Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

1st July 1897

A Visit To Wellington Pit, Whitehaven

Through the courtesy of Mr. James Henry, the respected underground manager of this colliery, which is situated near the Sea Brows, Whitehaven, a visit was paid a short time ago to this pit, and the officials fully explained the working of the mine. Without doubt, like its neighbouring colliery, Croft Pit, owned by the same company, the colliery is a finely laid out concern, and underground the means by which the laden tubs are drawn to the shaft bottom, and the empties despatched into the mine, is a wonderful contrivance, the endless rope, running round wheels securely fastened at the shaft bottom, the rope coming down the shaft attached to the engine on the surface. This incline, and the working of the same, differs from that of Croft Pit (explained a short time ago). Of course, the distance to the far end of Wellington is much further than that of Croft, being somewhere about four miles, but the road in and out is somewhat easier to travel, the time taken each way by the men exceeding very little over an hour. With the exception of a short dip a short distance from the shaft, the road, which is about six feet high, is almost level. The distance from the surface to where the coals are drawn from is somewhere about 100 fathoms, but at the various districts where the coal are got, the depth is greatly increased, it being needless to say the best part of the mine being under the sea. There is telephonic communication from the surface all over the pit, which is very handy should any mishaps occur.

Ten men descend at a time in one cage, the cage having two flats, and there are about 80 coal-hewers employed on a shift, and three sets, or shifts of deputies, boys, putters, and other off-hand employees. Six men are employed in one working, two upon each shift, the first descending at five a.m., the second at 11.30 a.m., and the night shift at 5pm., the hours, taking the time to walk in and out, perhaps, being about 8½ from bank to bank. The hewers do not leave the face, as at the majority of the pits in the county, putters being employed and paid by the company instead of the men trailing their own.

Alighting at the shaft bottom it is seen that the laden tubs are place into the cage from the main road, the empties being taken round in another direction before they are despatched down the main incline. Like the laden tubs, the empties are fastened to clutch bogies, which are screwed to the rope, a bogie being at each end of a sett, a sett, by the way, comprising 15 or 16 tubs, and each tub holds about 15 cwts. By having a bogie at each end of a sett there is very little danger of the couplings of the tubs, &c., breaking.

Near the shaft bottom can also be seen the outlet to the "bear mouth," or the road out, which is used should there be any mishap in the shaft at any time. This road is about threequarters of a mile in length, and the horses, of which there are 48 in the pit (used for trailing the coals to the different sidings, from which sidings the laden tubs are fastened to the friction gear ropes, 36 being in one stable, and 12 in another) are brought in and out of the pit as the case might be. In many instances, at collieries in the county, the horses and ponies are let down the shafts, the smaller ponies in some instances being put into tubs, the larger ones being slung in a net to the bottom of the cages and lowered down in that way. The stables seemed to be in perfect order, and the horses well cared for, their being four attendants, one on the day shift, one on the second shift, and two on the night shift. After a horse or horses, as the case might be, have been taken down the road named to the pit bottom, they are taken a considerable distance towards the stables down what is called the horse road, which the men have the privilege of travelling. The men, however, prefer the incline, there being very little danger.

Leaving the shaft bottom you commence the journey down the incline, which has a double set of rails, the empties going down one road, the full tubs coming up in the opposite direction. This incline in many places is securely timbered, the work having been well done, and the timbering throughout the mine seemed to be a special feature, and there also seemed to be no scarcity of wood. In many places on the incline a travelling road by the side could be seen, and a sufficient quantity of dirt to fill a single tub could scarcely be seen. Very little noise is made by the rope, and the little wheels on rollers midway between the roads worked very satisfactorily. These seemed also to be well looked after by attendants or roller waymen, whose duty it is to look after these, oiling them as required, and looking after the telephone wires, and insulators. In several parts were also self-acting "greasers" for the tubs.

The first part of note you come to is the Bannock Band seam, and the Saltom district, both of which are now unworked, and then comes what is commonly called the Benk's Junction, where the friction gear is situated, and which, as stated before, is worked by the main haulage rope. The names of the districts worked are Benk's district, Barber's district, Drift district, and Barber's or Oscar's Dip, each being a good distance from the Junction. The Benk's Junction is the most particular part of the mine, being where the main haulage rope terminates, and where the coals drawn out of the various districts are knocked off the friction gear ropes, and again joined to the main haulage rope, and despatched to the shaft.

The friction gear comprises three wheels or drums, all of which are keyed to one shaft, round which the rope or ropes for the various districts are travelling, as the main incline rope runs. The largest wheel is eight feet in diameter, the next six feet, and the third four feet in diameter. Thus it will be seen how the speed is regulated. Should, however, any mishap occur in a district, this district rope can be taken off, work only being suspended in that particular district. Instead of clips, which are used at Croft Pit for the friction gear ropes, clutch bogies are used, the management considering the bogies a much safer and better plan than the clip system, besides being less expensive. Between fifty and sixty score of tubs (between seven and eight hundred tons) are drawn to bank, the time of drawing occupying thirteen or fourteen hours a day, a sufficient quantity of empties being in the pit to satisfy the night shift hewers, and start the pit in the mornings.

The largest percentage of coal drawn is without doubt round, and of good quality. This is easily accounted for, considering the height of the coal taken in being between ten and eleven feet high, above which is what is termed the bearing tops, two feet in thickness, which makes a good roof. The bottom portion of the seam is termed the "benk," perhaps three feet, next comes the spar coal, about eighteen inches, next the metal or dirt (which varies, the men being paid for this according to the thickness after it exceeds nine inches), followed by the undergrowth, and finally the top coal. The coal is laid in by the undergrowth, after which the metal is lifted, and the top next taken down, then the spar is lifted, and finally the benk is lifted. A sufficient quantity of benk and spar is always supposed to be left on, so as each shift can work the top off. Two men endeavour to fill about ten tubs, which is considered an equivalent to a fair day's pay.

It is needless to say that every precaution is taken to prevent any mishap in the way of explosions. The company provide the safety lamps, which are cleaned and looked after in the lamp cabin on the surface, and there are lock shops for the districts, the lamps being examined there before they are taken inbye past these stations.

The ventilation of the mine is also a special feature, air being conveyed to the bottom by a powerful fan engine, situated at Duke Pit, near bye on the surface, the mine being well ventilated. On the surface is also a powerful Cornish pumping engine, which not only pumps the feed of water made, but also the water from Croft Pit.

The surface arrangements are also complete. Besides the coal drawn from the pit, Croft Pit coals, which come down a brake into the pit yard (with the exception of the coals from Croft Pit which are despatched down the new brake on the Furness Railway) are here dealt with, the shipping arrangements on the South Harbour being up to the mark. Besides there is also a tram-line on to the dock, where a large shipping trade is done. There is also a splendid fitting shop in the pit yard, and nearly all the work is done by the company.

Mr. E. Gregory is the manager, Mr. James Henry, who has been connected with the colliery for 22 years, the underground manager, and there is also a large staff of experience deputies and shiftsmen (or joiners) connected with the mine, who acting from instructions from the management see to the rules, &c., being strictly carried out.

Newspaper transcript kindly provided by
West Cumbria Mines Research.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Gregory, Edward    Manager  Whos Who Page
Henry, James    Under Manager  Whos Who Page



Links to Collieries/Mines mentioned in this article

 

Wellington Colliery  Wellington Colliery
Whitehaven Colliery  Whitehaven Colliery


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print