installed by the coal company. A light circuit from the clock of the power company flashes a lamp on the hoist platform at the end of each 5-minute period. The coal company's demand indicator and timer are synchronised with the clock of the power company by the throwing of a switch upon the flash of this lamp.

The demand indicator in conjunction with the clock on the hoist platform shows the hoistman what the overall demand of the plant is at all times. A circle with a radius equivalent to 2,000 k.w. of demand is described on the graphic chart of the meter. A leeway of 300 k.w. thereby is allowed when the pen reaches this circle. The operative so regulates the speed of hoisting that the total consumption at the end of each 5-minute period, indicated by the timer, never exceeds the 2,300 k.w. of pre-determined maximum plant demand.

These instruments were installed at the beginning of the present year at a total cost of about 200 dollars. They have cut down the maximum demand by 400 k.w., and have effected a saving in power at the rate of 2,500 dollars per year.

Another saving, in this case in labour, is being effected through the installation of a dually-controlled isolated pumping station that delivers water from a reservoir to the plant. A water-treating installation is operated in conjunction with this pumping equipment. Should the automatic feature fail, the whole system can be operated through manual control. At the mine substation, power is stepped down from 33,000 to 2,300 volts and enters the building through a three-pole, fused, entrance switch. Thence it is conducted to an eight-pole, double-throw switch, on one side of which, but located at the pumping station, is an automatic starter. This energises a 20 h.p. induction motor driving a triplex plunger pump of 300 g.p.m. capacity. The control circuit of the automatic starter is operated by the combination of a water-pressure gauge with an electrical relay, this latter being likewise installed at the pump station. Coupled with the last-mentioned equipment is a balancing tank that dampens the effect of pressure surges upon the gauge. The relay and gauge act jointly to operate the starter when the back pressure in the water-line reaches either an upper or a lower limit. In case the automatic-control features should fail, the eight-pole switch can be thrown to a manual-control circuit containing a three-pole contactor with reclosing overload relays. The pumping equipment can then be manually operated.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Brosky, A. F.      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print