Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

14th June 1894

The Starting Of A New Engine At Frizington

We have been furnished with the following additional particulars as to the starting of the new pumping-engine at Messrs. Ainsworth's pit, as described on page 3 :— Considerable interest had been aroused owing to the management having decided, contrary to local custom, to abolish stage pumping, and to force the water to the surface in one direct lift. The company then proceeded to the pumping engine-house, when Mr. AINSWORTH (who was accompanied by Mrs. Ainsworth and Mr. A. H. Meysey-Thompson, of Leeds) made a few remarks, thanking all present for their kindness in coming, and then requested Mrs. Ainsworth to open the steam-valve, which caused the enormous engine to start on its career of usefulness. When the engine had made a few strokes the water came to bank, amidst the deafining cheers of all present. Mrs. Ainsworth then broke a bottle of champagne on the cylinder and named the engine "Margaret." She then drank success to the new mines, and handed the glass to Mr. A. H. Meysey-Thompson, of, Hathorn, Davy, & Co., Leeds, who drank success to the engine. Mr. J. G. Howes, the Company's engineer and manager, then took the glass, and wished the Company every success with their new mine and pumping machinery. Mr. George Atha, of Leeds, who has had the superintendence of the erection of the pumps and engine, drank success to the machinery, and hoped the work he had done would prove a success. The pumping-engine being satisfactorily started, Mrs. Ainsworth accompanied by the manager (Mr. J. G. Howes), then proceeded to the winding engines, and starting them, drew the first two bogies of ore from the new pit amidst applause. After the mine had been started, and christned the "Margaret," the company proceeded to one of the workshops, which had been prepared for the occasion, where there was an unlimited supply of refreshments. — Mr. BAIRD, seconded by Mr. JENKINS, wished Mr. Ainsworth every success with the new mine, and all joined in drinking success to the mine. — Mr. ENTWISTLE proposed the health of Mrs. Ainsworth and children, which was heartily drunk by the whole company.- the pumping-engine and pump were made by Messrs. Hathorn, Davy, & Co., of Leeds and fitted with all the latest improvements. The pumping engine is tandem compound, with two cylinders, 34 and 58 inches diameter, with a stroke of 8 feet: valves being worked by Davy's patent compound differential gear, by which the speed of the engine can be regulated to pump any quality of water up to 800 gallons per minute. The bell cranks are made of malleable steel plates, with 12 feet centers, and are connected direct to the piston rods of the engine, and do not require to be counterbalanced. The spear rods, connecting the bell cranks to the pumps, are made of pitchpine logs 12 inches square and about 40 feet long, connected together by steel plates. The pumps, which are situated 820 feet below the surface, are two pairs of plungers, 13 inches in diameter, and force the water to the surface in one coloum 11 inches diameter. The steam is supplied to the engines by 20-feet boilers, working at a pressure of 100lb. per square inch, and were made by Messrs. Adamson, of Dunkinfield. The water before being put into the boiler passes through a Green's economizer of 120 tubes, which is placed in the flue between the boilers and the chimney, utilizing all the waste heat, and raising the temperature of water up to between 240 to 300 degrees Fahr. The mine has taken 3½ years to complete, and struck ore in sinking at depths of 540 feet, 696 feet, and 820 feet, of all which look like turning out very well. It will not be out of place to mention that Mr. George Wilkinson, of Messrs. Burnyeat, Dalzell, & Company, Whitehaven, made the first contract for ore with Mr. Ainsworth after the mine was opened. The following were amongst those present, in addition to those whose names appear elsewhere :— Mr. C. Cockbain, overman at the new pit; Mr. T. J. F. Marley, Workington; Mr. J. Morton, Montreal Mines.

Newspaper transcript kindly provided by
West Cumbria Mines Research.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Adamson, —      
Ainsworth, —    Mine Owner  
Atha, George      
Baird, —      
Entwistle, —      
Howes, J. G.    Engineer  
Jenkins, —      
Marley, T. J. F.      
Meysey-Thompson, A. H.      
Morton, J.      
Wilkinson, George      



Links to Collieries/Mines mentioned in this article

 

Winder (Iron Ore)  Winder (Iron Ore)


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print