14th April 1881
The West Cumberland Iron Trade, Mining Enterprise, and Railway Developments
The state of the local iron industry is such that at the chief iron manufactories in the district overstocking is the order of the day. Ore deliveries on that account have had lately to be considerably reduced for short periods. The diminished value of
iron ore and pig iron does not rise in accordance with the sanguine expectations of traders and others. In contrast to this, however, producers are keeping a firm hold of their materials, preferring rather to bank part of it than to effect a disposal at
what they consider poor prices. It is by this action that iron ore is kept from further retrogression in value. In contrast to this, one or two firms, and particularly the crossfeild Iron Ore Company, have nearly cleared cleared of the metal banks they
acquired in the course of the recent decline in the iron trade; and the clearance spoken of will probably be further enhanced shortly by the firm mentioned, together with the Carron Iron Company, going in for the introduction of the long-mooted siding to
the Carron Company's pits. An offshoot siding from this tramway to the Crossfield Company's Jacktrees pits would be hailed as a boon by the Crossfeild Company, who have the most primitive means of clearing away the body of ore drawn to surface since the
pits opening out. The Carron Company used much horsepower in the dispatch of their metal; but their large banks do not become much diminished. Although the iron trade of West Cumberland is not of the most reassuring character, the enterprise of iron
ore proprietors continues. The Frizington locality just now is improving. One important mining development is observable in the setting down of an engine by Messrs. Fletcher and Hodgetts for a newly sunk shaft near to Parkside cottages. In connection
with the Birks Mines endeavours are being made by boring to discover the whereabouts of fresh supplies of ore, and several other places are to be tired in succession. Over the railway from these mines the Dalmellington Company are conducting a search
for ore close to the Wath Brow and Frizington road, in what is a considerable acreage of untried ground ground. Beyond Frizington in contiguity to Winder, near the Parkside coal pit, the Diamond Boring Company are executing borings for ore with one of
their machines. Back towards Cleator Moor Lord Leconfeild has resorted again, to his original plan for a siding from St. John's Pit by making another survey from the passenger line; and the new pit near Crowgarth is being attached to the old pit's
railway hurries by a bogie way. The new mine itself is being fitted up with a fine new engine from Messrs. Stevens and Sons, of Airdrie, near Gillfoot Lodge, Egremont. The Carron Iron Company, Jacktrees, are testing their royalty to the utmost extent.
Three boring apparatus are in operation, one steam, and two hand machines. One of the latter has been started lately near in nearer proximity to the Catholic Chapel, Cleator, than hitherto. Not far from this spot in the large meadow belonging to Mr.
Ainsworth, the Cleator Moor Iron Ore Company are, and have been for some time carrying on boring operations. With respect to the Maryport Company's fresh royalty at Moor Row, not much ore is yet sent out of the pit nor have the company tested yet their
new mining ground for ore, but they are doing so in another royalty. The headgear belonging to the abandoned shaft, which the old Moor Row Mining Company used for a time, has been taken down for removal to the Gillfoot Park Mining Company's new mine, to
which railway approach has been made. Bordering on the Maryport Company's Gutterby Works is the Moss Bay Company's lately acquired Woodend royalty. The land there is now the scene of much activity owing to the course of renovation, which four of the
Messrs. Lindows' forsaken shafts are undergoing. At one of the shafts, a few dozen yards from the old smithy, an engine is placed ready for fixing. It is some 12 or 14 years since this pit was worked. Again, near to the Egremont and Bigrigg-road
railway bridge the Moss Bay Company have set lifting machinery almost ready for drawing metal from the mine, which is said to be the best of the four pits; in fact, old miners say there is plenty of ore in it, but that it cannot be got except at great
expence. When the pits are all opened out the metal is to be carted to the railway, through a tramway was first mooted. An iron-plated road is in the way of construction for a cartage purposes. Below Woodend the Ehen Valley branch line is completed so
far that the Messrs. Lindows and Messrs. Bain and Co.'s pits can be reached by rolling stock from the railway. At the former firm, Longlands works, the proprietors are again pursuing borings from the surface. It is well worthy of mention that the
Messrs. Lindow have, within the past few days, made another valuable discovery of ore at Egremont in the field known as Miller's Croft, behind Mr. Charter's brewery. The successful finds, which have there been made, would be fully warrant the Messrs.
Lindow opening out mines that locality. In communication with the pits between Egremont and Gutterby the railway doubling process is now terminated. Local obstructions are only now needed to be set aside to see its opening. In addition to this London
and Northwestern and Furness railway improvement, another important railway scheme is in fair progress though some hard work is yet to be achieved before it can be prounced entire. The construction referred to is Rowrah and Disington mineral branch of
the Cleator and Workington Railway from Kelton Fell. In the short distance from the Cleator line to Dub Beck the railway is finished, although in that small portion of line the railway runs under no less than five substantial stone bridges. Over Dub
Beck a very deep embankment is still taking many hundreds of tons of rubbish to fill up and make a necessary with; thousands upon fill up sands of tons of ballast have already been laid down. From the valley to the top of Weddicar Rigg some heavy
cuttings are made, but it is through the top of the latter place where one of the heaviest of railway formations in Cumberland is going on. For months past the contractors have been excavating through solid masses of rock many yards in length. Three
powerfull cranes are employed in the work, and about one half of the cutting is still to be accomplished. The line when completed will doubtless form a good aid to our local ironworks, but it will have entailed an enormous amount of expenditure in the
labour and money. It will be greatly to the credit of the contractors when the whole job is prounced complete.
Newspaper transcript kindly provided by
West Cumbria Mines Research.
 |
 |
|
Names mentioned in this article
|
 |
 |
| Name | Age | Occupation | Notes |
| Ainsworth, — | | Mine Owner | |
| Bain, — | | Mine Owner | |
| Charter, — | | Brewer | |
| Fletcher, — | | Mine Owner | |
| Hodgetts, — | | Mine Owner | |
| Leconfield, Lord | | Mine Owner | |
| Lindow, — | | Mine Owner | |
| Stevens, — | | Engine Maker | |