Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

12th February 1927, Page: 233, Column: 1

Examination Questions

Surveyors.*

FIRST PAPER.

1. The lines marking the upper and lower sides of a fault on the plan of the workings in a coal seam are not parallel, but are 50 feet apart at one point and 80 feet apart at another point 100 yards further to the dip. How do you explain this divergence Assume that the fault is a down-throw to east, that the higher side bears due north and south, and that the hade is 35 degrees to the vertical. Draw first a plan showing two levels 100 yards apart, and the fault and afterwards a section across the fault starting at the fault on the lower level and running N 30 degrees E. Show the seam on the section for a distance 200 feet on each side of the fault. The dip on the west side of the fault is 1 in 3 due south. Plot to a scale of 1/1200. (12)

2. Take a length of 3 inches from your scale, or foot rule, and divide it into lengths of an inch. Construct a vernier scale by means of which a reading of 1/100 inch can be taken. Show the vernier scale reading 2.57 inches. The division must be done geometrically, not taken from a scale. (8)

3. Make a free-hand sketch, as nearly as you can one-twelfth full size, of the plan and elevation of a pipe 6 feet long, 12 inches internal diameter, 15 inches external diameter, and 21 inches diameter over flanges. Make the elevation on a plane at 45 degrees to the axis of the pipe. (8)

4. Reduce the following field notes of a levelling and plot a section to a scale of 1/600 for horizontals and 1/120 for verticals. Figure the section properly to show the depth of filling or cutting at each 50 feet, making a uniform gradient from A to B. The formation level at each station to be calculated, not measured from the section.

5. The Royalty in a certain leasehold is based on area and thickness. How would you measure the thickness of a seam of irregular dip, and steep at parts, in order to calculate the royalty? If the area worked as determined by your survey and measurement be 12.375 acres, and the thickness 68.4 inches, what is the amount of the royalty at £45 15s. per acre per foot thick? Calculate the equivalent royalty rate per ton, allowing 7½ per cent. free for colliery use. Sp. gr. 1.26. (8)

SECOND PAPER.

1. Compulsory Question. — The following survey was made with a theodolite reading clockwise, for the purpose of putting down a borehole from a roadway in a seam to a drift passing underneath it :—

The instrument was set at 360 degrees for each back sight, and the distances were measured on the slope. Calculate where the borehole must be set away, where it will strike the drift, and the depth of the borehole from floor to floor. (12)

2. Compulsory Question. — Two rectangular shafts, each 24 feet by 7 feet and 50 yards apart, are in existence on a colliery lease- hold. No. 1 is sunk 150 fm. and No. 2 is sunk to a lower seam at 170 fm. No 1 shaft is to be connected with the lower seam by piercing up from the lower seam directly under it. There is a direct road in the lower seam between No. 2 pit and the approximate position of No. 1 pit. A survey between the shafts in the upper seam involves a traverse of 400 yards. A survey can be made from No. 1 pit in the upper seam to No. 2 pit in the lower seam by a fair road, half a mile in length, partly on an inclination of 1 in 4. Which of the several possible methods, including the use of the magnetic needle, would you adopt ? State your reasons for the method you prefer and the procedure in carrying it out. Brevity with completeness will enhance the value of an answer. (12)

3. A straight part of a proposed colliery siding makes an angle of 30 degrees, with a straight stretch of single line railway with which it is to connect. Calculate the length of a 20 chain radius curve to make the connection in each of the alternative directions in which the connection may be made. (8)

4. The plan of the workings in a seam dipping S 30 degrees. E 1 in 3 shows a fault down to NW bearing N 45 degrees E. Calculate the true bearing of the fault. Assume hade of 30 degrees to vertical. (8)

5. With plan. — The accompanying plan shows spot levels on the surface overlying rock about to be quarried. Calculate the quantity of overburden to be removed from the area ABCDE. Level of rockhead, 30.0. (8)

6. What is the length of Gunter's chain, and why was that length adopted and subdivided in links? What are the practical advantages and disadvantages of an ordinary chain compared with a steel band? (8)

7. The following short traverse was made with a theodolite reading clockwise. The instrument was set at zero on the meridian to begin with. Find by calculation the bearing of the line DA and the area of the closed figure :—

(12)


* Questions set at Examination in November, 1926. The figures in brackets against each, question indicate the maximum number of marks obtainable. The plans and sketches have not been reproduced. Complete sets of Questions available through H.M. Stationery Office, 1s. 3d. net.


Related Articles

Pub.
Date
Article (Newspaper)
11 Sep 1926  News (The Science and Art of Mining)
12 Feb 1927  Examination Questions, Surveyors.* (The Science and Art of Mining)
26 Feb 1927  Examination Results (The Science and Art of Mining)
26 Feb 1927  Examination Questions, Second Class or Under-managers.* (The Science and Art of Mining)
12 Mar 1927  Notes On Surveyors' Examination (The Science and Art of Mining)
26 Mar 1927  Examination Questions, First Class or Colliery Managers.* (The Science and Art of Mining)
18 Jun 1927  November (1926) Examinations, Notes on Candidates' Answers (The Science and Art of Mining)
02 Jul 1927  November (1926) Examinations* (The Science and Art of Mining)

 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print