Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

24th March 1909

The North-East Coast

Electricity In Collieries

Darlington, Mar. 20.

The North Walbottle Coal Company (Limited), of Newcastle-on-Tyne, are now proceeding with an electrification scheme at the North Walbottle Colliery, near Newburn. The plant comprises one 250 k.w. Rateau exhaust steam mixed pressure turbine, directly coupled to a Brown-Boveri alternator (2,750 volts, 60 cycles, 3,600 r.p.m.), with extended shaft for the exciter. An accumulator is provided for collecting the exhaust steam from two winding engines, and an air compressor. A three-phase to two-phase lighting transformer is provided to take the place of the d.c. lighting plant installed, the transformer taking 2,750 volts and reducing to 250 volts. There is also an 80 b.h.p. Electrical Company's three-phase induction motor, controller, and Beaver and Darling's haulage gear with three sets of fleeting wheels, and Haywood and Bridge's friction clutches. There are three electrically driven pumps, of Messrs. Evans's manufacture, one lifting 300 gallons against 240ft. head, one 300 gallons against 200ft. head, and the third, which is a portable pump mounted so as to fit the tub gauge of 32in., will lift 50 gallons against a head of 50ft. Transformers are fitted to each pump motor, transforming from 2,750 to 440 volts. Mining pillars are provided for, with h.t. triple pole oil break switches to trip on two phases and voltmeter, whilst l.t. switches are also provided for with suitable starters. The cable will be suspended in the shaft with wooden clams and bolted to the shaft timbers, and the cables in the mine will be suspended on leather thongs carried through the return air-ways. The shaft cable will be large enough to carry 200 h.p. to the bottom shaft.

This equipment is being provided to the designs and requirements of Mr. G. H. Armstrong, of Chester-le-Street, and upon the results obtained in working depends the installation of an additional unit of 250 k.w. at the same colliery.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Armstrong, G. H.      



Links to Collieries/Mines mentioned in this article

 

North Walbottle Colliery  North Walbottle Colliery


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print