Logo Museum
Museum
Friends of Durham Mining Museum
Events Calendar
e-Books and Books for sale
Photograph Gallery
Document Archive
Main Document Archive
Newspaper Articles
Articles by date
Articles by colliery
Personal name index
Local Record Extracts
D.M.A. Document Archive
Transactions of I.M.E.
Miners' Welfare
N.C.B. Archive
The Colliery Engineer
The Colliery Guardian
Mine & Quarry Engineering
Mining Journal
The Science and Art of Mining
Coal Magazine
Coal News
Coke and Gas
Master Name Index
What's new in the site
Mining
Mining History
Colliery Index
Colliery Maps
Company Overviews
Who's Who
Mineral Information
Managers Certificates
Educational Material
Bibliography
Statistics
Workers/Employee Lists
Notes for Family Historians
War Service information
Disasters
Disaster Reports
Names of those killed
Disasters in the 1700s
Disasters in the 1800s
Disasters in the 1900s
Memorials
Awards for Gallantry
On this day ...

Links to other sites of interest
Industrial Heritage Days Out
Former www.pitwork.net web site

Index to site

Contact and address details

Share Page with Social Media

Share on Facebook

Share with Reddit

Share on Delicious


 Newspaper Articles Index Newspaper Articles 

3rd December 1874

Ravenglass and Eskdale Railway

Engineer's Report, 25th November, 1874

I beg to report that I visited the works on the 18th, 19th, 20th, and 21st inst. The road is nearly all formed to Nabb Gill, with the exception of the portion through Edward Sharpe's land, which is not as yet in the hands of the contractor, and is the cause of delaying the completion of the formation of this portion, a length of about half a mile.

The high level tip is built up to the level of the wall plates for carrying the cross beams. I am of opinion it will be necessary to place two 5-feet diameter turntables at the end of it for transferring the empty trucks on to the down line as they are discharged into the Furness trucks.

The girders and flooring for the low level section of the bridge at Ravenglass are in place.

The "King of Prussia" Bridge is open to the public.

The contractor's locomotive is working between Ravenglass and three miles fourteen chains, which is half-way between Murthwaite and Walk Mill, the permanent way being laid up to this point.

The contractor has a strong gang of platelayers at work (about forty) and all the necessary permanent way materials. I anticipate, if the weather is favourable and the locomotive kept in working order, that the road will be laid as far as Hollowstones Bridge in about a fortnight. The ore could then be carried over the line from this point and transhipped into the Furness trucks by using Mr. Oliver's branch line to the goods siding at Ravenglass station, until such time as the high level tip is complete and the Furness siding alongside.

A very short space of time would be occupied in laying the permanent way on to the "King of Prussia" Bridge, the distance being only 59 chains, or three-quarters of a mile. The ore could then be run from the "King of Prussia" Bridge. A temporary shoot on the side of the bridge would enable carts to tip direct into our trucks.

On Saturday last 200 tons of rails, 2,040 fish plates, 2,000 sleepers, and one truck of fencing, arrived at Ravenglass, so that there is now every prospect of the line being rapidly completed as far as 5¾ miles, i.e. up to Edward Sharpe's land.

Newspaper transcript kindly provided by
West Cumbria Mines Research.


Names mentioned in this article

 

 Name  Age  Occupation  Notes 
Oliver, —      
Sharpe, Edward    Land Owner  


 

mail
Mail:
Webmaster
Back
Back
Home
Home
Open Government Licence   Contains public sector information licensed under the Open Government Licence v3.0.

Copyright © 1999-2024 by The Durham Mining Museum and its contributors
Registered Charity No: 1110608
Page last updated: 28 Nov 2022

Privacy Policy
 
Terms & Conditions
 
Search
Search
Print
Print