Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

20th March 1912

The North-East Coast

Aerial Ropeway

A scheme for improving the facilities for loading stone at Craster, Northumberland, where extensive whinstone quarries are situated about 200 yards from the harbour, has been sanctioned recently by the Board of Trade. In order to load it has been necessary for steamers to go alongside the north and south quays, and, owing to the shallow water at these berths, they have been limited in size to about 350 tons carrying capacity.

The new loading plant will consist of an aerial ropeway to transport the road stone from the quarries to the south pier-head, the point at which the water is deepened, and here it will be dropped into storage bins of about 1,000 tons capacity. These bins will be arranged in the form of three ellipical wells, the section of each being 16ft. by 10ft., and the depth 50ft. They will be constructed of vertical timber shuttering supported against the horizontal pressure of the stone by a large number of hoops of flat steel bar, each hoop being interlaced with structural timber extending from the top to the bottom of each well, and strongly braced to resist wind pressure. The bins will be mounted on a reinforced concreate bridge spanning the pier-head, and the level of the six discharging doors at the bottom of the bins will be 23 ft. above high water ordinary spring tides. From these doors the stone will gravitate along shoots into the holds of steamers alongside.

The new berth will accommodate steamers up to 1,000 tons capacity, and it is expected that, with the new plant, which will be ready for service in the course of the next few weeks, it will be possible to ship this quantity of stone within two hours.

The ropeway is being constructed by Messrs. J. M. Henderson and Co., of Aberdeen, and the storage bins have been designed by Mr. A. H. Clark, of Messrs. McLaren and Prowde (Limited), of Newcastle-on-Tyne, the lessees of Craster Whinstone Quarries.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Clark, A. H.      
Henderson, J. M.      
McLaren, —      
Prowde, —      



Links to Collieries/Mines mentioned in this article

 

Craster Quarry (Whinstone)  Craster Quarry (Whinstone)


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print