29th August 1925, Page: 37, Column: 1 Examination QuestionsExamination for Surveyors' Certificates.*1. The accompanying plan, taken from a Geological Survey Map 6in. to a mile scale, shows spot levels on surface, outcrops, and a general section showing the relative positions of the several seams the outcrops of which are shown. Draw a section along the line AB showing the surface contour and the coal and shale seams. Draw the section to the same scale as the plan. (12) 2. Draw, to a scale of ¼, a plan of a hollow rod 6in, square on the outside, and 3in, square inside, with its axis horizontal, and at an angle of 45° to the vertical plane, and with one of its diagonals vertical. Show a length of 12in. of the rod. Draw an elevation in proper projection from the plan. (10) 3. You are directed to lay off the centre line of a colliery branch railway starting from a straight part of a main line running north and south. The colliery is situated on the east side of the Main Line. The branch railway is to be straight past the colliery on a line running N.W. and S.E. 41° off the meridian, and pass through a point at the pit 48 chains from the point at which the straight produced would intersect the Main Line. What will he the length of the branch railway on the curve and on the straight, respectively? Describe, with a sketch and as shortly as you can, the method of laying off the branch line. (10) 4. A level road running due north strikes a fault of unknown displacement at A, bearing N.35°W., with a hade of 60° from the vertical. Two bores, C and D., have been put down beyond the fault in the line of the road 200ft. and 400ft. respectively from A. The level of A is 60, of C 280, and of D 300. The depth to the seam at C is 305ft., and at D 325ft. Find the throw of the fault, and the length of a drift starting from A dipping 1 in 6 to win the seam anew beyond the fault. (8) 5. The undernoted azimuth readings were taken with a dial, with vernier attachment, reading anti-clockwise. The graduated circle from which the readings were taken moved with the sights. The first sight was taken as a base line. At the fifth station the correct bearing of line No. 5 was found to be 261° 23'. Write out the correct quadrant bearing of each line. Line No. 1 0° 0' ,, ,, 2 96° 25' ,, ,, 3 177° 32' ,, ,, 4 231° 41' ,, ,, 5 336° 11' (8) 6. Compulsory Question. -- Undernoted are the bookings of a short underground survey from A to B. From A 62° 48' (N.E.) 218.3 links. 96° 18' 90 82° 18' 133.7 117° 33' 205.5 ,, C 77° 87' 322.4 92° 5' 93 129° 49' 200 ,, B It is proposed to drive a straight road between A and B, starting from each end, and at a point near C midway between A and B. Calculate the distance and direction to be driven from C to the midway starting point. State the bearings to be laid off for the new road from A, B, and C respectively. (14) 7. Compulsory Question. -- You are instructed to survey a haulage road, 60 chains in length, with a theodolite using the magnetic meridian as a base. The readings of the theodolite can be compared with magnetic needle at the beginning and end and at four intermediate points about equal distances apart. It is found that these readings vary within limits of 8 minutes when compared with the needle readings. Describe fully but concisely how you would do the work. Name the instruments used and enumerate the assistants required and the duties of each. State particularly how you would treat the differences in the observed readings of theodolite and needle. (10) 8. A and B are points 1,000 yards apart on the strike of a seam of coal at 98 feet above ordnance datum. At a point C 748 feet above O.D. the inclination from the horizontal to both A and B is 11° 20'. Calculate the lengths of A C and B C and the angles of the triangle A B C. (8) 9. Workings are approaching a boundary on which it is proposed to leave 20 links of coal unworked. The azimuth bearing of the boundary is 16° 24', and the co-ordinates of a point A on the boundary line are N. 8678, W. 1434. From a survey station in the mine workings, the co-ordinates of which are N. 7785, W. 342, the following survey has been made From survey station line 1 301° 50' -- 690 links. 2 328° 45' 519 ,, Calculate how far the roadway, 8ft. wide, has to be driven on the bearing of No. 2 line before being turned parallel to the boundary. (10) 10. The accompanying plan shows the plan of a heap of coal. The ground on which it lies is level and 10ft, above datum. The figures on the top of the heap are spot levels to the same datum. Calculate the contents of the heap in cubic yards. (10) 11. State the requirements of the Coal Mines Act, 1911, in relation to colliery plans. (8) 12. What practical advantages and disadvantages are involved in adopting (a) the Magnetic Meridian, and (b) a fixed base line, in surveying and mapping colliery workings. Why does the bisection of the horizontal angle found by observation of the sun at equal altitudes not give the geographical meridian quite accurately ? (8) * Questions set at Examinations in May, 1925. The figures in brackets each question indicate the maximum number of marks obtainable. The plans and sketches have not been reproduced. Price of official copy of questions, obtainable through H.M. Stationery Office, 2s. net.
|
|||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||