|
7th October 1869 Important Mining Case — Steward v. JonesMr. Quain, Q. C., the arbitrator in this case, has just made his award, and has given the plaintiffs £6,500 damages, with the costs of the reference and award; which decision, according to the terms of the order of reference, carries with it the costs of the action. The plaintiffs are trustees claiming under the late Isabella Fletcher, of Whitehaven; and the defendants are the executors of the late Anthony Hill, of the Plymouth Iron Works, in South Wales. The action was brought in June, 1867, for the recovery of damages for improperly working an iron ore mine, situate at Moor Row, about three miles from Whitehaven, held by the defendants under an agreement made in April, 1846, between Miss Fletcher and Mr. Hill, for a term of 21 years, which expired on the 25th March, 1867. Mr. Kay, Q.C., and Mr. Charles Crompton, instructed by Mr. Postlethwaite, of Whitehaven, one of the plaintiffs, and Messrs. Gray, Johnson and Mounsey, of Gray's Inn, were counsel for the plaintiffs; and Mr. Jones, Q.C. instructed by Messrs. Upton, Johnson and Upton, of Austin Friars, was counsel for the defendants. The first and material declaration stated that the defendants were tenants to the plaintiffs of the mines in question on certain terms — amongst others, that they would work the mines in the best and most skilful manner; that they would leave sufficient roofs and pillars for preventing the pits, shafts, levels, &c., from being closed up and crushed until the same were fairly wrought out; and that, at the end of the tenancy, they would surrender the mines to the plaintiffs in a fair working state and condition; and the roofs and pillars of such of them as should be unexhausted well secured and supported; and all levels, pits, shafts &c belonging to the mines and works and then in use, in good and sufficient order and condition for the future working thereof. Upon this count five breaches were assigned: — The 1st claiming for some land which the defendants had taken up in the course of the works. — 2nd and 3rd that they had not worked the mines properly. — 4th that they had not left sufficient roofs and pillars. — 5th that the mines were left at the end of the term in a bad and unfair working state and condition; and with the roofs and pillars of the unexhausted parts badly secured and supported; and with the levels, drifts, &c., then in use, in bad and insufficient order and condition for the future working of the mines, and with certain of them, which are necessary to be kept open for the future working of the mines, filled up, demolished, and injured to the great damage and deterioration of the mines. The defendants pleaded — 1st, denying the tenancy. — 2nd, denying the several alleged breaches; and — 3rd, they paid into court £71 10s, the sum claimed for land taken up; and upon the two first pleas issue was joined. By an order of Mr. Justice Bramwell, made in July, 1869, the action was referred to Mr. Quain, Q.C., who viewed the mines, and held together 38 sittings, 28 of which were occupied in hearing the evidence on both sides, seven by defendants' counsel in summing up, and three by plaintiffs counsel in reply. The sittings were held at different places — five at different times in London, and the others at Whitehaven, Grange, Malvern, Keswick, and Brighton. The plaintiff's witnesses were Mr. J. L. Burns, the lessee of the mines, Mr. Forster, of Newcastle-upon-Tyne, Mr. Marley, of Darlington, Mr. Dixon, Whitehaven, mining engineer, Mr. Hodgetts, Whitehaven, mining engineer, Mr. Kirkconel, manager of Cleator Moor Furnaces, Mr. John Wilson, a lessee, Mr. Kitchin, overman, Mr. Irving, overman, Mr. Nicholson, overman and 20 miners. The defendants witnesses: Mr. Wadham, Dalton-in-Furness, Mr. Turner, Dalton-in-Furness, Mr. Adams, Ferndale, South Wales, Mr. Bewick, Haydon Bridge, Northumberland, mining engineers, : Mr. Davidson, Mr. Grey, Mr. Musgrave, Mr. Barrett, manager. The Moor Row Estate contains 75 acres, of which about 20 were opened and worked by the late Mr. Hill, but of these about five acres on the west were sub-let to the Bigrigg Iron Ore Company; six acres on the North-East, called Robin Bend, to Messrs. Lindow; and the remaining nine acres constituted the portion worked by the defendants and called Fletcher Pit. It appears that in February, 1825, Mr. Hill took on a lease for 40 years, from the Earl of Egremont, a very large part of the iron ore royalty in the Lordship of Egremont, in West Cumberland. The provisions of this lease, which it will be seen are important in reference to this action, very carefully direct the mode in which the mines are to be worked during the term, and left at its conclusion. About the same time, Mr. Hill, also took several small royalties in the neighbourhood of Whitehaven, on agreements for terms of 21 years, among which was the Moor row Royalty, which was situated within 200 yards of the boundary of