5th June 1926, Page: 372, Column: 1
Best Answers Received to Questions in No. 20, Vol. XXXVI
First Class or Colliery Managers
Rescue Team Practice
Q. 6. — A trained rescue team visits your colliery for the purpose
of an underground practice. Set out a detailed programme of
the work which should be included in such a practice.
A. — The programme of work which should be arranged for a
trained rescue team at an underground practice should approach,
as nearly as practicable, the work which would be required of
them in the event of an explosion underground.
When an explosion occurs at a mine, trained rescue teams work
in relays to make passages into the various parts of the mine by
the main roads, etc., and this entails clearing away debris, forming
packs, erecting roof supports, brattice timber and brattice cloth,
building stoppings, and removing bodies of the victims of the
occurrence. Therefore, when a trained rescue team visits a mine
for an underground practice, a place should be selected at a convenient
distance in-bye where the team could practice the work
mentioned. The object of the place being in-bye a distance is
to provide an opportunity for the team to walk in underground
roads wearing breathing apparatus, and this should not be too
far in-bye as the practice only extends over a period of two hours,
and ample time should be allowed for travelling out-bye and for
a suitable length of time to be devoted to timbering, bratticing, etc.
A form of practice which is often carried out consists of carrying
pieces of stone along a disused gateroad for a distance of from
10 to 20 yards, forming packs at this point and then stopping off
the roadway, using fairly large pieces of stone to do so. The
stopping having been completed, is examined by the captain or
someone accompanying the team. Very often an official of the
mine accompanies the team, and after the completion of any
work, examines it, pointing out and explaining defective parts
of the work, or difficult points and the proper manner in which
it should be carried out.
The team then practices different methods of roof support.
Timber of suitable length is obtained and "pairs of gears" erected,
care being exercised to show the teamsmen the correct method
to be followed when timbering, especially if the seam lies at an
inclination. Brattice timber is erected, and brattice cloth attached
to it.
If convenient, the rescue team should be taken along a length
of the coal face, passing along narrow, low places and erecting
face timbering. Stretcher practice, if convenient, may be carried
out in the vicinity of the face.
The work undertaken should be carried out so that each rescue
teamsman gets an equal share of the work and practice in the
several departments of the programme, and care taken not to
work too hard so that the weakest member of the team is able
to carry out a good practice without risk of becoming uncomfortable
in the breathing apparatus, as it must be remembered a rescue
team is only as strong as its weakest member.
The programme may be set out as follows :—
| | Details | Time |
| (1) | Walking in-bye to selected spot | 15 | minutes |
| (2) | Rest | 5 | minutes |
| (3) | Forming packs and building stopping | 15 | minutes |
| (4) | Rest | 5 | minutes |
| (5) | Erection of "pairs of gears," brattice timber and brattice cloth | 15 | minutes |
| (6) | Rest | 5 | minutes |
| (7) | Crawling along face and erecting face timber | 15 | minutes |
| (8) | Rest | 5 | minutes |
| (9) | Stretcher practice | 15 | minutes |
| (10) | Rest | 5 | minutes |
| (11) | Walking out-bye to shaft | 20 | minutes |
| | Total time | 2 | hours |
Arthur Fletcher, 13, Carlisle Terrace, West Allotment, Shiremoor,
Northumberland.
 |
 |
|
Names mentioned in this article
|
 |
 |
| Name | Age | Occupation | Notes |
| Fletcher, Arthur | | | |