25th July 1878 Whitehaven Collieries(A paper read at a Society meeting) Mr. Liddell read the following paper:— Whitehaven Collieries have been worked for many years by the Earls of Lonsdale and their ancestors, the first workings having been commenced by them in the year 1644; and though a very large quantity of coal had been extracted, the supply yet available seems practically unlimited. The workings are at present being on almost entirely under the sea, and in one pit extend over three miles from the shaft. The strata fortunately dips seaward at a quicker gradient than the sea-bed, though there are a number of upthrow faults in that direction. There are three shafts now drawing coals, namely, Henry, Wellington, and Croft. The two former adjoin Whitehaven harbour on the north and south sides respectively; the latter is situated near the coast, about two miles south of the town, and was sunk in 1775. The principal seams of the district are the bannock band, the main band, and the six-quarter, the second being the most important. The sections and depths of these seams at Wellington Pit are as follows:—
The seams are worked in pillars 20 yards square, and when there is sufficient cover between the coal and the sea-bed, the pillars are afterwards split. At Henry Pit the main band and six quarters are at present working, and at Wellington and Croft Pits the main band only. The pits are ventilated by three 36 feet Guibal fans, each of which is provided with duplicate engines. Henry Pit main band is presently ventilated by a furnace, which will, however, shortly be dispensed with. In Henry Pit main band the coals were, until recently, brought to the shaft at great cost by horses. The main roads were driven water level in the seam, and the dip coal was led up steep crosscuts. To remedy this, the writer's predecessor, Mr. R. F. Martin, straightened the roads as much as possible by driving stone drifts, so as to enable him to use engine-power. There are now four small hauling-engines, worked by compressed air, from a compressor on the surface, and this has caused the removal of from 60 to 70 horses, besides allowing a much larger output. The compressing engine, which was built by Messrs Hawthorn, Davis, and Davey, is direct-acting, and is fitted with their differential gear. There is a water-jacket round the air-cylinder; besides which, water is injected inside the cylinder at each stroke, and this keeps the air quite cool. In Henry Pit six-quarter, the coals are hauled out by a small Fowler's steam-engine, with main and tail rope. At Wellington and Croft pits are two hauling engines, fixed on the surface, which draw the coals up steep inclines underground, the empty tubs taking the rope inbye. The greater portion of the water is carried out by clay drifts, and the remainder is pumped at Henry and Wellington pits. Henry pumping engine is an old atmospheric one, with open-topped cylinder, having a diameter of 70 inches, and eight feet stroke. At Wellington there is a beam pumping-engine, with 90 inch cylinder and 10 feet stroke, lately fitted with Davey's differential gear and separate condenser.
Newspaper transcript kindly provided by
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||