Mr. Hill's Egremont royalty. These agreements are generally of the same character as the agreement for the Moor Row royalty, which was made in April, 1825, and contained, besides, in a workmanlike manner, a special provision that the lease be granted should "contain all the provisions, covenants, stipulations and agreements therein before contained in leases of similar nature in the same neighbourhood, and particularly in leases of ore granted by the Earl of Egremont. "The first agreement between Miss. Fletcher and Mr. Hill expired in 1846, when an agreement for a further term of 21 years, in similar terms, and containing the same special clause, was entered into between the parties. It was upon this agreement that the action was brought. Mr. Hill did not raise any ore from the estate during the first agreement, nor did he commence to raise ore under the second agreement until March 1860, when seven years from the term remained unexpired. From this date it was proved that Mr. Hill and his sub lessees raised 373,407 tons, which, at the average market price would produce £242,714; and after deducting 5s per ton for royalty, interest on capital, and working expenses, a net profit of nearly £150,000 would remain for the seven years, being at the rate of upwards of £21,000 per annum. Mr. Hill died in August, 1862, and the defendants, his executors, continued to carry on the mines. It appears that in the year following they entered into an agreement with the gentlemen forming the Plymouth Iron Company in South Wales, to sell them for £250,000, a large amount of property belonging to Mr. Hill in Wales, together with "the ore in stock, and to be raised during the remaining period of the Whitehaven leases, to be delivered free on board ship there, at 9s 6d per ton, and the quantity to be maintained as far as possible." At the time of this agreement there were about two years to run in the Egremont lease, and four years in that of Miss. Fletcher. The average price of ore during these four years was about 14s per ton at the pit top, or 15s 6d delivered free on Board at Whitehaven. In the month of May, 1866, ten months before the end of the lease, it came to the knowledge of Mr. George Dixon, the plaintiff's check viewer, that the defendants had removed some of the iron ore pillars, and intended to remove others, and he thereupon gave the following notice: May 9th, 1866" Dear Sir, — I forward you enclosed a tracing plan of the Fletcher Pit, showing a portion of the workings and the pillars supporting the roofs and roadways of the mine, and I have to request that none of the pillars shaded or tinted brown may be removed, taken away or diminished, but left as they now stand and are shown on the plan, for the proper sufficient support of several roadways, air and watercourses, and the support of the surface works, and which require to be left in an open and efficient state for the future working of the mine, and the unwrought portion of the royalty. I am &c., "George Dixon." Jas Davidson, Esq., Moor Row Mines, Whitehaven. "At this time there were 35 iron ore pillars supporting the mine, all of which Mr. Dixon required to be left. On receiving this notice the defendants called in Mr. Wadham, the mining engineer, to report upon it, furnishing him with extracts from the Egremont lease. His report bears the date 18th June, 1866, and in it he recommended that nine of the pillars on the west side of the workings, which Mr. Dixon had required to remain, might be removed; and as to the remaining pillars, he reported as follows: "I find that a considerable quantity of ore yet remains to be worked away from the north-east end of the workings, and I consider that all pillars necessary for the upholding of the tramway from this part of the working to the 'pits-eye' should be left untouched. "The defendants it would appear, very soon after this report of Mr. Wadham, called in another gentleman, Mr. Adams, and these gentlemen then made a joint report , which is as follows: September 10th, 1866 "Fletcher Iron Ore Pit, Bigrigg, Cumberland. Dear Sir, — In accordance with your request, we have read over Mr. Dixon's letter to Mr. Davidson of the 9th of May last, and examined the tracings from the mine plan accompanying it, on which he has coloured the pillars he desires may be left. "We have also read the extracts from the Egremont lease of this mine to the late Mr. Anthony Hill, referring to the working of the mine, and have subsequently and separately visited the mines and carefully examined them. "The lease provides that the lessee 'shall and will leave sufficient roofs and pillars for preventing the pits, shafts, soughs, levels, or groves, from being closed up and crushed until the same are fairly wrought out, and all the mines, ores, minerals, and metals and substances hereby demised. "We find that the ore on the north-west of the property, and which in the accompanying tracing is tinted brown, has been worked, and so also