21st June 1870
Caldbeck Fells Mines
The following is the last report upon the working of the mines of the Caldbeck Company: — "P. Hawke, R. Trevarthen, June 1: We have completed Lainton's engine-shaft 10 fms, below the 20, or 30 fms., below the deep adit. We shall
now proceed forthwith with crosscuts, one south from shaft to intersect with both north and great south lodes, and the other north from said shaft to the great copper and Silver Gill lodes at this level. We expect daily to reach the Silver Gill lode in
the cross cut north from engine-shaft, in the 20 fm. level; the foregoing remarks are strictly applicable to our position in the cross-cut south from said shaft to the great south lode. The ends east and west of junction shaft in the 20, on the north
lode, are worth in the aggregate 18 to 20 cwts, of lead per fathom. The cup west in the 10 from this shaft, on the north lode, which has been poor for 3 or 4 fms., now shows indications of becoming productive. The 10 east, on the north lode, is worth
lead for 12 cwts. per fathom. The end southeast from shaft, in this level, on the counter lode, is worth for lead 15 cwts. per fathom. The winze on the north lode below the deep adit, and 25 fms, to the east of junction shaft is being sunk to communicate
with 10, and is worth for copper 2 tons, or £36 per fathom. The winze on said lode below the deep adit, and 30 fms., west from said shaft, to communicate also with the 10, for ventilation &c., is worth lead copper 20 cwts per fathom. We have
evidently a junction of lodes in the deep adit west. We have placed the dial on the course of the new coroner, and find it's bearing to be 44 deg, to the north of east and south of west, instead of 14 deg. to the north of east and south of west, which is
the true bearing of the north lode. The whole thing at the point of intersection is from 13ft. 6in to 16ft. wide. We have therefore, commenced to drive east and west on the hanging-wall and shall carry 4½ to 5ft of the lode, which will yield in the
aggregate for that width 2 tons of blue lead per fathom. We are pleased to state that the stonebreaker is an important acquisition as regards despatch and economy on the dressing-floors. We have been experimenting with the two four-compartment jiggers on
ore of rather low percentage, and we are so satisfied with the result of the experiment that we have purchased two more four-compartment jiggers, and are fixing the same with all despatch. We expect to sample on the 4th instant 100 tons of ore."
Newspaper transcript kindly provided by
West Cumbria Mines Research.
 |
 |
|
Names mentioned in this article
|
 |
 |
| Name | Age | Occupation | Notes |
| Hawke, P. | | | |
| Trevarthen, R. | | | |