Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

30th August 1924, Page: 39, Column: 2

Compressed Air Plants

In a paper read at Glace Bay, Nova Scotia, Mr. James P. Cotter said that leaks are not the main cause of the loss of efficiency. The largest losses are the result of lack of proper engineering in laying out underground pipe lines, which, as a rule, are not of sufficient capacity to transmit compressed air to the various working places without a very large loss. At mines equipped with a compressor plant of 5,000 feet to 6,000 feet capacity, an 8-inch main air line is usually installed. Pipe of this size is too small, and will not carry the amount of air mentioned any distance efficiently, because there will be a loss of 2.46 pounds for every thousand feet. If the pipe-line is 5,000 feet long (a very common length in our mines) there will be a total loss of 12.30 pounds. If this particular pipe-line was 12 inches instead of 8 inches, the friction loss would be reduced to 0.30 pound per thousand feet, or 1.50 pounds for 5,000 feet. The main lines are not the worst. It is in the branch lines that the greatest loss occurs. It is not uncommon in a mine to find a headway, requiring from 1,000 to 1,200 cubic feet of air, piped with a 2-inch air line. The loss in such a case is very great-much over fifty per cent. A headway or section requiring that amount of air should have a pipe-line at least 5 inches in diameter. As much care should be given to the lay-out and installation of underground pipe-lines as is given to the installation of the compressor itself. It is possible to design and lay out an underground pipe system that will give a uniform velocity through the main line and branches, and get high efficiency. The result of such an installation would be a cheaper output, and contented officials and miners. A miner cannot possibly produce a maximum output when operating a machine where pressure is reduced from 80 to 40 pounds, as a result of an undersized pipe line.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Cotter, James P.      


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print