on the east where the roof has fallen in. "We recommend that a double shift of men be put on in every possible place for getting ore, and that the face or north workings be pressed forward with all dispatch, also that the present inclined plane be lengthened to the rise as shown in tracing, and a new line of tramway be laid from this point to the face of the workings as shown by dotted blue line, with the exception of about 11 yards between C and D, the road can be laid very shortly and the distance between these points can be driven and cleared in about 8 weeks, as men can be put on at both places. "This done, we recommend the removal of the whole of the ore pillars marked with pink lines, leaving these shaded pink and lettered 'A' entire. This we think will be ample support for the safety of the mine, and for the future workings of the pit, and quite in accordance with the provisions of the lease. "By this working with a double shift of men, we think 1,000 pit tons per fortnight may be obtained for the remainder of the term of your lease. — We are, &c., "Edward Wadham" William Adams. The plaintiffs, on the other hand, contended and gave evidence to show that the mode of working adopted by the defendants in the last year of the term was wholly unjustifiable and contrary to the usual and proper mode of working such a mine; that during this time the defendants had proceeded to get as much ore as they could without regard to the safety of the mine or the condition in which it should be left at the end of the term that the mine was not exhausted, and especially that there were large deposits of ore above the flat ore already worked; that these deposits consisted of guts or channels of ore rising from the roof of the flat ore, widening upwards to the whirlstone roof, a height of about 40 feet, and running north and south the whole length of the mine; that they varied in width at the bottom from a few inches to three feet, frequently expanding to a very large deposit under the whirlstone; that there were at least ten such unworked guts in the Fletcher mine, some of which ran into Messrs. Lindow's adjoining mine, called the Walsh mine these guts had been worked out and cleaned out before any of the pillars which supported them were removed; that this mode of working ought to have been adopted in the Fletcher mine, and that by removing the pillars and letting the roof fall, as the defendants had done, the chief part of those upper deposits was entirely lost, and such part of them as might be afterwards obtained by drifting, as the defendants suggested, would be greatly deteriorated by a mixture with the fallen debris; that the mode of working adopted by the defendants' was a bad and improper one, and had failed to bring the ore down from the guts, which would be seen still hanging there above the falls, where it must necessarily remain, owing to the formation of the upper part of the gut acting as a shelf in keeping it up; that the mine was left by the defendants in an altogether unsafe and ruinous condition; and it was due solely to the massive limestone pillars built by Messrs. Lindow that any part of it was still open; and , lastly, that the defendants were bound by the Egremont lease, and that their mode of working was a direct breach of its provisions, which, as well as requiring that the mine should be skilfully worked, prescribed when the pillars should be left and when they might be removed, showing how proper mining was to be interpreted; and that, under the provisions, the defendants had no right to take any pillars until all the ore had been obtained in the part which such pillars supported. The evidence on both sides was given at great length on these various points, and was of the most conflicting nature. The defendants contended and gave evidence that the guts of the width of three feet were not commercially workable, and it appeared that they had not paid higher wages for working gut ore than 7s per pit ton; while the plaintiffs evidence went to show that the Bigrigg Company were working guts in the part sub-let to them by Messrs. Lindow of the width of 14 inches, which they could do profitably at wages amounting to 17s a pit ton; and that the smallest indications of ore ought to be explored, as they frequently led to large upper deposits, as was proved in the case of one of the Fletcher guts, which at its commencement was a mere string, and afterwards expanded into a large body of ore. The defendant's scientific witnesses also alleged that the limestone pillars built by Messrs. Lindow to support the roof and keep open the roadways were of no use, and the expenditure upon them wholly thrown away. The decision is as given above.
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
![]() |
||||||||
|
Mail: Webmaster |
Back |
Home |
Copyright © 1999-2024 by The Durham Mining Museum and its contributors Registered Charity No: 1110608 Page last updated: 28 Nov 2022
|
Search |
|
|||