|
6th December 1925, Page: 149, Column: 2 NewsWhen H.M. Electrical Inspector of Mines, Mr. J. A. B. Horsley, appeared before a meeting of the North of England Branch of the Association of Mining Electrical Engineers at Newcastle-on-Tyne, recently, he said it was desirable to limit the number of sizes and types of motors and switchgear and cables so that it would be possible to keep an adequate stock of spare parts without the necessity for a large warehouse in which to store them. Variety of design was valuable in the engineering laboratory of an educational institution, but it was only a nuisance in a colliery. The author also discussed the questions of inter-changeability, provision for extensions, facilities for routine testing and continuity of service. Maintenance must be systematically carried out, and that was only possible if the maintenance staff was adequate, painstaking and sufficiently supervised. To anticipate defects, testing and gauging were essential, and tests of insulation and of conductivity were easily made if suitable instruments were available.
|
|||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||