Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

21st October 1875

The Montreal Iron Mines

(From the Engineer)

The prominent position attained in the British iron trade during the last few years by the hematite of Cumberland and Lancashire has caused a considerable amount of attention to be directed towards these districts both by residents and outsiders, and explorations have been carried on in all directions. Sometimes these explorations have, unfortunately, been undertaken in a sort of haphazard way, without any regard whatever to geological considerations; so that, although a large number of enterprises have been brought to a successful issue, there have been, on the other hand, a great many failures. This, however, is only the natural consequence that might have been expected when adventurers refused to profit by the experience of those who have gone before, and who, in a great measure, have proved what strata are likely, and what are not likely, to contain ore. Some sanguine adventurers, indeed, seem to think it sufficient to fix upon a district, throw up a penny into the air, and put down a bore-hole wherever it may chance to alight. There needs, however, but a very cursory glance at the geological features of those mines that have been, and are now at work, to be convinced that there are certain well-defined features common to them all, which are not to be found everywhere, but which, when they do exist, are almost certain to be accompanied by a deposit of ore.

Perhaps the most fortunate of all those who have explored these districts is Mr. Stirling, the proprietor of the Montreal Mines, near Moor Row, West Cumberland, and about five miles from the old port of Whitehaven. They are surrounded by the royalties of the Cleator Iron Ore Company, the Moor Row Mining Company, and the Crossfield Iron Ore Company, and are intersected by the Whitehaven, Cleator, and Egremont Railway. Like most of the other mines in this district, they are situate on the area of the mountain limestone which extends in a band, about three quarters of a mile wide, from Egremont, through Bigrigg, Cleator Moor, and Rowrah. On the east of this limestone band the country, which is hilly, is occupied by the Skiddaw slates, the basic rocks of the district, and upon the upturned edges of which the limestone reposes. To the west of the limestone band are the coal measures, which are brought into contact with the limestone by means of a large fault, bearing nearly east and west. The limestone is in many places capped by the millstone grit, and it is between this latter group of rocks and the underlying limestone that many of the iron deposits in the limestone are found lying by the side of the large fault which brings the limestone and coal measures into contact. Among the deposits in the latter position is the one which constitutes the greater part of the Montreal Mines. Another set of deposits occurs in shallow basins in the limestone, covered only by the boulder drift, or, at most, with a very thin shell of rock. To that description belong the remainder of the deposits worked by the proprietor of the mine under notice.

The method of working at the Montreal Mines is partly shown by the drawings. When the shafts have been put down to a sufficient depth, a level is put out a few feet below the top of the ore, and when that level has been continued to a sufficient distance, say five or six fathoms — that is, supposing the foot of the shaft to be on ore — levels are put off on each side. From these other levels are put off in their turn; and so on, until the whole of the deposit at that height has been opened out by a sort of post and stay system of working. The size of the levels — or rather "workings," as they are called — is variable; they are sometimes 30 feet high, but as a general rule they are only about 12 feet square in section. The size of the pillars also vary very much, according to the nature of the ground. Sometimes they are very large, consisting almost entirely of rock; but where the ore is not interfered with, or mixed up with the limestone, they are from three to five, or even six, fathoms square.

While the first height of workings is being wrought out in the manner described above, a second height is commenced about five fathoms below the first, and carried on in much the same way. A third and fourth height may also be put out, if the size of the deposit renders such a course advisable, to be worked in the same manner; but by the time the fourth height has been thought of, it is probable that a great many of the pillars in the first height, and perhaps in the second also, have been taken away, and the roof allowed to fall in. Unless this abstraction of the pillars is accomplished in a very systematic manner, it is more than probable that a great many of them will become buried in the debris of the fallen roof, in which case drifts, timbered as they proceed, have to be driven through this fallen rubbish for the purpose of reaching the ore. If much ore is abstracted in this way a very large amount of timber is required, as the ground, when once thoroughly broken up, brings such an enormous weight on to the timber by which the drifts are kept open, that it very frequently requires to be repaired. So great, indeed, is this weight that, if the "head trees" are not smashed in two, the "legs" or upwrights are gradually driven overhead into the soil, if that should be of broken ground, which is often the case when two or more heights are being worked together by timbered drifts. As these timbered drifts are carried in all directions to hunt for buried pillars, the space originally occupied by the ore becomes in course of time, as the different heights are worked out, a sort of buried pine forest, the timber, put in originally to keep open the drifts through the broken ground, being mixed up with the debris of the fallen roof.

Very soon after the commencement of the process of "robbing," as the extrication of the pillars is called, the surface of the ground begins to subside. As the working out of the ore proceeds, the ground settles down more and more, following down to fill up the space left after the extraction of the ore, and at length ponds of water begin to collect here and there in the depression, buildings are thrown down by the dragging of the surface, and the shafts probably become closed before all the ore can be extracted, so that others have to be sunk. These are generally put down in the rock outside the deposit altogether, so that the working of the ore does not affect them, and consequently they stand good to the last.

The output of the Montreal Mines is now 250,000 tons per annum, which is the largest turn out of any mine in either the Whitehaven or Furness district. The area is about 1,000 acres, of which nearly half is ore-bearing ground. The total number of hands employed above and below ground varies from 1,000 to 1,200, figures which gave an idea of the importance of the enterprise. There are altogether twelve shafts, of which three are now in process of sinking, while the remaining nine are in active operation; the greatest depth at present attained is about 75 fathoms. In addition to the shafts there is an open working about an acre in extent, but the outcrop ore only is here being worked.

This has been partially worked away, and the opening is now being filled up with debris to protect the mine from the river Keekle, which flows in close proximity; in some places, indeed, the ore extends under the river. The ore in this part of the mine has been proved to a depth of about 200ft., and there is still ore below the bottom level, though how much deeper it may extend it is at present impossible to say.

Newspaper transcript kindly provided by
West Cumbria Mines Research.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Stirling, John    Mine Owner  



Links to Collieries/Mines mentioned in this article

 

Montreal (Iron Ore)  Montreal (Iron Ore)


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print